My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3419 31ST DR 2019-04-23
>
Address Records
>
31ST DR
>
3419
>
3419 31ST DR 2019-04-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2019 2:22:52 PM
Creation date
4/23/2019 2:22:47 PM
Metadata
Fields
Template:
Address Document
Street Name
31ST DR
Street Number
3419
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GE, z )1 3)s+ FIELD R�ESIGI�_ Dir 1 of 3 <br /> Project Name: Everett River Front-Eclipse (3) Report: 045 <br /> GeoDesign#: Polygon-128-03 Date: 12/20/2017 <br /> Reports with Unresolved Nonconformance Issues: Permit: <br /> PW1504-055 <br /> Nick Abdelnour(Polygon) Randy Allen(City of Everett) Weather: Cloudy,40's <br /> Ron Bowen(Polygon) Eddy Stevens(Polygon Homes) Arrival/Departure: 1630/1700 <br /> Distribution: <br /> Doug Ross(Polygon) <br /> Paul McKee(City of Everett) Prepared By: Benjamin Weinberg <br /> Attachments: ElSite Plan(s) 0Density Test Summary Signature: S'y:-.. <br /> ❑ Installation Records 0 Other �... _.- <br /> Reviewed By: <br /> PURPOSE of VISIT: GeoDesign representative, Benjamin Weinberg,was on-site part time at the request of Craig with <br /> DDS to observe the mat foundation subgrade for Building 11. <br /> SUMMARY OF OBSERVATIONS: <br /> BUILDING 11 -MAT FOUNDATION SUBGRADE OBSERVATIONS: <br /> Today, GeoDesign noted that DDS had completed excavation of the mat foundation area for Building 11. The exposed <br /> foundation subgrade generally consisted of a gray-brown silty SAND with gravel which could be probed less than 2 inches <br /> using a 1/2 inch diameter soil probe. <br /> Relative compaction of the exposed mat foundation subgrade material was tested using a Troxler Moisture-Density gauge; <br /> in-place density tests indicated that the material had been compacted to greater than 95% of its maximum dry density as <br /> determined by a Modified Proctor analysis. <br /> GeoDesign noted that the east 1/4 of the building area required approximately 2-4 inches of over-excavation to remove <br /> surficially loose and saturated material. <br /> It is the opinion of GeoDesign that the exposed mat foundation subgrade is currently suitable for support of the intended <br /> structure. We recommend that any surficially loose and saturated material that may build up beneath the foundation area <br /> during excavation of internal utility trenches be removed prior to installation of the vapor barrier and capillary break material. <br /> The contractor was notified of our observations prior to our departure from the site today. A summary of our observations <br /> can be found in the attached Figure 1 and Nuclear Density Gauge Data. <br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and <br /> specifications throughout the duration of the project irrespective of the presence of our representative.Our work does not Include supervision or direction of the contractor,the contractor's employees <br /> or agents. Our firm is not responsible for site safety.This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations.The report can only be considered <br /> final upon review of the GeoDesign project manager,as indicated by initials in the"Reviewed By"section. <br /> 10700 Meridian Avenue North,Suite 402 I Seattle,WA 98133 I 206.838.9900 <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 I 253.203.0095 <br />
The URL can be used to link to this page
Your browser does not support the video tag.