Laserfiche WebLink
r INSPECTION REPORT <br /> ,air Date 11 Permit: t 1-106~ <br /> ,z 71F- <br /> Contractor: O <br /> Owner: <br /> ( QiQ b \ <br /> ti <br /> Site Address: k` /9--l)d i-P.)( N-b <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑ lab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> h In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final� ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: ArICU--"1-1\—CtLoa.I <br /> /APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> OK FOR T.C.O. ❑ CORRECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> el <br /> P ~h/ /o �ti �40`. <br /> •t �- re-,Al l re e ss. e <br /> �Leivl <br /> D <br /> P,,,,,,„70 b'e J-U be l i.<.� <br /> a ! crn i wa - pe , 14.Llf <br /> P <br /> Inspector: Date: ��X <br /> P(: <br /> EIR(10/06) DATABA',INC. <br />