Laserfiche WebLink
Y INSPECTION REPORT <br /> ^ <br /> ice f & I Coad 6 LI a <br /> r <br /> 15 <br /> .. Date � l Permit: <br /> Contractor: <br /> \, ` <br /> Owner: ei' 1\1 — — <br /> Site Address: f I J 31 i4 Dv. <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing [Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof dra" s ❑Building Final ❑ <br /> Gas Pipe Final ❑HWT Final <br /> OTH OR CONSULTATION: MYT\)yAkh,YIL__ ______ <br /> APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> OK FOR T.C.O. ❑ CORRECTION REQUESTED El <br /> OK FOR C.O. El VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSP CTION—24 hour notice required <br /> jyp - G 6el 'e) --e fir-- <br /> Inspector: Date: <br /> 3 -` /g <br /> EIR(10/06) DATABAR,INC. <br />