My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2929 ROCKEFELLER AVE SNO CO FACILITIES 2019-04-29
>
Address Records
>
ROCKEFELLER AVE
>
2929
>
SNO CO FACILITIES
>
2929 ROCKEFELLER AVE SNO CO FACILITIES 2019-04-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2019 3:54:19 PM
Creation date
4/29/2019 3:54:15 PM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
2929
Tenant Name
SNO CO FACILITIES
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FOR OFFICE USE ONLY PERMIT# ,(-- -A O- a2_0 <br /> BUILDING PLANNING. <br /> Bldg/TI/Addn/Rem Size Zoning Classification <br /> Garage Size Overlay/Agreement <br /> VALUATION Nonresidential Use <br /> Number of Stories Residential Use <br /> Occupancy Group Proposed No. of Dwelling Units: <br /> Occupant Load Total No. of Dwelling Units: <br /> Basement No_ Ye Fin / Unfin Landscape or Planning Inspection <br /> Type of Construction needed before final? Yes_ No_ <br /> Existing Sprinkler System? Yes / No_Unk_ Planning Inspector: <br /> Fire Sprinkler Required Ye- No Phone#: <br /> Reason i Approved by: Date: <br /> Existing Fire Alarm 'Yes No_Unk Historic Approved by: Date: <br /> Fire Alarm Required Yes_ No_ School Mitigation Reqd? Yes_ No_ <br /> Reason Everett School Dist Mukilteo School Dist <br /> RCW 64.55 MF w. sheet req'd for permit? Yes No_ #of Net New Units: <br /> Add.]RCW 64.5 docs required prior to final?Yes _ Calculated School Impact Fee: <br /> Architectura Approved By/Date: School Impact Fee Credit: <br /> Structural pproved By/Date: �� Total School Impact Fee Owed: <br /> Comme s: Comments: <br /> Intake OK by: Intake OK by: Ok to route _ Hold <br /> Make this a"W" Permit? Yes No <br /> PUBLIC WORKS <br /> FEES INTAKE: Checked By: Date: <br /> Plan Check Fee Comments: <br /> Building Permit <br /> Surcharge High Hazard Sites(Dental/Medical,Animals,Mortuary,etc-Review for RPBA) <br /> Additional Plan Check 0 Public Works/Sys Dev/Traffic Mit./RPBA-NOT REQUIRED <br /> Plumbing Fee 0 Route for Public Works Review(bldg folder, PW Worksheet) <br /> Mechanical Fee 0 Public Works Permit-Concurrent Review(separate green folder) <br /> Ping Bldg Review Fee PW REVIEW: PW Reviewer: Date: <br /> Water Fee 0 PW Permit Approved-PW <br /> Sewer Fee 0 See PW Review Worksheet <br /> Systems Dev. Fee ❑ PW Permit Not Required <br /> Traffic Mitigation Fee <br /> Public Works Fee FIRE DEPARTMENT <br /> School Mitigation Fee Update/New Sprinklers Yes_ No_ Existing Bldg._ <br /> Update/New Detection Yes_ No_ Existing Bldg. <br /> Update/New Chemical Yes_ No_ Existing Bldg. <br /> Update/New Fire Service Yes_ No_ Existing Bldg._ <br /> Approved by: Date: <br /> Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.