Laserfiche WebLink
111 <br /> EVERETT COMPREHENSIVE PLAN <br /> LAND USE ELEMENT <br /> b) The city shall use the shoreline permit and <br /> environmental review process to identify and 1.14.1 Flooding: The areas within the <br /> mitigate environmental impacts resulting from Everett Planning Area which are subject to <br /> shoreline activities. frequent flooding are regulated by the <br /> requirements of either Section 30 (Floodplain <br /> 1.12.8 Water Quality. Shoreline uses and Overlay Districts) or Section 37 (En- <br /> developments have the potential to directly vironmentally Sensitive Areas) of the zoning <br /> impact the quality of abutting waters. code. The floodplain areas in Everett are <br /> Increasingly strict State and Federal water located in the floodplain or on the flood fringe <br /> quality regulations, as well as the community's of the Snohomish River. The requirements of <br /> desire for a clean environment, necessitate Section 30 of the zoning code have been <br /> special consideration to ensure that future approved by the Federal Emergency <br /> shoreline activities do not adversely affect Management Agency as meeting the <br /> water quality. All future shoreline uses shall requirements of the Federal Insurance <br /> incorporate storm drainage and sewage Administration. The floodplain and flood <br /> treatment measures, proper handling of fringe areas are also regulated under the City's <br /> hazardous materials used and stored on site, Shoreline Master Program, which applies <br /> and remediation of existing site contaminants additional requirements to specific de- <br /> to ensure that they do not pollute the waters velopment proposals to reduce potential flood <br /> of Everett's shoreline. related impacts. Some of the "special study <br /> areas" identified in Section 0.15 are located <br /> 1.13 Building Intensities: The Growth within areas within the floodplain or flood <br /> Management Act requires that the Land Use fringe and under the jurisdiction of the SMP. <br /> Element address the intensity of development Additional studies which may be conducted <br /> desired for different areas. Building intensity within these areas will address flood related <br /> is commonly expressed in a variety of impacts and mitigation. <br /> manners, such as building bulk, building <br /> height, lot coverage, floor area ratios, and The requirements of Section 37 of the zoning <br /> open space ratios. code have been developed in accordance with <br /> the Washington State administrative guidelines <br /> 1.13.1 The permitted building intensities for for environmentally sensitive areas, which are <br /> the Everett Planning Area shall be allowed as used to implement the requirements of the <br /> currently specified by the Everett Zoning Growth Management Act. In addition to <br /> Code. The zoning standards shall be evalu- these two sections of the zoning code, the <br /> ated and periodically revised as necessary to South Everett Drainage Basin Plans have <br /> implement the land use concepts desired for all identified specific flooding problem areas and <br /> portions of the Everett Planning Area. physical improvements or programs necessary <br /> to alleviate flooding. <br /> 1.14 Flooding, Surface Drainage, and <br /> Water Quality: The Growth Management a) The city shall continue to use and update <br /> Act requires that the Land Use Element Sections 30 and 37 of the zoning code and the <br /> include a description of the effects of the land South Everett Drainage Basin Plans to control <br /> use plan on flooding, surface drainage and flooding problems. <br /> water quality, and remedial actions required to <br /> prevent or alleviate problems. Each will be 1.14.2 Surface Drainage: Surface drainage is <br /> described herein. regulated by the Everett Drainage Ordinance. <br /> LU-47 <br />