Laserfiche WebLink
.s <br /> INSPECTION REPORT <br /> A <br /> _; <br /> Date 1\UI 1/1 Permit: C`jOL—IOeli LA <br /> Contractor: <br /> y <br /> Owner: 12.1,40 - <br /> Site Address: 0O -Y\ -- - <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear NailingGQS PIPE <br /> SITE WORK ❑Roof Nailing gh In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: mow E39j'.-12 <br /> ❑ APPROVAL ❑ PARTI OVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. RRECTION REQUESTED 111❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> i IP d ,,,),,/ 7- 0 <br /> 3 ,) 6052 cf� • F® . <br /> L-- --C k <br /> Re75J <br /> J <br /> Inspector: Date: - 1 "/g—/ <br /> EIR(10/06) / D ABAR,INC. <br />