Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> or with use of completed Work by the City shall be paid by the Contractor. The Contractor <br /> ' and its sureties shall protect and hold the City, and City's Representative, together with its <br /> officers, agents, and employees, harmless from any and all loss, defense cost, and <br /> expenses and against any and all demands made for such fees or claims brought or made <br /> by the holder of any invention or patent. Before final payment is made on the account of <br /> this Contract, the Contractor shall, if requested by the Owner, furnish acceptable proof of a <br /> proper release from all such fees or claims. <br /> UI-ID TEMPORARY TRAFFIC CONTROL <br /> 1-10.1 General <br /> 1-10.1(2) Description <br /> ' Supplement 1-10.1(2) as follows: <br /> Provide a uniformed off-duty Police Officer to control traffic for work at signalized <br /> intersections and other critical situations as determined by the Engineer. <br /> ' 1-10.2 Traffic Control Management <br /> 1-10.2(1) General <br /> ' Delete the first sentence of the third paragraph of 1-10.2(1) and substitute the <br /> following: <br /> The primary and alternate TCS shall be certified as worksite traffic control <br /> supervisors by one of the organizations listed below: <br /> ' • Evergreen Safety Council (800) 521-0778 <br /> • Northwest Laborers Union (800) 240-9112 <br /> • American Traffic Safety Services Association (877) 642-4637 <br /> 1-10.2(2) Traffic Control Plans <br /> Delete the first paragraph of 1-10.2(2) and substitute the following: <br /> Contractor may use City's Standard Traffic Control Plans included in COE <br /> Standard Drawings, Series 700. The City does not represent or warrant that the <br /> Standard Plans are sufficient, adequate or complete for the Contractor's means, <br /> ' methods or plan of Work. If a new or additional Traffic Control Plan is necessary, <br /> prepare detailed Traffic Control Plan complying with COE Standard Drawings, <br /> Series 700, the MUTCD, Part 6, and the most current edition of the PROWAG <br /> (Public Rights-of-Way Accessibility Guidelines). Plan preparation shall be at <br /> ' Contractor's sole cost and submitted to the City for approval at least 14 calendar <br /> days before starting Work. Work may not begin until Contractor is in receipt of <br /> City approved Traffic Control Plan. <br /> 1-10.3 Traffic Control Labor, Procedures and Devices <br /> Delete 1-10.3 and substitute the following: <br /> 111 1-10.3 Flagging, Signs, and All Other Traffic Control Devices <br /> 1-10.3(1) General <br /> The Contractor shall provide all flaggers, signs and other traffic control devices. The <br /> Contractor shall erect and maintain all construction signs, warning signs, detour signs, <br /> and other traffic control devices necessary to warn and protect the public at all times <br /> from injury or damage as a result of the Contractor's operations that may occur on <br /> highways. roads, or streets. No Work shall be done on or adjacent to the roadway until <br /> all necessary signs and traffic control devices are in place. <br /> Alverson Stormwater Separation February, 2019 <br /> WO No—UP3660 Division 1 —GENERAL REQUIREMENTS <br /> SP-127 <br />