My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction 4/29/2019
>
Contracts
>
Capital Contract
>
Rodarte Construction 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 10:36:46 AM
Creation date
5/2/2019 10:35:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction
Approval Date
4/29/2019
Council Approval Date
4/10/2019
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Alverson Stormwater Separation
Public Works WO Number
UP3660
Tracking Number
0001736
Total Compensation
$1,460,182.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERE T T SPECIAL PROVISIONS <br /> each piece of equipment exceed the rates established by the <br /> ' Equipment Rental Agreement even if the actual cost for such <br /> equipment is higher. The City may audit the Contractor's cost <br /> records to determine actual equipment cost. The following <br /> ' information shall be provided for each piece of equipment: <br /> i. Detailed description (e.g., Motor Grader Diesel <br /> Powered Caterpillar 12 "G", Tractor Crawler ROPS & <br /> Dozer Included Diesel, etc.) <br /> ii. The hours of use or standby; and <br /> iii. The specific day and dates of use or standby; <br /> iv. Job overhead. <br /> v. Overhead (general and administrative). <br /> vi. Subcontractor's Contract Claims (in the same level of <br /> detail as specified herein is required for any <br /> subcontractor's Contract Claims); and <br /> vii. Other categories as specified by the Contractor or the <br /> City. <br /> ' 10. A notarized statement shall be submitted to the City's Representative <br /> containing the following language: <br /> Under the penalty of law for perjury or falsification, the undersigned, <br /> (name) (title) <br /> of <br /> ' (company) <br /> hereby certifies that the Contract Claim for extra compensation and <br /> extension of Contract Time, if any, made herein for Work on this <br /> Contract is a true and complete statement of the factual basis of the <br /> Contract Claim and all actual costs incurred and time sought. and is <br /> fully documented and supported under the Contract between the <br /> parties. <br /> Date /s/ <br /> Subscribed and sworn before me this day of <br /> Notary Public <br /> My Commission Expires: <br /> ' 1-09.11(2)C False Or Omitted Information <br /> The Contractor waives each Contract Claim for which it presents material <br /> information that it knows, or in the exercise of reasonable care should know; is <br /> false, or omits or fails to disclose material information relating to such Contract <br /> i Claim. In such case; Contractor shall reimburse the City for any and all fees and <br /> expenses incurred in investigating any such Contract Claim. <br /> 1 <br /> ' Alverson Stormwater Separation February, 2019 <br /> WO No-UP3660 Division 1 -GENERAL REQUIREMENTS <br /> SP-119 <br />
The URL can be used to link to this page
Your browser does not support the video tag.