Laserfiche WebLink
INSPECTION REPORT <br /> _ Date —i7 Permit: Ul ?O S — 03 <br /> Contractor: "MS__ <br /> Owner: Q1 CQY)- O eci 001c <br /> V � Y � <br /> Site Address: ! 1 5- 3 I slow �`,� LQf cQ)O <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> Cl Service ❑Framing ❑Rooftop UnitsWater Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final [fl Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ['Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> A Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> [ow Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> � <br /> OTHER OR CONSULTATION:V <br /> e Seuter <br /> w APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> •1 F P... <br /> � _ ela �.s . \ i_ `r <br /> Date: <br /> Inspecto • _ �W^� <br /> EIR(10/06) DATABAR,INC. <br />