Laserfiche WebLink
3011 44-th <br /> S-1- L Cot <br /> G EO DESIGN FIELD REP• <br /> 1 of <br /> Project Name: Everett River Front-Simpson Report 119 <br /> GeoDesign 4t: Polygon-127-01 Date: 9/27/2016 <br /> Reports with Unresolved Nonconformance Issues: Permit: <br /> PW1505-005 <br /> tp0' <br /> Nick Abdelnour(Polygon) Randy Allen(City of Everett) Weather:Clear, 60's <br /> Ron Bowen(Polygon) Eddy Stevens(Polygon) Arrival/Departure: 1445/1630 <br /> Distribution: <br /> Doug Ross(Polygon) Kirk Keck(City of Everett) <br /> Paul McKee(City of Everett) Dave Foster(City of Everett) Prepared By: Ben Weinberg, E.I.T. <br /> Attachments: 0 Site Plan(s) 0 Density Test Summary Signature: <br /> ❑ Installation Records 0 Other Reviewed By: gx <br /> PURPOSE of VISIT: GeoDesign representative, Benjamin Weinberg, was on-site at the request of John Feltner with <br /> Polygon to observe foundation subgrade for Lots 162 and 163. <br /> SUMMARY of OBSERVATIONS: <br /> Lots 162 and 163: <br /> Upon arrival, GeoDesign noted that the exposed foundation subgrade for the east half of Lots 162 and 163 consisted of a <br /> dark brown sandy SILT with minor organics(roots)which could be probed 1 to 2 feet using a 1/2 inch diameter soil probe <br /> under the full weight of the user; an in-place density test taken on the above-mentioned material using a Troxler <br /> Moisture-Density gauge indicated that the exposed foundation subgrade hada dry density of 98.8 pcf at a moisture content <br /> of 23.4%. <br /> GeoDesign notified John Feltner with Polygon that the above-mentioned areas were unsuitable for support of the intended <br /> structure and recommended that the footings either be extended down to underlying firm and unyielding material or to <br /> remove the unsuitable material and replace with structural fill. GeoDesign clearly marked the areas that were unsuitable for <br /> support of the intended structure using orange spray paint. Polygon elected to remove the unsuitable material and replace <br /> with structural fill. Polygon requested that GeoDesign observe a stockpile of on-site material to assess its suitability for use <br /> as structural fill. <br /> GeoDesign noted that the two stockpiles of material along the south perimeter of Phase 1 generally consisted of a <br /> gray-brown silty SAND with gravel that appeared to be slightly above its optimum moisture content. In-place moisture <br /> readings taken on the stockpiled material using a Troxler Moisture Density gauge indicated that the material was at a <br /> moisture content ranging from 7.2%to 11.5%, with an average moisture content of approximately 10%. Based on our <br /> previous experience with on-site material, it is our opinion that the stockpiles were currently suitable for use as structural fill <br /> and should be able to achieve 95% relative compaction of its maximum dry density as determined by a Modified Proctor <br /> analysis. GeoDesign emphasizes that the material stockpiles should be protected from precipitation to avoid the material <br /> becoming unsuitable for use as structural fill. <br /> A summary of our observations from today's site visit can be found in the attached Figure 1 and Photo Log. • <br /> GeoDesign notified the client of these observations and recommendations prior to our departure from the site today. <br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services,We rely on the contractor to comply with the plans and <br /> specifications throughout the duration of the project irrespective of the presence of our representative.Our work does not include supervision or direction of the contractor,the contractors employees <br /> or agents.Our firm is not responsible for site safety.This field report Is a DRAFT representation of our field observations,testing,and preliminary recommendations.The report can only be considered <br /> final upon review of the GeoDesign project manager,as indicated by Initials In the"Reviewed By"section. <br /> 10700 Meridian Avenue North,Suite 402 I Seattle,WA 98133 I 206.838.9900 <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 I 253.203.0095 <br /> • <br />