My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2021-94
>
Ordinances
>
Ordinance 2021-94
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2019 11:57:15 AM
Creation date
4/19/2019 11:55:37 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2021-94
Date
8/3/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT COMPREHENSIVE PLAN <br /> LAND USE ELEMENT <br /> City-owned Chaplain Area watershed, which appropriate design standards which make 41111 <br /> is located outside of the Everett Planning Area higher densities more compatible with existing <br /> and the Urban Growth Area for Snohomish neighborhoods. <br /> County, includes lands currently managed as <br /> commercial forest lands. It is anticipated that The GMA requires a separate Housing <br /> timber harvesting will continue to be practiced Element which includes an analysis of housing I <br /> on these lands, in accordance with applicable conditions and projected housing needs in the <br /> forest practices regulations and watershed Housing Element section of the compre- <br /> management plans. hensive plan. Rather than repeat that <br /> information herein, the projected land use <br /> • c. Housing: Residential uses make up the needs as a result of future housing demand are <br /> largest category of land zoned for urban use in addressed by the land use designations of the <br /> the Everett Planning Area (approximately Land Use Map of the Land Use Element. <br /> 9,544 acres, or 63 percent of the net land Potential implementation strategies to meet <br /> area). Housing is also allowed in most housing demand are identified in the Housing <br /> commercial zones, either as a permitted use or Element. <br /> part of a mixed use development. The <br /> population target established for the In addition to increasing housing opportunities <br /> comprehensive plan proposes that the Everett and residential densities, the key recommenda- <br /> Planning Area will grow by approximately tions of the Housing Element that will affect <br /> 45,000 additional persons between 1990 and the Land Use Element include: <br /> 2012 to approximately 150,000. <br /> 1) encourage a greater variety of housing <br /> Based upon the population holding capacity of types as an alternative to the currently <br /> the pre-GMA comprehensive plans in effect in predominant housing types, which are large <br /> the Everett Planning Area, more land must be scale apartment complexes and the low density <br /> designated for residential use, existing single family detached housing types. <br /> residential land must be designated for higher <br /> densities, additional population must be 2) encourage a variety of housing types in <br /> located in non-residential areas, or a both existing and new neighborhoods. <br /> combination of all of the foregoing must be <br /> implemented. 3) encourage multiple family development to <br /> be more compatibly integrated with sur- <br /> A key consideration in addressing adequacy of rounding neighborhoods. <br /> housing supply and densities is the impact of <br /> additional housing and higher densities upon 4) encourage high density housing around the <br /> neighborhood character. Everett residents downtown core, job centers, and activity <br /> have expressed a strong desire and need to centers such as proposed transit stations. <br /> protect neighborhoods from wholesale land <br /> use changes that negatively affect the livability 5) encourage the development of mixed use <br /> of the community. The Everett Vision 2000, residential and commercial centers in commer- <br /> Snohomish County-Wide Planning Policies, cially zoned areas. <br /> and PSCOG VISION 2020 Growth and <br /> Transportation Strategy (Multi-County Plan- 6) encourage a higher rate of owner occu- <br /> rring Policies) emphasize the need to promote pancy in Everett's housing stock. <br /> higher densities through the application of ' <br /> LU-6 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.