Laserfiche WebLink
Tony Lee <br /> From: Charles Johnstone <br /> Sent: Monday, October 23, 2017 10:09 AM <br /> To: Tony Lee; Shellie Pons <br /> Cc: Darold Walden;Jeff Kerwin <br /> Subject: RE: New Hood <br /> I don't actually have record of IPT inspections there in the past. Churches must meet minimum requirements, but <br /> without ID'd problems have generally been low priority for monitoring vs. commercial foodies. <br /> I can go pay them a visit if Jeff would like.Or you could let me know when called for an inspection on the hood and I <br /> could meet you there to confirm what they have in place. <br /> I know the church has been there since 1890s, and I see sewer connections last made in early'50s per GoSync. Looks like <br /> the sewer in alley was redone with utilities work in Hewitt in 2003. I don't see anything on kitchen space in record <br /> drawings. But if the facilities included an inside grease trap it was likely a steel one and could have long since been <br /> replaced or removed. Our only issue would be if they removed it at some point but without retrofitting in a new one. <br /> Charles <br /> X82224 <br /> From:Tony Lee <br /> Sent:Saturday, October 21, 2017 1:58 PM <br /> To: Charles Johnstone<CJohnstone@everettwa.gov>;Shellie Pons<SPons@everettwa.gov>; Darold Walden <br /> <DWalden@everettwa.gov> <br /> Subject: New Hood <br /> A new hood is going in at 2936 Rockefeller—First Presbyterian Church <br /> The permit history suggests an existing kitchen and grease trap (like all churches) but not a commercial kitchen and <br /> grease interceptor.... <br /> Anyone been here? <br />