Laserfiche WebLink
EVERETT COMPREHENSIVE PLAN 1 <br /> ECONOMIC DEVELOPMENT ELEMENT <br /> dustrial area had extensive planning and and commercial uses as well as recreational <br /> 111 <br /> infrastructure investment in the late 1970's opportunities. <br /> and 1980's. Boeing has constructed the <br /> I <br /> largest building project in the state in With the City's purchase of a substantial por- <br /> Southwest Everett. The Everett Mall area is tion of the western bank of the Snohomish <br /> a major retail center for the County. This River, the City not only becomes a major <br /> section describes some of the potential areas regulator, but the potential developer of this <br /> within Everett's Planning Area for expanded resource. This gives the City real control <br /> economic growth. over its uses--residential, recreational, com- <br /> mercial, industrial, or open space. It can be <br /> 1. Marine Waterfronts. Everett has two converted into a number of viable uses. This <br /> major waterfront areas on the peninsula area is encouraged to redevelop with high I bounded by the Snohomish River and Port quality development that provides public <br /> Gardner Bay. access to the river shoreline and includes a <br /> variety of activities and uses that improve this <br /> I <br /> Few places along the extensive Puget Sound highly visible part of the city. <br /> shoreline allow or encourage commercial or <br /> industrial development. Everett, however, 2. Everett Mall. This area has been <br /> I <br /> presents some rare opportunities for commer- developed on large parcels at the junction of <br /> cial and industrial development on either the highways and freeways. The future addition <br /> Port Gardner Bay waterfront or the river of a regional high capacity transit center <br /> I <br /> front. Everett has a deep water port where could further enhance it as a site of <br /> water dependent activities are encouraged, commercial and residential use. To some exIlk <br /> - <br /> and a barge channel, adjacent to developable tent, it competes for future development <br /> industrial land, which is maintained by the potential with the Everett CBD. It is now the <br /> Corps of Engineers. retail center of Everett and is emerging as a <br /> new concentration of office space in an area <br /> On the river front [the river continues around with a growing amount of multifamily <br /> the peninsula and is separated from the sound development. This area will figure promi- <br /> by <br /> I Jetty Island], a mix of water dependent nently in the city's future growth plans as <br /> and water related uses is encouraged. The additional retail and residential development <br /> examples of uses include marine services, intensify the area. <br /> I <br /> public activity areas--boat launches, marina, <br /> marine supplies--and the retail area known as 3. Central Business District (CBD). If <br /> Marina Village. Because of the challenges of Vision 2020 is implemented under the <br /> I <br /> diversity and opportunities for growth, Growth Management Act and Regional <br /> further development will need careful Transportation Plan, the Everett CBD will <br /> coordination to address potential conflicts emerge as a major development area. Any <br /> I <br /> between multiple uses, expansion of uses, and discussion of land use and development <br /> environmental constraints. Large industrial potential in the region uses terms that <br /> tracts located along the Snohomish River typically describe CBDs because so much is <br /> II <br /> have undergone a transition from active already in place. The terms include existing <br /> manufacturing areas to vacant parcels of land. infrastructure, integrated uses, more dense <br /> Everett's waterfronts can provide additional development, high capacity transit, mixed-use <br /> opportunities for significant growth in diverse <br /> water-dependent and water-related industrial <br /> ED-10 <br />