My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3437 31ST DR 2019-04-24
>
Address Records
>
31ST DR
>
3437
>
3437 31ST DR 2019-04-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 9:34:12 AM
Creation date
4/24/2019 9:34:07 AM
Metadata
Fields
Template:
Address Document
Street Name
31ST DR
Street Number
3437
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLICIVORKS PERMIT II pate Applied: 3/8/2018 <br /> y .. City of Everett Public Works Department Publltbrks Permit#: PW1803-019 <br /> � � � 3200 Cedar Street <br /> Parent Permit#: C1604-051 <br /> Everett,WA 98201 Planning Reference#: SUB14-006 <br /> (425)257-8810 Public Works Fee: $65 <br /> 02 APR 2018 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> POLYGON WLH LLC POLYGON WLH LLC <br /> 11624 SE 5TH ST SUITE 100 11624 SE 5TH ST SUITE 100 <br /> BELLEVUE, WA, 98005 BELLEVUE, WA, 98005 <br /> PHONE: 4255867700 PHONE: 4255867700 <br /> TAX PARCEL ID#: SITE ADDRESS: 3437 31ST DR(LOT 141) <br /> DESCRIPTION: NEW TOWNHOME LOT 141 BLDG 15 <br /> THIS PERMIT COVERS SITE WORK FOR THIS TOWNHOME. INCLUDING SEWER, WATER, DRAINAGE AND <br /> DRIVEWAY. <br /> LOT 14t THE TOWNS AT RIVERFRONT SUB14-006 <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. No dirt, mud, rocks, or debris to be tracked onto roadway. <br /> 5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior to starting construction and with <br /> other inspection requests. <br /> 6. Install any erosion control measures as determined by the Public Works Inspector, such as silt fence, straw bales, <br /> swales, or erosion blankets. <br /> 7. Connect side sewer per City Standard#'s 601 through 604. <br /> 8. Connect rooftop downspouts to the drainage system provided for this lot. <br /> 9. All excavated material from foundation, sidewalk, and driveways shall be hauled to an approved, permitted site. No <br /> wasting of material is allowed on this building lot. <br /> 10. No building materials to be stacked on sidewalk/roadway and sidewalk/roadway to be kept clean and open for <br /> pedestrian travel. <br /> 11. Driveway to Garage shall be paved. <br /> 12. The City will not issue a Building final or Certificate of Occupancy until the new sidewalk is installed along this property's <br /> frontage. <br /> az uPublic Works Permit Fee Breakdown: <br /> Driveway $25.00 <br /> PW Plan Review $20.00 APR 0 2 201 <br /> PW Site Inspection $20.00 <br /> CITY OF EVERETT <br /> Permit Services <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save <br /> 11114- -011/111- harmless the City of Everett from any and all claims for damages,costs, <br /> 3 g gag expenses,or causes of action that may arise because of installation and <br /> div O maintenance of the improvement or other right-of-way use here to applied <br /> Approved for Construction (Public Works) Date for and further agrees to remove same upon notice from the City and to <br /> replace public property damaged thereby. <br /> FINAL INSPEC I ION Date gi2A 8 <br /> Approved as Constructed (PW Inspector) Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.