Laserfiche WebLink
CAU -�ION : F -I-HIS SHEET S �IOT 30�� x4�"� IT IS A REDUCED PRIN -� - <br /> DEMOLITI4N NOTES FINISH NOTES CEILING N TE Y <br /> O S FLOOR PLAN NOTES FIRE AUTHORITY N4TES PRE-C4NST. MEETING � r-A � <br /> � .,..� <br /> z � N <br /> Q w <br /> 1. FINAL INSPECTION BY FIRE DEPARTMENT IS REQUIRED - SCHEDULE 72 HOURS IN o � <br /> 1. DRAWINGS OF EXISTING CONDITIONS HAVE BEEN COMPILED FROM EXISTING DATA 1. NO FINISH SUBSTITUTIONS MAY BE MADE UNL,ESS APPROVED BY ARCHITECT. 1. SEE ELECTRICAL ENGINEERING DRAWINGS FOR SPECIFICATIONS OF NEW BUILDING 1. CONTRACTOR AND ARCHITECT TO REVIEW & APPROVE CHALK LINES OF PARTITION ADVANCE. 1. PRIOR TO START OF CONSTRUCTION, A PRE-CONSTRUCTION MEETING IS TO BE � <br /> SUPPLIED BY THE OWNER TO THE ARCHITECT. THE ARCHITECT MAKES NO STANDARD LIGHT FIXTURES, SWITCHES, EXIT SIGNS, ETC. LAYOUT PRIOR TO COMMENCEMENT OF PARTITION CONSTRUCTION. HELD INCLUDING A RESPONSIBLE REPRESENTATIVE OF THE ARCHITECT, THE OWNER z O � <br /> WARRANTY, EITHER EXPRESS OR IMPLIED, FOR THE ACCURACY OF THE 2. CONTRACTOR MUST NOTIFY THE ARCHITECT OF ANY DISCREPANCY IN PLANS. AND THE GENERAL CONTRACTOR. THE DISCUSSION WILL BE IN REGARDS TO THE g c� <br /> COMPLETENESS OF THE EXISTING INFORMATION RECORDED. THE CONTRACTOR FINISH ITEMS CLEARLY SHOWN IN PLANS, BUT OMITTED FROM SCHEDULES OR 2. ALL REPLACEMENT FLUORESCENT LAMPS TO MATCH BUILDING STANDARD - SAME 2. CONTRACTOR TO VERIFY DIMENSIONS FOR ALL PLUMBING PARTITION. 2• THE PROJECT ADDRESS SHALL BE PROVIDED FOR ALL NEW AND EXISTING ,,,� _ <br /> BUILDINGS IN A POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE ARCHITECT-OWNER-CONTRACTOR (AOC) CORRESPONDENCE PROCESSES AND z � �y <br /> SHALL FIELD VERIFY A�L EXISTING CONDITIONS AND NOTIFY THE ARCHITECT LEGENDS MUST STILL BE PROVIDED AND INSTALLED BY CONTRACTOR. COLOR AND MANUFACTURER. STREET OR ROAD FRONIING THE PROPERTY PER LOCAL FIRE DEPARTMENT PROCEDURES. AT A MINIMUM, THE FOLLOWING IS TO BE DISCUSSED: � � <br /> IMMEDIATELY OF ANY DISCREPANCIES OR CONFLICTS THAT MIGHT ARISE IN THE CONTRACTOR TO VERIFY OMITTED FINISHED WITH ARCHITECT PRIOR TO ORDERING 3. EXTEND ALL STUDS AND WALL MATERIALS TO CONSTRUCTION ABOVE, U.O.N. STANDARDS. � � � � <br /> COURSE OF THE DEMOLITION WORK. PRODUCTS. 3. FIELD VERIFY EXISTING CEILING GRED LOCATION AND NOTIFY ARCHITECT OF ANY o <br /> 2. AOC REGULARLY SCHEDULED MEETINGS � � <br /> DlSCREPANCIES ON PLANS. 4. ALL CONDUIT PIPING IN ELECTRICAL ROOM T0 BE CONCEALED WITHIN THE WALL 3. AN UNOBSTRUCTED ALL-WEATHER FIRE APPARATUS ACCESS ROAD SHALL BE IN 2•1. WHEN 11J o <br /> 2. VER►FY LOCATIONS OF EXISTING MECHANICAL, PLUMBING AND ELECTRICAL 3. INSTALL MATERIALS ACCORDING TO MANUFACTURER'S SUGGESTED INSTALLATION CONSTRUCTION. = U <br /> PLACE PRIOR TO DELIVERY OF COMBUSTIBLE BUILDING MATERIALS TO THE SITE. 2•2• WHERE � � <br /> UTILITIES. LOCATE AND PROTECT UTILITIES TO REMAIN. DISCONNECT, REMOVE AND PREPARATION MAINTENANCE SPECIFICATIONS OR BETTER, UNLESS OTHERWISE 4. WHERE DISCREPANCiES IN LOCATION OF LIGHT FIXTURES, AIR DIFFUSERS, GRILLES, o 0 <br /> BACK TO NEAREST JUNCTION BOX OR PANEL, AS REQUIRED, AND CAP � 2.3. HOW OFTEN <br /> APPROVED OR NOTED. ETC. OCCUR ON THE ELECTRICAL ENGWEERING P�ANS, THE ARCHITECTURAL 5. DOOR OPENINGS IN PARTITIONS NOT DIMENSIONED ARE TO BE LOCATED WITHIN E- � <br /> , „ 4. FIRE PREVENTION WATER SERVICE SHALL BE IN SERVICE PRIOR TO DELIVERY OF 2.4. IN PERSON VERSUS GONFERENCE CALLS <br /> DESIGNATED UTILITIES WITHIN THE DEMOLITION AREA. REFER TO THE PLANS SHALL GOVERN. NOTIFY ARCHITECT OF ANY DISCREPANCIES FOR 0 -4 OF ADJACENT PERPENDICULAR PARTITION. COMBUSTIBLE BUILDING MATERIALS TO THE SITE. 2.5. APPROXIMATE ALOTTED TIME PER MEETING o � <br /> MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONAL INFO. 4. APPLICATION OF CONTROLLED INTERIOR FINISHES SHALL BE IN CONFORMANCE CLARIFICATIONS. � <br /> WITH STATE & LOCAL CODES. 6. CONTRACTOR SHALL USE 3-5/8" METAL STUDS MINIMUM AT ALL PLUMBING 5. ACCESS GATES SHALL BE APPROVED PRIOR TO INSTALLATION AND SHALL BE IN 3. CONSTRUCTION MEETING MINUTES °- � .� <br /> 3. EXISTING ELECTRICAL AND TELEPHONE OUTLETS LOCATED ON DEMOLISHED WALLS 5. FIELD VERIFY A�L CLEARANCES OF DUCTS, PIPES, SPRINKLERS, ETC., AND NOTIFY m <br /> WALLS. CONTRACTOR TO VERIFY ACTUAL DEPTH REQUIRED, ANY DISCREPANCIES COMPLIANCE WITH LOCAL FIRE AUTHORITY. 3.1. FORMAT FOR THE MINUTES 0 <br /> ARE TO BE REMOVED INCLUDING CONDUIT AND WIRING BACK TO JUNCTION BOX. 5. DECORATIVE MATERIALS SHALL BE MAINTAINED IN A FLAME-RETARDANT ARCHITECT OF ANY CONFLICTS PRIOR T0 INSTALLATION OF LIGHTS, ETC. SHALL BE REPORTED T0 THE ARCHITECT. 3.2. CONTRACTOR TO AUTHOR THE MINUTES o � <br /> LOCATIONS ARE TO BE PATCHED AND REPAIRED TO BE FLUSH WITH ADJACENT CONDITfON. 6. FIRE SPRINKLER SYSTEM(S) SHALL MEET STATE & LOCAL FIRE CODES AND BE � � � <br /> WALL SURFACE. 6. PLACEMENT OF LIGHT FIXTURES IN AREAS WHERE MAIN DUCTS MAY CAUSE > >� 4. FORMAL CHANGES IN THE WORK � � <br /> INTERFERENCE MUST BE APPROVED BY ARCHITECT PRIOR TO INSTALLATION. �• USE WATER RESISTANT GYPSUM BOARD/FIBER BOARD AT ALL AREAS SUBJECT TO PROVIDED TO PROTECT ENTIRE BUILDING INCLUDING PROJECTIONS OVER 4-0 cLS <br /> 4. WHERE PLUMBING FIXTURES ARE BEING REMOVED OR WHERE EXPOSED PLUMBING 6. SUBMIT THE FOLLOWING SAMPLES FOR ARCHITECT'S APPROVAL• MOISTURE OR WHERE TILE IS USED. 4.1. ADDENDA ANO BULLETINS ISSUED BY THE ARCHITECT w J <br /> A. THREE (3) 12" X 12" SAMPLES FOR ALL PAINT AND STAIN BRUSHOUTS, „ AND SPRAY BOOTH. 4.2. CHANGE ORDER REQUESTS ISSUED BY THE CONTRACTOR Q <br /> PIPES OCCUR, CAP LINES BEHIND FINISHED SURFACES. PATCH AND REPAIR AS VINYL AND FABRIC FINISHES AND COLORS APPLIED TO A SUBSTRATE WHICH �• CONDUITS ABOVE CEILING MUST BE A MINIMUM OF 12 ABOVE THE CEILING GRID. 8. ALL PLUMBING WORK SHALL BE IN ACCORDANCE WITH LOCAL AND NATiONAL 4.3. CHANGE ORDERS ISSUED BY THE CONTRACTOR � <br /> REQU►RED. 7. FIRE SPRINKLER SYSTEM(S) AND ALL CONTROL VALVES, INCLUDING EXTERIOR ,1 <br /> IS REPRESENTATIVE OF THE SURFACE TO BE FINISHED. SUBMIT PAINT CODES. SHALL BE SUPERVISED BY A U.L. LISTED CENTRAL ALARM STATION OR PER 4.4. TRACKING MECHANISMS o <br /> 5. ALL EXISTING CONSTRUCTION WHERE INDICATED INCLUDING ELECTRICAL, SAMPLES FROM THE PAINT LOT OR LOTS INTENDED FOR APPLICAl10N. 8• NO COMBUSTIBLE MATERIALS SHALL BE USED IN THE PLENUM SPACE, INCLUDING W <br /> ALUMINUM FLEX, ALUMINUM CONDUIT, AND POT METAL CONNECTORS. STATE & LOCAL FIRE CODES. � <br /> TELEPHONE, PLUMBING AND MECHANICAL DEVICES NOT OTHERWISE INDICATED ON 9. ALL HOT WATER LINES SHALL BE PROPERLY INSULATED. SEE PLUMBING 5. REQUESTS FOR INFORMATION PROCESS <br /> B. ONE (1) 24" X 24" MOCK-UP WITH SAMPLE SEAM (CENTERED) OF ALL DRAWINGS. 5.1. TRACKING MECHANISM o <br /> THESE CONSTRUCTION DRAWINGS SHALL BE REMOVED IN A CAREFUL MANNER SO 9. ALL JUNCTION BOXES AND MECHANICAL EQUIPMENT REQUIRING ACCESS FOR 8. ALL VALVES CONTROLLING THE WATER SUPPLY FOR AUTOMATIC SPRINKLER z o <br /> FABRIC AND VINYL FINISHES AND COLOR. 5.2. DEFINE Cc: RECIPIENT LIST <br /> AS NOT TO DAMAGE ADJOINING CONSTRUCTION. SERVICE SHALL BE LOCATED OUER ACOUSTICAL CEILINGS. NO ACCESS HATCHES SYSTEMS AND WATER-FLOW SWITCHES ON ALL SPRINKLER SYSTEMS SHALL BE w <br /> 10. ALL PLUMBING CLEAN-OUTS SHALL BE INSTA�LED WHERE READILY ACCESSIB�E. 5.3. STANDARD RESPONSE TIMES (2-5 WORKING DAYS IS STANDARD) _ ,.°�' �' <br /> •� . SHALL BE INSTALLED IN GYPSUM BOARD CEILINGS WITHOUT PRIOR APPROVAL BY ELECTRICALLY MONITORED WHERE THE NUMBER OF SPRINKLERS IS (100) OR � � o <br /> 6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE ALL EXISTING C. THREE (3) 12 X 12' SAMPLES OF ALL FLOOR COVERING. CONTRACTOR SHALL COORDINATE ALL CLEAN-OUT LOCATIONS WITH EQUIPMENT, � <br /> UTILITIES WHETHER SHOWN HEREON OR NOT AND TO PROTECT THEM FROM ARCHITECT. (NO EXCEPTION) AND CABINETS. SUBMIT A PLAN OF ALL PROPOSED LOCATIONS TO ARCHITECT MORE. 6. SUBMITTAL PROCESS � � �` <br /> DAMAGE. THE CONTRACTOR SHALL BEAR ALL EXPENSE OF REPAIR OR D. SUBMIT ACTUAL CUTTINGS OF EACH PRODUCT FOR COLOR QUALITY CONTROL FOR APPROVAL PRIOR TO INSTAL�ATION. fi.1. TRACKING MECHANISM � Z o <br /> � 10. ALL SPRINKLER HEADS AT HARD-LID CEILINGS ARE TO BE FULLY RECESSED AND 9. ELECTRICAL SUBCONTRACTORS TO INSTALL WIRING FOR FIRE SPRINKLER, ALARM = � <br /> REPLACEMENT OF UTILITIES OR OTHER PROPERTY DAMAGED BY OPERATIONS IN 6.2. ISSUANCE SCHEDULE BY THE CONTRACTOR c� v tw <br /> C O N C E A L E D. H EA DS ARE TO BE CENTERED BETWEEN LIGHTS IN A UNIFORM B E L L A N D T E�E P H O N E W A R N I N G A S R E Q U I R E D B Y F I R E D E P A R T M E N T. � on � � <br /> CONJUNCTION WITH THE EXECUTION OF HIS WORK. 7. WHERE MATERIALS ARE NOT RETURNABLE, SUBMIT SAMPLES TO ARCHITECT 11. ALL MILLWORK SHALL CONFORM TO STATE & LOCAL WOODWORKING STANDARDS. 6.3. DEFINE Cc RECIPIENT LIST o � <br /> BEFORE PLACING FULL ORDERS. ARCHITECTURAL PATTERN. G.C. TO PROVIDE A SUBMITTAL WITH SPRINKLER HEAD 6.4. STAMPED REVIEWED AND APPROVED BY CONTRACTOR PRIOR TO SUBMISSION � �� � � o � <br /> 10. INSTALLATION OF FIRE ALARM SYSTEMS SNALL BE IN ACCORDANCE WITH STATE & 00 a� °1 �s � � �' <br /> 7. A�L EXISTING BUILDING UTILITIES SHALL REMAIN IN OPERATION DURING LOCAT(ONS FOR ARCHITECT'S APPROVAL PRIOR TO INSTALLATION. 12. FIELD MEASURE AS REQUIRED FOR ALL MILLWORK CONDITIONS PRIOR TO 6.5. NON-REQUESTED SUBMITTALS MAY NOT BE REVIEWED � °1 � N <br /> FABRICATION. L O C A L F I R E C O D E S. w •� � � o 00 <br /> CONSTRUCTION. PROVIDE REROUTING OF UTILITiES SERVING ADJACENT AREAS 8. SUBMIT SEAMING PLAN FOR ALL FLOOR FINISHES TO ARCHITECT FOR APPROVAL 6.6. STANDARD RESPONSE TIMES (7-10 WORKING DAYS IS STANDARD) °J° � •� o � � � � � � <br /> PRIOR TO ORDER. 11. AL� GYPSUM BOARD CEILINGS ARE TO BE INSTALLED WITH LINEAR DIFFUSERS. <br /> THAT ARE TO MAINTAIN UNINTERRUPTED SERVICE. ANY TEMPORARY SUSPENSION 11. COMPLETE PLANS AND SPECIFICATIONS FOR ALL FIXED FIRE PROTECTION � � � <br /> G.C. TO PROVIDE A SUBMITTAL WITH ALL LINEAR DIFFUSER LOCATIONS PRIOR TO 13. CONTRACTOR TO PROVIDE SHOP DRAWINGS FOR ARCHITECT AND TENANT 7. SUBSTITUTIONS Q �" �, ¢" •� `f' � N `f' <br /> QF SERVICE SHALL BE COORDINATED AND APPROVED BY THE FACILITY MANAGER, INSTALLATION. APPROVAL PRIOR TO MANUFACTURE OF ANY CABINET WORK, MILLWORK AND ANY EQUIPMENT INCLUDING AUTOMATIC SPRINKLERS AND OTHER FIRE-PROTECTION 7,1. REQUEST FORMS WITH REASONS AND BENEFIT FOR SUBSTITUTION N � � � � •� o � � w <br /> NOT LESS THAN 24-HOURS IN ADVANCE. 9. NOTIFY ARCHITECT IMMEDIATELY OF ITEMS WITH LONG LEAD TIMES. SYSTEMS SHALL BE SUBMITTED BY INSTALLING CONTRACTOR. SUCH PLANS <br /> OTHER SPECIAL ITEMS REQUIRING CUSTOM SHOP FABRICATED WORK. SHALL BE APPROVED BY LOCAL FIRE AUTHORITY PRIOR TO WSTALLATION. � <br /> 8. THE CONTRACTOR 1MLL VERIFY AND CONFORM TO ALL REQUIREMENTS OF ALL 10. ALL PAINT FINISH OF METAL PARTS OF DOORS, HANDRAILS, PERIMETER <br /> 12. LOCATE RECESSED DOWN LIGHTS, WALL WASHERS, SMOKE DETECTORS, EXIT SIGNS, 8. PAYMENT APPLICATIONS z <br /> SPEAKERS FIRE SPRINKLERS, ETC. IN CENTER OF 24"x24" CEILING TILES OR IN 14. CONTRACTOR TO VERIFY FINAL LOCATION FOR CANTILEVERED'COUNTERS AND 12 LOCATIONS AND CLASSIFICATIONS OF FIRE EXTINGUISHERS SHALL BE IN w <br /> UTILITY COMPANIES UNLESS OTHERWISE NOTED IN THE PLANS AND ENCLOSURES, ETC., SHAL� BE SEMI-GLOSS, U.O.N. � 8.1. PROCESS � <br /> SPECIFICATIONS. CENTER OF 24"x24" PORTION OF 24"x48" CEILING TILES, UNLESS OTHERWISE IN WALL SUPPORT BRACKETS PRIOR TO GYPSUM BOARD FINISHING OF WALLS. 8.2. SUBMITTAL DATE � <br /> 11. WHERE PAINT COLORS CHANGE, CORNERS ARE TO BE CUT-IN FREE OF ALL FINAL INSTALLATION HEIGHTS FOR IN-WALL SUPPORT BRACKETS MUST MEET ACCORDANCE WITH STATE & LOCAL FIRE CODES AND PLACEMENT IS SUBJECT TO c� <br /> NOTED. THE APPROVAL OF THE FIRE INSPECTOR. VERIFY QUANTITY & EXACT LOCATION 8•3. ANTICIPATED TURN-AROUND cn <br /> 9. THE DEMOLITION PLAN KEYNOTES ARE DIAGRAMMATIC AND GENERAL IN NATURE. OVERLAPPWG. ALL ACCESSIBILITY CODES REQUIREMENTS WITH COUNTERTOP MATERIAL THICKNESS FROM FIRE DEPARTMENT PRIOR TO ORDERING. � <br /> INCLUDED. 9. PUNCH LISTS � <br /> THE INTENT IS TO ILLUSTRATE THE COMPLETE DEMOLITION OF THE SPACES 13. PROVIDE SWITCHES AND LIGHT SENSORS FOR OPEN AREAS AND PRIVATE OFFICES. z <br /> INDICATED UNLESS NOTED OTHERWfSE. FIELD VERIFICATION OF EXISTING 12. PRIOR TO THE INSTALLATION OF WALL COVERINGS, SURFACES SHALL BE ACTUAL LOCATION OF ALL SWITCHES TO BE DETERMINED BY E�ECTRICAL 9.1. ONLY ONE PUNCH WALK TO BE PROVIDED BY DESIGN TEAM ¢Z <br /> 13. AT LEAST ONE (1) FIRE EXTINGUISHER WITH A MINIMUM RATING OF: ¢ o� � <br /> CONDITIONS AND SPECIFIC QUANTITIES IS THE RESPONSIBILITY OF THE PROPERLY PREPARED WITH SEALER PER MANUFACTURER'S RECOMMENDATIONS. ENGINEER. 15. PROVIDE AND INSTALL ALL NECESSARY WALL BACKING, STIFFENERS, BRACING, 9.2. CONTRACTOR TO PUNCH AND MAKE CORRECTIONS PRIOR T0 DESIGN TEAM �i W U�w° <br /> 2-A-10B:C (FOR OFFICE), OR 10-A-80B:C (FOR WAREHOUSE) SHALL BE F- �W �c� <br /> CONTRACTOR. BACK-UP PLATES AND/ OR SUPPORTING BRACKETS AS REQUIRED FOR THE , „ � PUNCH. �, ��}��� <br /> 13. CONIRACTOR TO VERIFY CONDITION AND LEVEL OF FLOOR SO AS TO RECEIVE 14. WHERE EXIT SIGNS ARE REQUIRED PER STATE & LOCAL CODES, THEY SHALL BE INSTALLATION OF WALL-MOUNTED OR SUSPENDED EQUIPMENT OR BUILT-IN ITEMS. PROVIDED WITHIN 75 -0 MAXIMUM TRAVEL DISTANCE FOR EACH 3,000 SQUARE 9,3. A FINAL WALK WILL OCCUR ONLY IF THE ARCHITECT IS CONTRACTED TO DO o, �� '�Q � ' <br /> 10. REMOVAL AND DISPOSAL OF DEMOLITION DEBRIS IS THE RESPONSIBILITY OF THE NEW FINISHES WITHOUT BOWING AT FLOOR OR WALL BASE. CONTRACTOR IS FEET OR PORTION THEREOF ON EACH FLOOR. o �Q�-�o 0 <br /> ILLUMINATED PER SAID CODES AND THE NEC. LOCATIONS SHALL BE VERIFY REQUIREMENTS WITH MANUFACTURERS PRIOR TO INSTALLATION. SUPPLY S0. <br /> CONTRACTOR. VERIFY THE HAULING ROUTE THROUGH THE BUILDING, THE RESPONSIBLE FOR ALL FLOOR PREPARATION. COORDINATED WITH THE ARCHlTECT. CATALOG CUT SHEETS FOR ARCHITECT'S APPROVAL. �`, Z� W <br /> 14. STORAGE, DISPENSING OR USE OF ANY FLAMMABLE AND COMBUSTIBLE LIQUIDS, _ � �Q <br /> DEMOLITION STAGING AREA, AND THE LOCATION OF THE DUMPSTERS WITH THE FLAMMABLE AND COMPRESSED GASES, AND OTHER HAZARDOUS MATERIALS SHALL ~ Z � o� <br /> OWNER PRIOR TO THE START OF DEMOLITION. DISPOSAL OF RUBBISH SHALL BE 14. ALL CARPETING SHALL BE INSTALLED WITH GLUE DOWN METHOD, U.O.N. 15. PROVIDE BACK-UP POWER FOR EXIT SIGNS PER STATE & LOCAL CODES. 16. PROVIDE AND INSTALL ALL NECESSARY ELECTRICAL CONNECTIONS AND PLUMBING � G <br /> SUPPLY, FITTINGS & CONNECTORS TO COMPLETE INSTALLATION OF APPLIANCES & COMPLY WITH STATE & LOCAL FIRE CODES. THE STORAGE AND USE OF o � <br /> DONE IN A LEGAL MANNER. 16. THE MEANS OF EGRESS, INCLUDING THE EXIT DISCHARGE, SHALL BE ILLUMINATED EQUIPMENT INDICATED ON PLAN. VERIFY REQUIREMENTS WITH MANUFACTURERS HAZARDOUS MATERIALS SHALL BE APPROVED BY THE FIRE AUTHORITY PRIOR TO F- <br /> 15. WHERE FLOOR-MOUNTED OUTLETS ARE REQUIRED ON CARPETED AREA, CUT � � <br /> TO A LEVEL OF NOT LESS THAN ONE FOOT CANDLE AT THE WALKING SURFACE PRIOR TO INSTALLATION. SUPPLY CATALOG CUT SHEETS FOR ARCHITECT'S ANY MATERIALS BEING STORED OR USED ON SITE. A SEPARATE PLAN SUBMITTAL � � <br /> 11. THE OWNER RESERVES THE RIGHT TO SALVAGE ANY DEMOLISHED ITEM. VERIFY CARPET IN AN "X" OVER FLOOR HOLE AND INSTALL CARPET OVER TOP. DO NOT AT A�L TIMES THE BUILDING SPACE SERVED BY THE MEANS OF EGRESS IS APPROVAL. IS REQUIRED PRIOR TO THE STORAGE AND USE OF HAZARDOUS MATERIALS. W <br /> ITEMS TO BE SALVAGED WITH THE OWNER PRIOR TO THE START OF DEMOLITION. TRIM CARPET. OCCUPIED. > <br /> REMOVE, PROTECT, CLEAN, REPAIR FOR REUSE AND TURN OVER SUCH ITEMS AS 15. BUILDING S NOT APPROVED FOR HIGH-PILED STOCK <br /> DIRECTED BY THE OWNER. 16. ALL V.C.T. TO BE INSTALLED WITH FULL TILE FROM VINYL THRESHOLD STRIP AND 17. EXACT LOCATION OF FIRE EXTlNGUISHER CABINETS TO BE CONFIRMED WITH � ) (MATERIALS IN CLOSELY w� <br /> FULL TILE FROM WALL ADJACENT TO DOOR SWING, U.O.N. 17. EMERGENCY LIGHTING SHALL BE (2) SEPARATE SOURCES OF POWER AND SHALL ARCHITECT BEFORE INSTALLATION. PROVIDE ADDITIONAL FIRE EXTINGUISHERS & PACKED PILES OR ON PALLETS, OR IN RACKS WHERE THE TOP OF STORAGE G C I N ST R U CT I O N S <br /> 1 2. I N O R D E R T O I N S T A L L S O M E O F T H E N E W W O R K (I N C L U D I N G, B U T N O T L I M I T E D C O M P L Y W I T H T H E N E C. C A B I N E T S A S R E Q U I R E D B Y T H E F I R E D E P A R T M E N T F I E L D I N S P E C T O R S. E X C E E D S 1 2'-0" I N H E I G H T, A N D 6'-0" F O R G R O U P "A" P L A S T I C S A N D C E R T A I N � � ¢ <br /> 17. PROVIDE AND INSTALL SPECIFIED BASE FOR ALL AREAS TO RECEIVE FLOORING. OTHER HIGH-HAZARD COMMODITIES). HIGH-PILED STOCK SHALL BE APPROVED O <br /> TO MECHANICAL, PLUMBING OR ELECTRICAL) IT WILL BE NECESSARY FOR THE v=i <br /> CONTRACTOR AND HIS SUBCONTRACTORS TO REMOVE AND REPLACE (OR 18. PROVIDE FIRE DAMPERS AT ALL SUPPLY AND RETURN AIR OUTLETS, INLETS OR 18. CONTRACTOR TO VERIFY LOCATION OF ALL THERMOSTATS WITH ARCHITECT PRIOR BY THE FIRE AUTHORITY PRIOR TO MATERIALS BEING STORED ON SITE. A SUBMITTALS � <br /> 18. CONTRACTOR SHALL PROVIDE PRE-FORMED RUBBER BASE CORNERS. DO NOT DUCTS PENETRATING F1RE RATED ASSEMBLIES, ENCLOSURES, WALLS, FLOORS OR TO INSTALLATION. SEPARATE PLAN SUBMITTAL IS REQUIRED FOR HIGH PILED STORAGE IN z N <br /> REFINISH) EXISTING WALLS, FLOORS, OR CEILING IN THE AREAS OF THE BUILDING CUT OR BEND STRAIGHT BASE TO MAKE CORNERS. SURFACES, AND AS REQUIRED BY THE FIRE DEPARTMENT. ACCORDANCE WITH STATE & LOCAL FIRE CODES. 1. AT THE START OF JOB PROVIDE A SCHEDULE OF ALL ANTICIPATED SUBMITTALS � r <br /> NOT SHOWN ON THESE PLANS. THE CONTRACTOR SHALL INCLUDE ALL RELATED 19. ALL EXITS SHALI. HAVE EXIT SIGNS AND ALL BLIND CORRIDOR TURNS SHALL AND DATES. FLAG SUBMITTALS WHICH ARE OR COULD BE CRITICAL PATH. FLAG <br /> z <br /> COSTS IN HIS BASE BID, WHETHER SHOWN ON THESE PLANS OR NOT. 19. CONTRACTOR SHALL PROVIDE EMERGENCY LIGHTING, STROBE LIGHTS, HAVE DIRECTIONAL EXIT SIGNS. 16. A LETTER OF INTENDED USE MAY BE REQUIRED BY THE FIRE INSPECTOR. SUBMITTALS THAT WILL BE REQUESTED TO BE EXPEDITED FASTER THAN THE � W <br /> 19. MILLWORK LOWER CABINETS ARE NOT TO RECEIVE WALL BASE UNLESS INDICATED AUDIO-VISUAL ALARMS AND OCCUPANCY SENSORS TO MEET ALL APPLICABLE z <br /> 13. PROTECT ADJACENT SPACES NOT SCHEDULED FOR DEMOLITION. PATCH AND ON FINISH PLANS. STANDARD 7-10 DAYS. ,�, � <br /> REPAIR DAMAGED FINISHES, ITEMS AND FIXTURES TO REMAIN AND/OR REPLACE CODES. 20. PREPARE ALL FLOOR SURFACES AS REQUIRED TO RECEIVE FINISHES AS NOTED 17. ALL REQUIRED FIRE DOORS SHALL BEAR A LABEL FROM A RECOGNIZED AGENCY � <br /> ON FINISH PLAN, ENLARGED FINISH PLANS & FINISH LEGEND. SHOWING THE SPECIFIC RATING. 2. A SUBMITTAL LOG IS TO BE MAINTAINED BY THE GENERAL CONTRACTOR AND A � � <br /> IN KIND TO MATCH EXISTING FROM DAMAGE DURING THE PROGRESS OF THE 20. FLOOR FINISHES TO CONTINUE UNDERNEATH "OPEN FLOOR" AREAS OF MILLWORK, 20. CONTRACTOR SHALL PROVIDE LAMPS WITH TYPE IC RATED HOUSING WHERE CURRENT COPY IS TO BE INCLUDED WITH EACH SUBMISSION. �w <br /> WORK. PROVIDE TEMPORARY SAFETY BARRIERS REQUIRED BY CODE AND AS INCLUDING SINK AREA AND AT ALL UNDER-COUNTER EQUIPMENT AREAS WHICH FIXTURES COME IN DIRECT CONTACT WITH INSULATION. 21. UNLESS OTHERWISE NOTED, ALL GYPSUM BOARD SURFACES, WALLS, AND CEILINGS 18. EXIT SIGNS AND ILLUMINATION SHALL CONFORM TO ALL APPLICABLE BUILDING J � <br /> INDICATED TO INSURE PUBLIC SAFETY AND TO ALLOW BUILD►NG OCCUPANCY. ARE OPEN TO THE FLOOR. SHAL� BE TAPED, SANDED SMOOTH TO A "LEVEL 4" FINISH, SO AS TO RECEIVE AND FIRE CODES. � <br /> CONTRACTOR T0 SUBMIT FOR APPROVAL, BARRIER LOCATIONS, AND METHOD OF 21. FLOORS SHALL BE SLOPED TO FLOOR DRAINS. COORDINATE WITH PLUMBING AND 21• EXIT SIGNS SHALL BE INTERNALLY OR EXTERNALLY ILLUMINATED AT ALL TIMES PAINT OR WALL COVERING MATERIAL. 3. ALL SUBM�TTALS MUST BE REVIEWED AND APPROVED WITH A STAMP AND � � � <br /> CONSTRUCTION TO THE ARCHITECT PRIOR TO INSTALLATION. AND SHALL BE CONNECTED TO AN EMERGENCY POWER SYSTEM BATTERIES, UNIT 19. EXIT DOORS SHALL BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF A KEY SIGNATURE BY THE GENERAL CONTRACT OR PR IOR TO SUBMISSION. THE REVIEW > � � <br /> STRUCTURA L D R A W INGS. IN RATED FLOOR CONDITIONS, CONFIRM REMAINING FLOOR � <br /> 14. NO STRUCTURAL E�EMENTS ARE INCLUDED IN THIS SCOPE OF WORK. THICKNESS STILL CONFORMS TO MINIMUM RATING REQUIREMENT. EQUIPMENT DR AN ON-SITE GENERATOR) THAT WILL AUTOMATICALLY ILLUMINATE 22 PROVIDE SOUND INSULATION AT PERIMETER WALLS OF RESTROOMS, LOBBY, OR ANY SPECIAL KNOWLEDGE OR EFFORT. WI�L INCLUDE BUT NOT BE LIMITED T0: � Q N <br /> THE EXIT SIGNS FOR A DURATION OF NOT LESS THAN 90 MINUETS. STAIRS, AND ACROSS CEILING OF RESTROOMS TO CREATE AN ACOUSTIC 3.1. CONFIRMING THAT THE SUBMITTAL MEETS THE REQUIREMENTS OF THE � 1� � � <br /> ENVELOPE, U.O.N. 20. PROVIDE OR MODIFY AS NEEDED SPRINKLER ALARM AND SMOKE DETECTION CONTRACT DOCUMENTS. W � � <br /> 15. PROVIDE DUST BARRIERS AROUND OPENINGS, TO AND FROM THE CONSTRUCTION 22• CONTRACTOR TO RUN CALCIUM CHLORIDE TEST ON ALL EXISTING OR NEW SYSTEM PER APPLICABLE CODES INCLUDING IF NECESSARY FIR HORNS, STROBE 3.2. COORDINATION HAS TAKEN PLACE WITH ALL WTERCONNECTING TRADES � <br /> CONCRETE SLABS PRIOR TO INSTALLING ANY FLOORING AND COMPARE RESULTS ,�, Z <br /> AREA. PROVIDE ALL MEANS NECESSARY TO INHIBIT DUST FROM ENTERING 23. PATCH AND FILL VARIOUS OPENINGS AT EXISTING G1PSUM BOARD PARTITIONS LIGHTS, CONTROL PANEL CONNECTIONS, SMOKE DETECTORS, AUDIO VISUAL 3.3. THE SUBMITTAL IS COMPLETE AND COMPREHENSIVE � � <br /> OTHER PORTIONS OF THE FACILITY. SUBMIT BARRIER LOCATIONS TO THE WITH FLOORING MANUFACTURE'S RECOMMENDED MAXIMUM CONTENT FOR �, <br /> WARRANTIES AND ADHESIVE PRODUCTS. M I L LWO R K N T E AND SOFFITS FOLLOWING REMOVAL OR INSTALLATION OF ANY SURFACE MOUNTED ALARMS. SUBMIT SHOP DRAWINGS TO THE FIRE MARSHAL FOR APPROVAL. � Q <br /> ARCHITECT FOR APPROVAL, PRIOR TO INSTALLATION. O S OR RECESSED FURNISHINGS, RECEPTACLES, UTILtTY PIPING, SHELF STANDARDS & 4. REQUESTS ON SUBMITTALS FOR DIMENSIONS WHICH CAN BE DISCERNABLE W J �- <br /> 23. PRIOR TO NEW FLOORING INSTALLATION REMOVE EXISTING FLOOR FINISHES. PATCH ALL OTHER SIMILAR ELEMENTS INDICATED TO BE REMOVED DURING THE THROUGH MATHEMATICAL MEANS FROM INFORMATION ALREADY PROVIDED ON THE � Q � <br /> 16. PROVIDE ADEQUATE SHORING, BRACING, BARRICADES AND PROTECTIVE MEASURES ¢ <br /> AS REQUIRED TO SAFELY EXECUTE THE WORK IN THE CONSTRUCTION AREA AND AND REPAIR SUB-FLOOR AS REQUIRED. PREPARE FLOORS AND TRANSITIONS AS DEMOLI110N PHASE OR INSTALLED DURING THE CONSTRUCTION PHASE: TAPE AND CONTRACT DOCUMENTS WILL NOT BE PROVIDED. �- C z <br /> THE AREAS ADJACENT TO THE CONSTRUCTION AREA. CEASE OPERATIONS AND REQUIRED FOR SMOOTH AND LEVEL FINISH PER APPUCABLE BUILDING CODES. 1. CONTRACTOR MUST NOTIFY ARCHITECT DESIGNER OF ANY DISCREPANCY W SEAL ALL SEAMS W1TH JOINT COMPOUND: APPLY NEW FINISH TO MATCH EXISTING D O O R N OT E S J G - <br /> � FINISH AT ADJACENT GYPSUM BOARD SURFACES AND FEATHER NEW FINISH WITH 5. SUBMITTALS NOT REQUESTED BY THE CONTRACT DOCUMENTS MAY OR MAY NOT Q = <br /> NOTIFY THE ARCHITECT IMMEDIATELY IF THE STRUCTURE APPEARS TO BE _ <br /> 24. ALL FLOORING TRANSITIONS AMONG ALL THE DIFFERING FLOORING MATERIAL PLANS. FINISH ITEMS CLEARLY SHOWN IN PLANS, BUT OMITTED FROM SCHEDULES EXISTING FINISH TO PROVIDE CONSISTENT & CONTINUOUS FINISH. BE REVIEWED AT THE DESIGN TEAMS DISCRETION. cn I"� � <br /> ENDANGERED. DO NOT RESUME OPERATIONS UNTIL CORRECTIVE MEASURES HAVE OR LEGENDS MUST STILL BE PROVIDED AND INSTALLED BY CONTRACTOR. � L- <br /> BEEN TAKEN. SPECIFICATION TYPES ARE TO BE A FLUSH TRANSITION. CONTRACTOR TO VERIFY OMITTED FINISHES WITH ARCHITECT OR DESIGNER PRIOR z I- Q <br /> TO ORDERING PRODUCTS. 1. VERIFY THAT ALL DOORS AND DOOR HARDWARE MEET THE REQUIREMENTS OF ALL 6. SUBMITTALS ARE TO BE ROUTED THROUGH THE ARCH►TECT AND ARE NOT TO BE � W � <br /> 17. CONTRACTOR SHALL MAfNTAIN REQUIRED MEANS OF EGRESS AND ENSURE THAT 25. FEATHER SUB-FLOOR UP FOR A) TILE FLOORING TO CARPET AND B) VINYL � <br /> FLOORING TO CARPET, FOR FLUSH INSTALLATION. GOVERNING CODES & STANDARDS. NOTIFY THE ARCHITECT IMMEDIATELY IN CASE SENT DIRECTLY TO ARCHITECT S CONSULTANTS UNLESS SPECIFICALLY AUTHORIZED � <br /> EXIT ROUTES ARE SIGNED, LIGHTED AND PROTECTED IN ACCORDANCE WITH CODE 2. SHOP DRAWINGS MUST BE PROVIDED FOR APPROVAL PRIOR TO FABRICATION TO BY THE ARCHITECT. o <br /> REQUIREMENTS. RELOCATE EXISTING AND/OR PROVIDE SMOKE PROTECTORS AND THE ARCHITECT. CABINETMAKER SHALL USE ON SITE FIELD FRAMING DIMENSIONS Q OF DISCREPANCY. � � � <br /> LIFE SAFETY EQUIPMENT FOR ADEQUATE COVERAGE. 26. INSTALL METAL TRANSITION STRIPS WHERE TILE MEETS ALL OTHER FLOORING FOR ALL SHOP DRAWINGS AND FABRICATIONS. ANY SUBSTITUTIONS TO THE POWE R VC S I G NAL N QTES ``' > <br /> TYPES. PROVIDE LOW PROFILE TRANSITION STRIP WHERE ALL OTHER DIFFERENT 2. FIELD MEASURE AS REQUIRED ALL DOORS PRIOR TO FABRICATION. <br /> F L O O R T Y P E S M E E T, V E R IFY COLOR. FOLLOWING SPECIFICATIONS MUST BE APPROVED BY THE ARCHITECT PR I O R T O ' ' � �-`-- L j,� <br /> 18. PROVIDE TEMPORARY NON-COMBUSTIBLE CONSTRUCTION BARRIERS WHERE FABRICATION. 7. M I N O R C H A N G E S I N T H E W O R K M A Y O C C U R A S A RESULT OF THE DESIGN TEAM S � W � <br /> REQUIRED BY CODE AND THE GOVERNING FIRE AUTHORITY. MINIMUM 3. PROVIDE A SIGN ON OR NEAR THE MAIN EXIT DOOR READING: REVIEW. IF A CHANGE RESULTS IN MODIFICATIONS TO THE CONTRACT PRICE OR <br /> REQUIREMENTS: 27. CONTRACTOR TO HEAT/CHEMICAL SEAM VINYL FLOORING AS PER 3. CABINET MAKER TO COORDINATE & VERIFY WITH CONTRACTOR FINAL LOCATION "THIS DOOR TO REMAIN UNLOCKED WHEN BUILDING IS OCCUPIED". SCHEDULE, THE CONTRACTOR WILL ISSUE A CHANGE ORDER REQUEST FOR REVIEW oo � j <br /> 1. COORDINATE TELEPHONE DATA INSTALLATION WITH APPROPRIATE AND APPROVAL BY THE OWNER AND ARCHITECT PRIOR TO PROCEEDING. o � <br /> MANUFACTURER'S SPECIFICATIONS AND SEAL A�L VINYL FLOORS PER FOR CANTILEVERED COUNTERS FOR IN-WALL SUPPORT BRACKETS, PRIOR TO � 4. VERIFY THAT EXISTING DOORS COMPLY WITH ACCESSIBILITY REQUIREMENTS. � <br /> A. FULL HEIGHT WALL FROM FLOOR TO CEILING. MANUFACTURER'S MAINTENANCE SPECIFICATIONS. GYPSUM BOARD FINISHING OF WALLS. ALL FINAL INSTALLATION HEIGHTS FOR SUB-CONTRACTOR. Q � W <br /> B. STUDS AT 24" O.C., WITH 5/8" TYPE 'X' GYPSUM BOARD. IN-WALL SUPPORT BRACKETS MUST MEET ALL APPLICABLE ACCESSIBILITY CODES � <br /> C. NON-COMBUSTIBLE ACCESS DOOR WITH (3) HINGES AND SPRING CLOSER. 28. FLOOR COVERING INSTALLER TO FOLLOW MANUFACTURER'S SPECIFIED CARPET ANQ STANDARDS WITH COUNTER TOP MATERIAL THICKNESS INCLUDED. 2. ALL EXISTING ELECTRICAL DEVICES ARE TO REMAIN, UNLESS NOTED OTHERWISE. 5. RATED DOORS SHALL COMPLY WITH REQUIREMENTS OF ALL GOVERNING CODES & 11, � <br /> INSTALLATION INSTRUCTIONS. USING ADHESIVES AND INSTALLATION METHODS STANDARDS AND SHALL BEAR A LABEL FROM A RECOGNIZED AGENCY SHOWING REQUESTS FOR INFORMATION (RFI�S� Q � <br /> 19. SURVEY EXISTING FLOORS AND CLEARLY MARK ON FLOOR SURFACE THE REQUIRED WSTRUCTIONS TO MAINTAIN PRODUCT'S WARRANTY. CONTACT CARPET 4. MATERIAL COLORS NOT LISTED SHALL BE REQUESTED FROM ARCHITECT/INTER�OR 3. ALL OUTLETS TO BE INSTALLED AT LOCATIONS SHOWN BY DIMENSIONS ON THE THE SPECIFIC RATWGS. � , � <br /> POWER & SIGNAL PLAN. DIMENSION ALL OUTLETS FROM THE CENTERLINE OF THE 1. THE GENERAL CONTRACTOR IS TO REVIEW ALL PROSPECTIVE RFI's AND MAKE - <br /> LOCATIONS OF ALL BEAMS AND JOISTS. MARK ALL CORE DRILL PENETRATIONS SALES REPRESENTATIVE WITH QUESTIONS PRIOR TO PROCEEDING. DESIGNER ON SHOP DRAWING SUBMITTALS OR BY LETTER. 6. ALL HARDWARE TO BE LEVER-TYPE PER GOVERNING CODES & ACCESSIBILITY EVERY EFFORT TO ANSWER THEM BEFORE SUBMITTING TO THE DESIGN TEAM. '- ^ <br /> AND RECEIVE STRUCTURAL ENGINEER'S APPROVAL PRIOR TO DRILLING CONCRETE OUTLET BOX. NON-DIMENSIONED OUTLETS ARE TO LOCATED AT THE NEAREST � �..` � <br /> WALL STUD. STANDARDS. � O <br /> 29. FLOOR COVERING INSTALLER TO FOLLOW MANUFACTURER'S SPECIFIED CONTOURED 5. ALL UPPERS TO BE LAMINATED TO MATCH BASE CABINETS. BOTH UPPERS & z <br /> 20. CUT RIGID MATERIALS USING MASONRY SAW OR CORE DRILL. PNEUMATIC TOOLS RUBBER BASE INSTALLATION INSTRUCTIONS USING ADHESIVES AND INSTALLATION LOWER CABINETS IN WET AREAS TO HAVE MATCHING PVC EDGE, ALL OTHERS TO 7. DOOR HANDLES, PULLS OR KNOBS SHALL BE INSTALLED AT 40" ABOVE FINISH 2• MINOR CHANGES IN THE WORK MAY OCCUR AS A RESULT OF THE DESIGN TEAM'S � <br /> ARE NOT ALLOWED WITHOUT PRIOR APPROVAL METHODS REQUIRED TO MAINTAIN PRODUCT'S WARRANTY. HAVE PLASTIC LAMINATE EDGE BANDING U.O.N. 4. WHEN OUTLETS ARE GROUPED TOGETHER (2 OR MORE), THEY ARE TO BE SPACED w <br /> FLOOR. ALL OTHER OPERABLE PARTS OF DOOR HARDWARE SUCH AS DEADBOLTS, REVIEW. IF A CHANGE RESULTS IN MODIFICATIONS TO THE CONTRACT PRICE OR w <br /> NO MORE THAN 2" APART. � SCHEDULE THE CONTRACTOR WILL ISSUE A CHANGE ORDER REQUEST FOR REVIEW � <br /> 21. ALL CORE DRILLING OR OTHER NOISY WORK SHALL BE SCHEDULED 48-HOURS IN 6. ALL CABINETS AND DOORS SHALL BE CONSTRUCTED FROM 3 4" THICK MATERIAL, KEYHOLES... ETC.) ARE TO BE CENTERED BETWEEN 34" AND 44" ABOVE FINISH � Q W <br /> ADVANCE WITH THE OWNER. 30. FLOOR COVERING INSTALLER REQUIRED TO PROVIDE MINIMAL SEAMS/JOINTS AT UNLESS APPROVED PRIOR TO EACH JOB. / 5. ALL ELECTRICAL OUTLETS OF 30 AMPERES OR LESS SHALL BE MOUNTED BETWEEN FLOOR. IF EX►STING BUILDING STANDARD EXISTS, MATCH BUILDING STANDARD AND AND APPROVAL BY THE OWNER AND ARCHITECT PRIOR TO PROCEEDING. � <br /> ALL LOCATIONS FOR FLOOR AND WALL BASE MATERIAL INSTALLATION. PROVIDE +15" TO BOTTOM RECEPTACLE AND +48" TO TOP OF RECEPTACLE FROM FIN�SH CONFIRM COMPLIANCE WITH ACCESSIBILITY REQUIREMENTS. m <br /> LOW VOC, BUT HEAVY DUTY ADHESIVES TO ENDURE HEAVY FOOT TRAFFIC, CARTS � <br /> 22. APPLY CEMENT BASE FLOOR PATCH AS REQUIRED TO FILL DINGS, NAIL HOLES, � 7. ALL BASE CABINET ARE NOT TO RECEIVE WALL BASE UNLESS INDICATED ON FLOOR. SEE NOTE 6, BELOW, FOR GENERAL MOUNTING HEIGHT � <br /> AND TO MAINTAIN PRODUCT S WARRANTY. 8. SPECIAL LOCKING DEVICES SHALL BE OF AN APPROVED TYPE. 3. AN RFI LOG IS TO BE MAINTAINED BY THE GENERAL CONTRACTOR AND A �., <br /> CHIPS AND CRACKS. FINISH PLANS OR ELEVATIONS. � <br /> CURRENT COPY IS TO BE INCLUDED WITH EACH RFI SUBMISSION ALONG WITH ANY ,� <br /> 6. ALL NEW WALL MOUNTED 15 20 AND 30 AMP OUTLETS RECEPTACLES TO BE g, PROVIDE WEATHER SEALS ON ALL EXTERIOR DOORS PER ANSI STANDARDS. w <br /> 23. AT FLOOR AREAS SCHEDULED TO RECEIVE NEW FLOOR COVERING, REMOVE 31. PRIOR TO PAINTING, WALLS MUST BE PATCHED AND REPAIRED, CLEAN AND DRY g, ALL INTERIORS OF CLOSED CABINETS TO BE WHITE MELAMINE/POLYESTER OR CENTERED AT +18" A.F.F., U.O.N. / CRITICAL RESPONSE DUE DATES. Y <br /> AND PROPERLY MEMBERED AND ALIGNED S0, AS TO LEAVE NO EVIDENCE OF <br /> EXISTING FLOOR COVERING AND PREPARE SUBSTRATE FOR NEW FLOOR COVERING APPROVED EQUAL, UNLESS OTHERWISE SPECIFIED. � o <br /> PER SPECIFICATIONS AND MANUFACTURER'S REQUIREMENTS. PATCHING OR REPAIRS. ALL SCREW AND NAIL HEADS MUST BE SET AND 10. CONTRACTOR IS RESPONSIBLE TO COORDINATE & VERIFY ALL DOOR FRAME 4. RFI s REGARDING METHODS AND MEANS OF CONSTRUCTION WILL NOT BE REVIEWED � <br /> SPACKLED. ALL JOINTS MUST BE TAPED AND COVERED WITH JOINT COMPOUND. 7. ALL TELEPHONE AND DATA CABLE TO BE TEFLON COATED PLENUM RATED CABLE, � AND WILL BE REMOVED FROM THE RFI LOG. Y <br /> JOINTS THAT ARE FILLED TO BE SANDED SMOOTH AND DUST REMOVED PRIOR TO 9• ALL OPEN CABINETS OR SHELVES TO HAVE PLASTIC LAMINATE TO MATCH SUPPORTED INDEPENDENTLY FROM SUSPENDED CEILING SYSTEM. CABLING TO BE THROAT THICKNESS FOR EACH LOCATION. W , <br /> 24. AT ABANDONED PENETRATIONS OF FIRE RATED WALLS, CEILING OR FLOOR EXTERIORS. SUPPLIED BY TENANT; ALL PULLS AND TERMINATIONS BY GENERAL CONTRACTOR. � a <br /> CONSTRUCTION, COMPLETELY SEAL VOIDS WITH FIRE RATED MATERIAL TO FULL RECEIVING NEW PAINT FINISH APPLICATION. 11. ALL DOOR FRAMES TO BE FACTORY FINISHED, U.O.N.. o � <br /> THICKNESS OF THE PENETRATED ELEMENT. ALL PATCHING OF EXISTING WORK TO 32. PRIOR TO PAINTING OVER WALL COVERING, SECURELY GLUE DOWN ANY LIFTING OR 10. NO 3/4" THICK SHELF SHALL SPAN LONGER THAN 32" WITHOUT SUPPORT. 8. LOCATIONS OF FURNITURE POWER FEEDS SHALL ACCOMMODATE CIRCUITS AND CHANGE ORDERS >- � <br /> 12. ALL WALL DOOR STOPS TO HAVE 2x6 BACKING IN THE WALL BEHIND. z <br /> REMAIN SHALL MATCH FINISH PER SCHEDULE OR WHERE UNSCHEDULED TO BUCKLWG AND HIDE ALL SEAMING OR BUMPS. WIRE PER ELECTRICAL DRAWINGS. TENANT SHALL BE RESPONSIBLE FOR 1. A COMPLETE SCHEDULE OF VALUES OF THE BASE CONTRACT IS TO BE PROVIDED a <br /> MATCH EXISTING FINISHES TO REMAIN, AND SHALL MEET OR EXCEED FIRE RATING 11. ALL SHELVING TO BE ADJUSTABLE UNLESS OTHERWISE SPECIFIED. PROVIDING FURNITURE POWER FEED, GENERAL CONTRACTOR SHAL� INSTALL THE �3. MAXIMUM UNDERCUT OF ALL DOORS NOT IN A RATED CORRIDOR SHALL NOT TO THE OWNER AND ARCHITECT PRIOR TO THE START OF ANY WORK. o <br /> INDICATED ON FLOOR PLAN AND AS REQUIRED BY THE FIRE/LIFE SAFETY 33. WALLS TO HAVE AT LEAST ONE COAT OF COLORED PRIMER AND TWO COATS OF POWER FEED. EXCEED 1 <br /> INSPECTOR. 12. ALL FILE PEDESTALS ARE TO BE CONFIGURED FOR "FRONT TO BACK" FILING AND /2" ABOVE FINISH FLOOR SURFACE. � <br /> SPECIFIED PAINT FINISH TYPE. PAINT TO BE A LOW VOC UNLESS U.O.N. H►GH <br /> TRAFFIC/WEAR ABILITY WITH GOOD SCRUB AND CLEANING ABILITY. VERIFY ALL BE ABLE TO ACCEPT METAL HANGERS TO ACCEPT PENDAFLEX TYPE FILE 9. WHERE DEDICATED ELECTRICAL OUTLETS ARE NOTED WITHIN THE FURNITURE 2. ALL CHANGE ORDER REQUESTS ARE TO BE REVIEWED AND APPROVED BY THE � <br /> 25. COORDINATE EXISTING SPRINKLER LINE AND HEAD LOCATION WITH NEW PLAN. FOLDERS, UNLESS NOTED AS LATERAL. 14. CONTRACTOR SHALL REFINISH ANY BLEMISHED DOOR OR REPLACE SAID DOOR IF OWNER AND ARCHITECT PRIOR TO SUBMISSION OF A CHANGE ORDER. <br /> WITH TENANT OR OWNER PRIOR TO PURCHASING PAINT. PANEL SYSTEM, THE PANEL SYSTEM SHALL ACCOMMODATE THIS REQUIREMENT. w <br /> SUBMIT SPRINKLER SHOP DRAWINGS TO ARCHITECT FOR REVIEW WITH THE CITY NOT ABLE TO REFINISH TO "AS NEW" CONDITION. °� <br /> FlRE DEPARTMENT. �� � � <br /> 34. PAINT ALL SPEAKER COVERS AND HVAC GRILLS IN GYPSUM BOARD WALLS AND 13. ALL COUNTER TOPS TO BE 24 DEEP, UNLESS OTHERWISE SPECIFIED. WHERE NO 10. F�OOR OUTLETS ARE ACCEPTABLE NEXT TO SLIDING PANELS/WALLS AND OTHER o w <br /> 15. ALL DOORS TO BE OPERABLE FROM THE INSIDE WITHOUT A KEY OR ANY SPECIAL <br /> CEILINGS TO MATCH ADJACENT PAINT COLOR AS SPECIFIED. BACKSPLASH IS SPECIFIED, COUNTER TOPS TO BE SCRIBED TIGHTLY TO BACK & SPECIAL CONVENIENT LOCATIONS. 3. CHANGE ORDER REQUESTS ARE TO INCLUDE A COMPLETE BREAKDOWN BY TRADE z W Q <br /> 26. CONTRACTOR IS RESPONSIBLE FOR BUILDING SECURITY DURING DEMOLITION KNOWLEDGE OR EFFORT. � O o <br /> PHASE. PROTECT ALL OPENINGS FROM WEATHER CONDITIONS AND SECURE THEM SIDE WALLS. ALONG WITH TRADE BACK-UP AND UNIT PRICING WHERE APPLICABLE. <br /> 35. PRIOR TO INSTALLING WALL TILES AND WALL BASE TILE, WALLS MUST BE 11. WHERE ELECTRICAL WORK IS SPECIFIED IN CONJUNCTION WITH CABINET WORK, N <br /> TO PREVENT VANDALISM. PATCHED AND REPAIRED, CLEAN AND DRY AND BE PROPERLY MEMBERED AND 14. ALL BACKSPLASHES TO BE SCRIBED TO WALLS, AND MUST BE FLUSH TO EDGE LAMPS AND FIXTURES ARE TO BE PROVIDED BY THE GENERAL CONTRACTOR. 16. ALL DOORS WITH ELECTRONIC SECURITY DOOR LOCKS MUST BE OPENABLE FOR 4. A CHANGE ORDER REQUEST AND CHANGE ORDER LOG IS TO BE MAWTAINED BY z <br /> EXITING PURPOSES UNDER ALL CONDI110NS. INCLUDING A POWER OUTAGE. � <br /> ALIGNED, S0, AS TO LEAVE NO EVIDENCE OF PATCHING OR REPAIRS. ALL SCREW OF BASE, UNLESS OTHERWISE SPECIFIED. ALL COUNTER TRANSITION SEAMS MUST THE GENERAL CONTRACTOR AND SUBMITTED ALONG WITH EACH CHANGE ORDER z <br /> 27. DO NOT PERFORM ANY WORK THAT WILL VOID WARRANTIES OF EXISTING 12. CUT-OUTS FOR SWITCHES, OUTLETS, ETC. AS REQUIRED BY THE CABINET REQUEST. ¢ <br /> AND NAIL HEADS MUST BE SET AND SPACKLED. ALL JOINTS MUST BE TAPED AND BE CAULKED SEA�ED, VERIFY EITHER MATCHING COLOR CAULK OR C�EAR Q <br /> WEATHER EXPOSED OR MOISTURE RESISTANT ELEMENTS WITHOUT PRIOR COVERED WITH JOWT COMPOUND. JOINTS THAT ARE FILLED ARE TO BE SANDED SILICONE. CONTRACTOR ARE TO BE COORDINATED WITH THE ELECTRICAL CONTRACTOR, 17. IF BUILDING STANDARDS ARE INCONSISTENT FOR DOORS, RELITES, HARDWARE, m <br /> APPROVAL FROM THE OWNER. U.N.O. ALL RECEPTACLES WHERE MILLWORK OCCURS SHALL BE LOCATED PER DOOR AND RELITE FRAMES OR OTHER STANDARD DETAILS, THEN CONTRACTOR o � <br /> SMOOTH AND BUMP FREE WITH DUST REMOVED PRIOR TO RECEIVING MORTAR ELEVATIONS OF THE MILLWORK ITEM W QUESTION. MUST VERIFY WITH DESIGNER AND OWNER PRIOR TO CONSTRUCTION. � W <br /> BED/BOND COAT AND WALL TILES. 15. PROVIDE SIDE SPLASHES AT LOCATIONS ADJACENT TO WALLS OR WINDOWS, � z <br /> 28. ARCHITECT ASSUMES NO RESPONSIBILITY RELATING TO ANY TOXIC MATERIALS, ESPECIALLY FOR SINKS U.O.N. W <br /> � INCLUDING ASBESTOS, AND ASSUMES NO RESPONSIBILITY TO ITS EXISTENCE OR 36. ALL WALL TILES ARE TO HAVE A MORTAR BED/BOND COAT THICKNESS TO 13. ALL WALL COVER PLATES SHALL BE WHITE, UNLESS BUILDING STANDARD IS �w � <br /> � REMOVAL THE OWNER WILL TAKE ACTION FOR DIRECTLY CONTRACTING WITH A 16. FACES OF PIGEONHOLES TO MATCH WORK SURFACE LAMINATE. COLOR OF EDGE DIFFERENT MATCH BUILDING STANDARD. D E S I G N B U I L D N OT E S ¢ � � � <br /> � ACCOMMODATE THE VARYING THICKNESSES OF ALL MATERIAL TYPES OF TILE ' � (� Y <br /> CONSULTANT OR SPECIALIST LICENSED BY THE STATE FOR SUCH SERVICES SPECIFIED FOR WA�L INSTALLATION WITH A FLUSH FRONT FACE. Q ,.i., - <br /> BANDING ON ALL DOORS TO MATCH FACE MATERIAL. <br /> o S H O U L D T H O S E S E R V I C E S B E R E Q U I R E D O N T H E P R O J E C T. 14. ALL SEPARATE CIRCUIT RECEPTACLES TO BE ORANGE COLOR WITH BUILDING o w w w <br /> Q <br /> 0 3 7. A L L T R A N S L U C E N T G L A S S T I L E S P E C I F I E D A R E T O R E C E I V E U N I F O R M C O V E R A G E 1 7. S E E S P E C I F I C A T I O N S/P R O J E C T M A N U A L F O R A D D I T I O N A L R E Q U I R E M E N T S. STANDARD COLOR COVER PLATE. � � � � <br /> 29. IF THE EXISTING BUILDING CONSTRUCTION IS CLASSIFIED SUCH THAT = <br /> �" FIREPROOFING INSULATION IS PRESENT, THEN THE CONTRACTOR PRIOR TO BY BACK BUTTERING TILES AND TROWEL RIDGES FLATTENED PRIOR TO SETTING c� � <br /> TRANSLUCENT GLASS TILES. 18. COUNTERTOPS SHALL HAVE A NOSING OF COUNTERTOP MATERIAL AT LEAST 3" 15. POWER/SIGNAL AND REFLECTED CEILING PLANS ARE FOR THE GENERAL 1. LIGHT SWITCHES SHALL BE INSTALLED AT +48" A.F.F. MULTIPLE SWITCHES � �' � <br /> i STARTING ANY WORK, SHALL VERIFY THE CURRENT FIRE-RESISTANCE RATING(S) INFORMATION OF THE CONTRACTOR. EXACT LOCATIONS SHOULD BE VERIFIED. � o �` <br /> DEEP WHEREBY THE COUNTER MATERIAL EXTENDS INTO THE INSIDE OF THE SHOULD BE GANGED TOGETHER UNLESS OTHERWISE SPECIFIED. o <br /> � OF THE EXISTING BUILDING ELEMENT(S). IF THE EXISTING FIREPROOFING ' � � ,�, <br /> 38. FLOORS OF TOILETS, BATHING AND SHOWER ROOMS SHALL HAVE A SMOOTH, CABINET, I.E. OVER THE DOOR (WHEN PRESENT). , � <br /> � INSULATION IS DAMAGED/AFFECTED DURING THE COURSE OF THE WORK, AS HARD, NONABSORBENT SURFACE. THE INTERSECTION OF SUCH FLOORS WITH 16. TENANT TO PROVIDE AND INSTALI. THE TE�EPHONE AND DATA COMMUNICATION 2. CONTRACTOR TO VERIFY ALL SWITCH LOCATIONS WITH THE ARCHITECT PRIOR TO � � � <br /> j DEFINED BY THIS PROJECT SCOPE, THEN THE CONTRACTOR SHALL PATCH/REPAIR WALLS SHALL HAVE A SMOOTH, HARD, NONABSORBENT VERTICAL BASE AS 19. END PANELS AND FRONT EDGES OF EDGE PANELS WHICH ARE PROUD OF THE CABLING. CONTRACTOR TO COORDINATE SCHEDULING AND OTHER REQUIREMENTS INSTALLATION. NUMBER OF SWITCHES FOR OPEN AREA IS BIDDER DESIGN. a 0O - <br /> � THE FIREPROOFING INSULATION TO A CONDITION THAT SHALL MATCH OR EXCEED SPECIFIED IN FINISH PLANS OR RESTROOM ELEVATIONS. BASE SHALL EXTEND INTERIOR CABINET SHALL BE FACED TO MATCH DOOR FRONTS. WITH TENANT. SWITCHES INDICATED ON THE DRAWINGS FOR OPEN AREA ARE FOR REFERENCE � rn a, <br /> � THE ORIGINAL FIRE-RESISTANCE RATING(S) OF THE EXISTING BUILDING UPWARD ONTO THE WALLS NOT LESS THAN 4 INCHES. ONLY. � W o 0 <br /> � ELEMENT(S). 20. ALL HINGED DOORS TO HAVE CLEAR SILENCERS TOP AND BOTTOM ON DOOR (NOT 17. ALL/ANY CORE DRILL LOCATIONS SHALL BE VERIFIED WITH DESIGNER PRIOR TO � Q � o <br /> =" 3 9. W A L L S A N D P A R T I T I O N S W I T H I N 2 F E E T O F S E R V I C E S I N K S, U R I N A L S A N D W A T E R CABINET). D R I L L I N G. A L L U N U S E D C O R E D R I L L S S H A L L B E P L U G G E D A N D C A P P E D A S 3. C O N T R A C T O R S HALL PROVIDE SEISMIC BRACING AT ALL NEW AND RELOCATED � o � �- <br /> � 30. CONTRACTOR TO RELOCATE AND REUSE EXISTING DOORS AND HARDWARE WHERE CLOSETS SHALL HAVE A SMOOTH, HARD, NONABSORBENT SURFACE TO A HEIGHT REQUIRED TO MAINTAIN FLOOR FIRE RATING. ' LIGHT FIXTURES. � o 0 <br /> j POSSIBLE. OF NOT LESS THAN 4 FEET ABOVE THE FLOOR. 21. ALL DRAWERS GLIDES SNALL HAVE SILENCERS BUILT INTO THE GLIDE AND NOT � <br /> INSTALLED ON THE DRAWER OR DRAWER FRONT. 18. ALL TELEPHONE AND COMPUTER WIRES SHALL BE PULLED BY TENANT 4. CONTRACTOR SHALL VERIFY AND PROVIDE A COMPLETE HVAC SYSTEM WHICH <br /> i 31. EXISTING DOORS TO REMAIN U.O.N. 40. CONTROL JOINTS AT GYPSUM BOARD ASSEMBLIES: THE MAXIMUM RECOMMENDED CONTRACTOR U.O.N. ELECTRICAL CONTRACTOR SHALL PROVIDE PULL WIRES AND CONFORMS TO THE OWNER'S HVAC SPECIFICATIONS. CONTRACTOR SHALL BE � <br /> � CONTROL JOINT SPACING FOR WALLS AND CEILINGS WITHOUT PERIMETER RELIEF IS 22. A�L DRAWER GLIDES SHALL BE FULL EXTENSION. BOXES AT EACH LOCATION. RESPONSIBLE FOR ALL ROOF PENETRATIONS AND PATCHING, ANY SCREENING OF ¢ <br /> � 32. ALTERNATE CONSTRUCTION WASTE DISPOSAL-RECYCLING OF ACOUSTICAL TILES 30 LINEAR FEET OR 900 SQUARE FEET OF SURFACE AREA, WITH PERIMETER ROOF-MOUNTED MECHANICAL UNIT REQUIRED BY GOVERNING JURISDICTION. Z PA/PM: C. KANG ' <br /> � RELIEF IS 50 LINEAR FEET OR 2,500 SQUARE FEET OF SURFACE AREA. EXTERIOR 23. ALL HINGES SHALL OPEN t105', EXCEPT WHERE CABINETS ARE ADJACENT TO THE 19� CONTRACTOR SHALL OBTAIN APPROVAL FROM ARCHITECT FOR ALL THERMOSTAT o <br /> JOINT SPACING IS RECOMMENDED AT 30 LINEAR FEET OR 900 SQUARE FEET OF LOCATIONS. � <br /> i A. CEILING MATERIAL BEING RECLAIMED MUST BE KEPT DRY AND FREE FROM DEBRIS. WALLS. PROVIDE HINGES WHICH LIMIT THE DOOR SWING TO KEEP THE DOOR PULL � DRAWN BY: R.F. <br /> ,Q B. BEFORE DISPOSING OF CEILWGS, CONTACT THE ARMSTRONG RECYCLING CENTER SURFACE AREA. FROM DAMAGING THE WALL. � <br /> � AT 877-276-7876, SELECT OPTION #4 TO TALK TO A CONSULTANT. THEY WILL W JOB NO.: SEA18-6210-01 <br /> � VERIFY THE CONDITION OF THE MATERIAL AND THAT IT MEETS THE ARMSTRONG 41. CONSTRUCTION JOINTS (EXPANSION JOINTS) AT GYPSUM BOARD ASSEMBLIES: � <br /> � REQUIREMENTS FOR RECYCLING. CONSULTANT WILL PROVIDE ASSISTANCE TO CONSTRUCTION JOINTS ARE REQUIRED AT CONTINUOUS GYPSUM BOARD SURFACES �' <br /> / � SHEE <br /> FACILITATE THE RECYCLING OF CEILING MATERIAL. WITH DISSIMILAR WALL STRUCTURE ¢ ' <br /> 0 <br /> � <br /> � <br /> � <br /> c� <br /> � z <br /> m <br /> 0 <br /> Q N <br /> � � . . . . . . . � � � <br /> 6 <br /> � � � � <br /> / . . . . W � . � � p � <br /> � . . . . . � . . � � ' <br /> W -o <br /> � . � . . . � � . >N <br /> > <br />