My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction 4/29/2019
>
Contracts
>
Capital Contract
>
Rodarte Construction 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 10:36:46 AM
Creation date
5/2/2019 10:35:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction
Approval Date
4/29/2019
Council Approval Date
4/10/2019
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Alverson Stormwater Separation
Public Works WO Number
UP3660
Tracking Number
0001736
Total Compensation
$1,460,182.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> shall be on-site, connected to all utilities and fully prepared for occupancy prior to <br /> release of the first warrant to the Contractor. <br /> a. All costs for the Engineer's office, including telephone service for local calls <br /> only, shall be borne by the Contractor and shall be included in the <br /> mobilization cost. <br /> 1-09.9 Payments <br /> Delete 1-09.9 and substitute the following: <br /> 1-09.9 Payments to Contractors <br /> (******) <br /> 1-09.9(1) Progress Payments <br /> Contractor shall submit progress payment estimate for completed Work and material <br /> on hand based upon acceptable Work performed during the previous month, or since <br /> the last partial payment estimate was submitted. Submit progress payment estimate to <br /> City's Representative by the tenth day of each month, or by schedule mutually agreed <br /> upon in writing by the Contractor and City's Representative at the Pre-Construction <br /> Conference. Contractor shall make initial progress estimate not later than 30 days <br /> after the Work begins. Make successive progress estimates every month thereafter <br /> until the Completion Date. <br /> Progress estimates made during progress of the Work are tentative, and made only for <br /> the purpose of determining progress payment. The progress estimates are subject to <br /> change at any time prior to the calculation of the Final Payment. <br /> The value of the progress estimate will be the sum of the following: <br /> 1. Unit Price Items in the Proposal Form —the approximate quantity of <br /> acceptable units of work completed multiplied by the unit price. <br /> 2. Lump Sum Items in the Proposal Form —the estimated percentage complete <br /> multiplied by the Proposal Forms amount for each Lump Sum Item, or per the <br /> schedule of values for that item. <br /> 3. Materials on Hand — 100 percent of invoiced cost of material delivered to Job <br /> site or other storage area approved by the Engineer. <br /> 4. Change Orders— entitlement for approved extra cost or completed extra <br /> work as determined by the Engineer. <br /> Progress payments will be made in accordance with the progress estimate less: <br /> 1. Retainage in accordance with 1-09.9(6) RETAINAGE, <br /> 2. The amount of Progress Payments previously made, and <br /> 3. Funds withheld by the City for disbursement in accordance with the Contract <br /> Documents. <br /> Progress payments for Work performed shall not be evidence of acceptable <br /> performance or an admission by the City that any Work has been satisfactorily <br /> completed. <br /> Payments will be made by warrants, issued by the City's fiscal officer, against the <br /> appropriate fund source for the Project. Payments received on account of Work <br /> performed by a Subcontractor are subject to the provisions of RCW 39.04.250. <br /> Contractor's submission of a progress pay estimate constitutes the Contractor's <br /> material representation that Contractor performed all of the Work described in the <br /> progress pay estimate during the relevant time period in a conformance with these <br /> Plans and Specifications and that the materials or Equipment for which payment is <br /> Alverson Stormwater Separation February,2019 <br /> WO No—UP3660 Division 1 —GENERAL REQUIREMENTS <br /> SP- 112 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.