Laserfiche WebLink
m <br /> SECTION 34 TO�NNSHIP 29 N , RANGE 4 E , �N . M . � Z <br /> , o <br /> � <br /> BASIC SOIL AMENDMENT NOTES a <br /> � <br /> � � Soil retention. Retain, in an undisturbed state, the duff layer and native w <br /> topsoil to the maximum extent practicable. In any areas requiring grading 0 � <br /> '� remove and stockpile the duff layer and topsoil on site in a designated, <br /> � controlled area, not adjacent to public resources and critical areas, to be <br /> ; reapplied to other portions of the site where feasible. <br /> CINDER � Soil quality. All areas subject to clearing and grading that have not been W <br /> BLOCK <br /> wA�� Ex DR�vEwAY � ` covered by impervious surface, incorporated into a drainage facility or f- <br /> ,I � � <br /> engineered as structural fill or slope shall, at project completion, p <br /> � ' � <br /> � � '� �.,�•e. ��� HOUSE �' �'' , � � � � <br /> '�� �� �_ 0r ' ��� � � � i demonstrate �he following: <br /> ' �. , <br /> . , , .w , <br /> .AREA 'A' � ' <br /> �' � � X � a <br /> � �. � ���� ��� . �-��13�980 SF � � � ` w,� 1. A topsoil layer with a minimum organic matter content of 10% dry � <br /> � � <br /> : I� �� �` �� weight in <br /> �� . N 89'00.44„ E 2 i 9.04� , � . <br /> �� k ' ' planting beds, and 5% organic matter content in turf areas, and a pH from '� <br /> ' � ' ` 6.0 to 8.0 or matching the pH of the undisturbed soil. The topsoil layer �Y ��, � <br /> `, ,. �t •.,� ' <br /> , ; °' ' sha h ve a m nimum dep h of eight inches exce where ree roots lim <br /> , <br /> II a i t pt t • �� ' � � <br /> 25� � / , -...,, the depth of incorporation of amendments needed to meet the criteria. � ;� � �°�W: <br /> � PA � „k; v =WO✓ Subsoils below the topsoil layer should be scarified at least 4 inches with .� �: � <br /> � w_ , some incorporation of the upper material to avoid stratified layers, where y ;�,�� e• Q <br /> .. , �_ � � � h.,� � � asi . � <br /> f Y ., fe 'ble �'����. .:.••'F <br /> _ <br /> a.���� �. ': �� � �� � ISP SI ��� � �� , � � � ; ��: -_. e�.� 2. Mulch planting beds with 2 inches of organic material Sp� � <br /> `��z�� `��.. �. `, �. ` ������ �� � �' 3 Use compost and other materials that meet these o g nic content <br /> h� .. � �.� . . requir . <br /> r a ' <br /> m nt • <br /> , .- <br /> ° e e s <br /> `,. ' >; - a. The organic content for `pre-approved"amendment rates can be met <br /> � . � — only using compost meeting the compost specification for BMP T7.30: <br /> � � �� ,��. <br /> : . �, <br /> rn <br /> � � � ells, Swales, and Planter Boxes (p.959), with the exception <br /> , �� _ <br /> �:_ w . � <br /> �. , . . ' PR . � � ._ 35% biosolids or manure. <br /> iore en ion <br /> that the compost may have up to � <br /> ` � � z �` 3 y __ The compost must also have an organic matter content of 40% to 65%, <br /> - - = k and a carbon to nitrogen ratio below 25: 1. � � <br /> B � _ The carbon to nitrogen ratio may be as high as 35: 1 for plantings �� ' <br /> � � � �x � , `:, �� �` . _'`� �, '� �� composed � <br /> - �16' <br /> �. - o. � '' S �_ $ �._--- SS � <br /> S � entirel of lants native to the Puget Sound Lowlands region. rn <br /> , _ , <br /> Y P � <br /> 46' S Z � b. Calculated amendment rates may be met through use of composted � <br /> V J <br /> ; . �; ' , � , material meeting (a.) above; or other organic materials amended to <br /> � _. <br /> __ <br /> �� ; � , ��( <br /> . <br /> ` � � ""� meet the carbon to nitrogen ratio requirements, and not exceeding the `rV <br /> " 25, ' contaminant limits identified in Table 220-B, Testing Parameters, in � <br /> _ <br /> �. � � ;� <br /> WAC 173-350-220. � ^, <br /> 1 <br /> '. . �0�, '� � <br /> , . .�' . � . .. <br /> � <br /> ' z � � , ,.��.,r . , . • . , <br /> , � ' N '•� �'� • ':� �� ' . : *. •• ~.� ' � __ }S � ;�.' The resulting soil should be conducive to the type of vegetation to be <br /> _.. <br /> ; �; �.. . � .• . � .�, �� � : -"" . ,��,,�,. <br /> � <br /> � . . . � ��� � � <br /> . . . <br /> . •a ,�.. . . . established. <br /> ..__ <br /> � 'N s ,�n <br /> ,» <br /> ; . ,_, , <br /> . F W ' . . . -. <br /> �� • � • .. �-� ' •�d e.�t <br /> V <br /> � <br /> AR w . " . ,� .• �� � �� .�. � . ; :� Implementation Options: The soil quality design guidelines listed above can <br /> ,. C <br /> • • � , , , <br /> � � <br /> ( P•) 61. . .. •.�a:�� �� ' , : '�. : � _ be met by using one of the methods listed below: <br /> . . <br /> . �. � � .� a� �.' � ` � ` � 1. Leave undisturbed native vegetation and soil, and protect from � ' <br /> • .. . <br /> � • �• � ��� ' " � � o� compaction during construction. � <br /> ., • �.� . � . � <br /> � W � r ' 2. Amend existing site topsoil or subsoil either at <br /> HE �+T� , W ap--a----- � default '�re-approved°rates, or at custom calculated rates based on tests <br /> �cu ATio Q , - � - � of the soil and amendment. <br /> R AN E - : - � N <� '� ;� 3. Stockpile existing topsoil during grading, and replace it prior to <br /> z � � � planting. Stockpiled topsoil must also be amended if needed to meet the � o � <br /> N 8$s�q'34" E �7�.3C' _... __ � ° <br /> ,_ , - . <br /> _ <br /> DEAR OWS � ' � organic matter or depth requirements, either at a j N � � <br /> �N p,� I W �o default `pre-approved"rate or at a custom calculated rate. Q 00 �"� � <br /> U � . . <br /> �/ � C 1 Z 4. Import topsoil mix of sufficient organic content and depth to meet the � Q � � <br /> ' � ,: re quirements. � � c� c v <br /> � , _ ,_�3�^ J� � . . <br /> _ �n �n <br /> _ = ` ' �-�---'�" _ .. �,, �� ' .�, ,<, �t; More than one method may be used on different ortions of the same site. I- � � <br /> , �- <br /> " . - � �w� w"�'P -- a, ,; ;.. p�pE Soil that already meets the depth and organic matter quality standards, w w �' `~ <br /> � , __ �._ .. <br /> . € " ' . ._. � .w... .,.- ,: . <br /> ' <br /> 1.�� 1.�� <br /> . . _ - � and is not co acte , does not need to be amended. <br /> _... _ � <br /> _ _ �� P <br /> FLOW TO SECOND <br /> ' ; ---�'"� ; � �MIN. MIN.� END CAP OR PLUG DISPERSAL TRENCH ti � ' <br /> m d <br /> - �_r �,: ..... <br /> ' - I ' � . � . CLEAN OUT IF NECESSARY <br /> � ' � � WYE FROM PIPE o W <br /> ^ • � 4" OR 6" PERFORATED N <br /> NOTCHED GRADE + ' 1 , 1 . <br /> . � PIPE LAID FLAT/LEVEL TYPE I CB <br /> BOARD 2"x2' � � � � NPE 1 CB W/SOLID W/SOLID COVER C� <br /> NOTCHES 18" O.C. � + • � � Z <br /> � � � COVER (LOCKING) <br /> � <br /> . . . . � � <br /> A . A �— �— � Z <br /> � W � <br /> 40' : � � W <br /> � INFLUENT PIPE � Z <br /> FLOW TO OTHER � <br /> � (MAX DESIGN 0 � <br /> � � FLOW s0.5 CFS BRANCHING CB'S Z <br /> � � � � . . � PER TRENCH) AS NECESSARY W <br /> TSSP AREA A AREA B , . � . . , <br /> STOCKPILE AND UNCOMPACTED, UNGRADED, � � � � <br /> AMEND SOIL IF UNDISTURBED ^ � . � s <br /> CLEAN OUT <br /> N NECESSARY "OPTION 3�� � - �.� � : . WYE FROM PIPE � „ � <br /> 18 o.c. <br /> —� � 2„ <br /> PLAN � c a <br /> NTS 2" GRADE � � � _ <br /> BOARD 2� rn � Z � <br /> PIPE NOTCHES �-� �i� _ � <br /> � GALVANIZED BOLTS � p.p. � 15� MAX � <br /> ` `��� � ORKS D�,-*.. � O Q <br /> X 1.0 1.0 W <br /> �5%MP �MIN. MIN'1 / / � W <br /> \�\\�\ �Y � c� <br /> /�/�/� � � � " : /�/� " � d' <br /> . » ��\���\���\���\�� � � � � ���\�� NOTES: DAT � � L Z <br /> 2 x12 PRESSURE / /\/\/\/\/\ . �.• • � . . � �.� , /\/ . ..._W� � O w <br /> . .,,, � :> ..� .. <br /> 0 20 40 TREATED BOARD �/�\//\��/���/��/��/ : � � . .. . � /\` �• THIS TRENCH SHALL BE CONSTRUCTED ; Q <br /> � ��������� � o � � SO AS TO PREVENT POINT DISCHARGE T r '� � U z * <br /> HORIZONTAL SCALE Z Q �%�//\��\��\�/j���//\ : � ' : �//\ AND/OR EROSION. t W <br /> � <br /> � � �'\��/\��/\/\ ' �� ` • � ' . •� ` ��/�� 2. TRENCHES MAY BE PLACED NO C � _ <br /> VAR I ES N i� \�//�\�//�\�//�\�//� _ � . • o �. � . �/% „ C L O S E R T H A N 5 0 F E E T T O O N E � (1) Q H <br /> ASPHALT � M �\\���\\��/�\\��/� � .� � .� � � � .' .� � PERFORATED ANOTHER. (100 FEET ALONG � � Z O <br /> OR CONCRETE ONLYABEI INSTAL�LED ONATHE ��\///� . ' � � �. � " . PIPE LAID FLAT FLOWLINE) W L � Z <br /> DRIVEWAY DOWNSLOPE SIDE OF NEW ��//� �.� � + �.� � . . � + � 3. TRENCH AND GRADE BOARD MUST BE r , � � N <br /> CO ~2, CONCRETE OR ASPHALT � � o � . . ' CLEAN (S5% FINES) LEVEL. ALIGN TO FOLLOW CONTOURS v � p <br /> LANDSCAPING DRIVEWAY AREAS. ' � ' . � � ' 1�"-�" WASHED ROCK OF SITE. O W d <br /> � � 4"x4� SUPPORT ^ � <br /> � POST �. � r �.: ,� �. . 4. SUPPORT POST SPACING AS REQUIRED <br /> DRAIN ROCK OR � = z �� . • � �� /��\\��\ BY SOIL CONDITIONS TO ENSURE <br /> SUBGRADE MATERIAL 'co �D� � � � • � : j %���j//�� GRADE BOARD REMAINS LEVEL. <br /> AMENDED SOIL �������\����� <br /> REFER TO SHEET 4 NOTE: FILTER FABRIC PROJ.NO. DSN.BY: <br /> FOR SPEC. CONTRACTOR TO ENSURE BOTTOM OF TRENCH 17-0802 CAB ' <br /> IS MINIMUM OF ONE FOOT INTO FINE SANDS. SECTION A-A <br /> TRANSITION ZONE DETAIL NTs <br /> NOT TO SCALE DATE: <br /> 8/24/17 <br /> (AS NEEDED SEE NOTE ABOVE) FIGURE 3.7 NPGIS DISPERSION TRENCH SCALE: �„ = 20� <br /> NOT TO SCALE <br /> CALL 48 HOURS DR4WING NO. <br /> BEFORE YOU DIG 2 2 <br /> 1-800-424-5555 <br /> OF <br />