Laserfiche WebLink
INSPECTION REPORT <br /> /1 L, v <br /> #t rte- Date 7"�'ig Permit: Oi'7O f a `o____ <br /> Contractor: 3 <br /> — — - <br /> Owner: ---%\i Ni <br /> 6 an <br /> Site Address:� 4\-3 --thejd <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units PI Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION:3_LdQ__& C <br /> ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> rAPPROVALOK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> Ig <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> \\ 6‘\Cke cec4- Qat c 0 Y1€ <br /> (e <br /> t. <br /> L- -)c7 <br /> Inspect Date: <br /> EIR(10/06) DATABAR,INC. <br />