Laserfiche WebLink
programs. The program will be reflected in the 1994/95 Six-Year Program that will be <br /> adopted in 1994. The program will be refined and possibly revised with more refined cost <br /> and revenue information within six months of Comprehensive Plan adoption. <br /> HiEhliEhts of Six-Year Program: ADDED <br /> • Total six-year transportation investment for all jurisdictions of$314 million <br /> • Total six-year commitment from Everett of$81 million <br /> • $49 million or 60%of Everett's share for maintenance, operations and administration <br /> • $18 million or 22%of Everett's share is Boeing Expansion Mitigation., another$22 million in <br /> Boeing mitigation for State or County <br /> • Assumes RTA, voter-approved,transit funding during six-year period.totaling about $60 million <br /> available in the Planing Area for enhanced transit service investments, including establishment of <br /> commuter rail service on existing BNRR <br /> • Partial completion of I-5 HOV lanes, Airport/SR96 HOV <br /> • Completion of I-5/526 interchange and SR-525 regional arterial to SR-526 <br /> Table 5 <br /> Recommended Six-Year Investment Program REVISED <br /> Everett Preferred Plan <br /> TOTAL6 Year 1, 6 Year Beyond <br /> PROJECT FROM TO 'DESCRIPTION COST [ EVERETi1SVFed/Olh 6 Year <br /> (Thousands of 1993 Dollars) <br /> I I f <br /> 1-5 HOV Lanes 164th rSR-526 Add HOV lanes to $50.000 $25.000 $25.000 <br /> preeway 1 <br /> Airport Rd HOV Lanes Casino Rd SR-99 Complete HOV probed: $4.700, $250 $4.450 <br /> 7 lane multimodal - <br /> SR-964 5 Interchange I--0V Improvements .Construct HOV facilities $2,000I. $2.000 <br /> on ramps and overpass <br /> SR-96 HOV lanes 1-6 bumas iArtenal NOV lanes $3.000 - $3.000 <br /> d features <br /> SR-99 HOV Treatrnent SR-525 '5R-526 I HOV treatments $1,000 $1001 $9001 <br /> I and transit pnordy <br /> Revise I-55R-526 Int ,At 15 and SR-526 Add eastbound to $15,000 $12,000 $3.000 <br /> e <br /> orthbound ramp <br /> SR-526 HOV Evergreen 129th 'First phase HOV bypas! $4,000 $4,000 <br /> I lane onto 1-5 to 1291h <br /> HOV treatment -5/128th St interchangeRevise interchange to $5.000 $3,000 $2.000 <br /> I 1 accommodate HOV <br /> Widen Evergreen Way SR-526 152nd and to 7 lanes with 54.6001 $1,1001 53.500 <br /> rI Multi-modal features <br /> Evergreen/Casino 8.626 red Meyerintersection and $400 $400 <br /> 1 p.oadway improvements <br /> Widen Manne View Dr 18th Broadway Add lane capacity to $5.100 $1,000 $4,100 <br /> Iexisting route <br /> E Mann*View Dr Broadway Add lane capacity to $3.000 $200 $800 $2.000 <br /> existing route <br /> Everett Ave Morton }waterfront Extend Everett Ave to $6.000 $100 $1.900 $4.000 <br /> l waterfront <br /> Collector Arterial StudieNarious locations !Study improvement nee $50 $50 <br /> Interchange- <br /> studies Nanous locations (Study need,type.cost _ $800 $2001 $600 <br /> i526'Evgm.Smith Is <br /> Everett Av/SR2;41 st/5 <br /> 41st Interchange ramp Broadway 4.5 Construct ramp $1,500, $501 $1.450 <br /> 1 Improvements <br /> Gateway and Vanous locations !Landscaping.signs. $150 $150 <br /> boulevard treatments I Median treatment.etc <br /> 100th St SW ,Airport Rd Evergreen Add lane capacity to $5.000 $1001 $100 $4.800 <br /> phis route <br /> 4th Ave W Casino Evergreen Establish arterial cape it $5.000 $100 $500 $4.400 <br /> 19 8 in this corridor 1. <br /> Seaway Blvd 75th Pah Study desiT $2.0001 $50 $1.960 <br /> m-an <br />