Laserfiche WebLink
INSPECTION REPORT 0L <br /> /,U <br /> . �_ Date l�-�dag C��.VPermit: '�0 53 <br /> 3--------_ <br /> Contractor: <br /> Owner: c);,, _.,,roiASite Address:_3 W I 3 I? r K <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation Z Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing 24Iumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑lyefrigeration ❑Rough in <br /> ❑Roof drains ❑Building�fFinal <br /> 111 Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: u2-5 ._ -5 1j 5 <br /> ElAPPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THI ,111:1?R,' I <br /> ElOK FOR T.C.O. ❑ CORRECTION REQUESTED 1 �'�,) <br /> ElOK FOR C.O. ElVIOLATION WA/. <br /> El UNABLE TO PERFORM INSPECTION: : I <br /> El CALL(425)257-8881 FOR REINSPECTION—24 hour notice required . <br /> Inspector:p Date: /2// -/2 <br /> EIR(10/06) DATABAR,INC. <br />