GE ; DESIGN )S+ Pr FIELD REPORT <br /> 1 of 2 <br /> Project Name: Everett River Front-Eclipse(3) Report: 042 <br /> GeoDesign#: Polygon-128-03 Date: 11/29/2017 <br /> Reports with Unresolved Nonconformance Issues: Permit: <br /> PW1504-055 <br /> Nick Abdelnour(Polygon) Randy Allen(City of Everett) Weather: Cloudy, 50's <br /> Ron Bowen(Polygon) Eddy Stevens(Polygon Homes) Arrival/Departure: 1545/1600 <br /> Distribution: <br /> Doug Ross(Polygon) <br /> Paul McKee(City of Everett) Prepared By: Benjamin Weinberg <br /> Attachments: ❑ Site Plan(s) 0 Density Test Summary Signature: .rte �. <br /> %,- <br /> Li Installation Records ❑ Other Reviewed By: <br /> PURPOSE of VISIT: GeoDesign representative, Benjamin Weinberg, was on-site part-time at the request of Craig with <br /> DDS to observe mat foundation subgrade for Building 14. <br /> SUMMARY OF OBSERVATIONS: <br /> BUILDING 14-MAT FOUNDATION SUBGRADE OBSERVATIONS: <br /> Previously, GeoDesign noted two areas along the west side of Building 14 which could be probed 1-3 feet using a 1/2 inch <br /> diameter soil probe. Today, GeoDesign noted that DDS had over-excavated the previously identified area down to a <br /> gray-brown silty SAND with gravel which could be probed less than 1 inch using a 1/2 inch diameter soil probe. The area in <br /> the northwest corner of the building had been over-excavated approximately 3 feet. The area in the southwest corner of the <br /> building had been over-excavated approximately 1 foot. The over-excavated areas had filled with 4-8 inches of water prior <br /> to our arrival. <br /> It is our understanding that the over-excavated areas will be dewatered and backfilled with a 2-inch clean crushed rock <br /> tamped into a firm and unyielding mass during backfilling of interior plumbing trenches scheduled for a later date. <br /> A summary of our observations can be found in the attached Figure 1. <br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and <br /> specifications throughout the duration of the project irrespective of the presence of our representative.Our work does not Include supervision or direction of the contractor,the contractor's employees <br /> or agents. Our firm is not responsible for site safety.This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations.The report can only be considered <br /> final upon review of the GeoDesign project manager,as indicated by initials in the"Reviewed By"section. <br /> 10700 Meridian Avenue North,Suite 402 I Seattle,WA 98133 I 206.838.9900 <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 I 253.203.0095 <br />