Laserfiche WebLink
City of Everett <br /> Capital Facilities Plan <br /> 1995 to 1999 <br /> Fund/Dept. Activity Area Project Name 1995 1996 1997 1998 1999 2000 1995 to 1999 <br /> total cost <br /> Utfitles <br /> Water <br /> Water Distribution (function 119) $1,640,000 $2,960,000 $2,060,000 $900,000 $1,000,000 $8,560,000 <br /> Water Treatment (function 121) $460,000 $1,025,000 $1,690,000 $465,000 $0 $3,640,000 <br /> Transmission Line (function 118) $1,600,000 $700,000 $1,550,000 $1,300,000 $0 $5,150,000 <br /> Sewer <br /> Sewer Collection (function 109) $1,265,000 $1,255,000 $1,095,000 $1,045,000 $985,000 $5,645,000 <br /> Sewer Treatment (function 111) $485,000 $875,000 $335,000 $450000 $270,000 4‘.. $2,415,000 <br /> $5,450,000 $6,815,000 $6,730,000 $4,160,000 $2,255,000 $25,410,000 <br /> TIP <br /> Transportation Plan` <br /> Everett $81,400,000 <br /> 0 State/Federal/Other $233,600,000 <br /> N $315,000,000 <br /> cc <br /> NOTE: The year 2000 estimates from Utilities and the annual TIP breakdowns <br /> were not available in time for this draft. <br /> • See six year Transportation Improvement Program Plan <br /> for a details, a summary is attached. <br />