Laserfiche WebLink
r <br /> INSPECTION REPORT <br /> Date 0 /16 E'W 1(.i ------ <br /> M,� Permit: 7✓ <br /> Contractor: <br /> e .c\\ Owner: f'I�4Jk <br /> Site Address: 7/4, N`y /_ d <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceir g Grid ❑Drywall Nailing ❑Plumbing Final <br /> ectrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQU TED ❑ <br /> ØNABLETOPERFORMSPECTION: <br /> _0 CCE'SALL(425)257-8881 FOR REINSPECTIO —24 hour notice required <br /> (0. 06N?TAI . <br /> Inspector: <br /> Date: 6 k <br /> EIR(10/06) DATABAR,INC. <br />