Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> EQUIPMENT, and placed within the limits of dimensions defined in the Contract <br /> Documents, or as otherwise approved by the Engineer. <br /> The unit price per ton, based on certified weight tickets, for foundation material shall be full <br /> compensation for all labor, material, tools and equipment necessary to furnish imported <br /> foundation material where required by the engineer to replace unsuitable material. <br /> The unit price for foundation material shall include all costs of furnishing, hauling, <br /> stockpiling, placing, grading and compacting the material in place. <br /> The unit price for this bid item includes all costs for dewatering and over-excavation, <br /> removal and disposal of unsuitable material below the pipe zone or roadway subgrade, and <br /> shall be full compensation for all labor, materials, tools, and equipment necessary including <br /> haul and tipping fees to dispose of the material. <br /> Bid Item 13 - Temporary Roadway Patch <br /> ' Measurement and Payment: Lump Sum (LS) <br /> No measurement will be made for the lump sum item Temporary Roadway Patch. <br /> Payment for the lump sum item Temporary Roadway Patch shall be a one-time lump sum <br /> regardless of how many times Temporary Roadway Patch is placed, removed, replaced, or <br /> relocated. The lump sum price shall be full compensation for all labor, material, tools and <br /> equipment necessary to satisfactorily complete the Work as defined in the Standard <br /> Specifications, 5-06.3(6) of these Special Provisions and as shown on the Plans. <br /> Bid Item 14 - Storm Drain Pipe, 6-Inch <br /> Bid Item 15 - Storm Drain Pipe, 8-Inch <br /> Bid Item 16 - Storm Drain Pipe, 12-Inch <br /> Bid Item 17 - Storm Drain Pipe, 18-Inch <br /> Measurement and Payment: Unit Price per Linear Foot <br /> The unit price per linear foot bid for the type and size of storm drain pipe shall be full <br /> compensation for all labor, material, incidentals, tools and equipment necessary to <br /> complete the work as defined in these Contract Documents. <br /> The unit price per linear foot of storm drain pipe shall be full compensation for furnishing, <br /> hauling, and assembling in place the completed installation, including all wyes, tees, caps, <br /> plugs, special fittings, joint materials and adjustment of inverts and connections to inlets, <br /> catch basins and manholes for the completion of the installation to the required lines and <br /> grades. <br /> The unit price of storm drain pipe shall also include, but not be limited to; all costs for trench <br /> excavation; hauling and disposing of surplus material; dewatering; storm water flow <br /> bypassing; furnishing, stockpiling, hauling placing and compacting of suitable native <br /> backfill; cleaning and flushing pipes and existing structures; testing and inspecting pipe; <br /> pipe separation pads; connecting pipe to existing structures; reconnecting existing storm <br /> ' drains; and replacing, protecting, and maintaining utilities. <br /> All costs associated with abandoning existing storm drainage pipe as indicated on the plans <br /> including plugging and/or removal and disposal shall be included in the unit price for this <br /> 1bid item. <br /> Bid Item 18 - Inlet <br /> ' Bid Item 19 - Catch Basin, Type 1 <br /> Alverson Stormwater Separation Division B—BID ITEM DESCRIPTIONS February, 2019 <br /> WO No—UP3660 SP -7 <br /> I <br />