Laserfiche WebLink
EVERETT COMPREHENSIVE PLAN I <br /> LAND USE ELEMENT <br /> residential developments. Given the and related manufacturing activities and areill <br /> abundance of retail space in the Everett now vacant or used for low intensity log <br /> Planning Area cited above, and the need to storage. Another large industrially zoned <br /> accommodate more population than pre-GMA aggregates mining area has a short remaining <br /> land use designations provide for, it may be life expectancy and is expected to be reclaimed <br /> desirable to determine how existing for industrial use. <br /> I <br /> commercial areas may be re-developed <br /> efficiently and how they may be made to f. Recreation: Within the Everett Planning <br /> integrate housing along with commercial Area, there are 1,420 acres of public <br /> 1 <br /> services. park/recreation/public open space lands, or 5.4 <br /> percent of the gross land area. This includes <br /> e. Industry: The Everett Planning Area has public school facilities used for recreational 1 <br /> a large inventory of undeveloped industrially purposes, active and passive park lands. This <br /> zoned land. Of the approximate 5,101 acres translates to a standard of 12.7 acres per <br /> I <br /> of industrially zoned land (27% of the total net 1,000 residents (1992 population). However, <br /> land area), only 49 percent, or 2500 acres, is as the table below illustrates, the location of <br /> presently developed. However, much of the the existing inventory of park land within the <br /> inventory of vacant industrial land is affected sub-areas of the Everett Planning Area is out <br /> by environmental constraints, reducing the of balance. In other words, the bulk of the <br /> amount of vacant and developable industrial park land inventory is located in sub-areas 1, 2 I land to approximately 1,437 acres. Most of and 5. When the "passive" or undeveloped <br /> the vacant and developable industrial land is park lands, much of which are environmentally <br /> located in the southwest Everett/Paine Field sensitive areas, are subtracted from the <br /> area, where few constraints to development inventory, the overall ratio of active park land It <br /> exist. Still other large industrially designated to population is extremely low in three of the <br /> areas are located along the Snohomish River, six planning sub-areas, and with projected <br /> I <br /> in the delta flood plain, or on the Everett population growth, will be inadequate to serve <br /> harborfront, where there are more shoreline, the future population. This suggests that park <br /> environmental, access or infrastructure con- land acquisition needs are the greatest in sub- I <br /> straints. Some of the waterfront industrial areas 3, 4 and 6. <br /> areas have seen a decline from wood products <br /> Area 1 Area 2 Area 3 Area 4 Area 5 Area 6 Total I <br /> Acres Park& 565 453 96 18 249 39 1,420 <br /> I <br /> Rec./Public <br /> Open Space <br /> Ac. Park& 20.9 19.3 25.5 2.5 8.2 2.1 12.7 <br /> I <br /> Pub. Open Sp. <br /> per 1,000 Pop. <br /> 1992 <br /> Ac. Park& 437 237 11 18 248 38 980 <br /> Rec.w/o Pub. <br /> Open Space <br /> Ac. Park& 16.2 10.1 2.9 2.5 8.2 2.0 8.8 1111 <br /> Open Sp. per <br /> 1,000 Pop. 1992 <br /> 1 <br /> LU-8 <br /> I <br />