Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS , <br /> be paid under the item "Maintenance and Protection of Traffic Control." The Contractor <br /> shall erect them on posts or supports and maintain them in a clean, neat, and <br /> presentable condition until the necessity for them has ceased. All non-applicable signs <br /> shall be removed or covered with either metal or plywood during periods when they are <br /> not needed. When the need for any of these signs has ceased, the Contractor, upon <br /> approval of the Engineer, shall take down these signs, posts, or supports. All signs, <br /> posts, and supports shall be removed from the project and shall remain the property of <br /> the Contractor. <br /> There shall be no separate classification of signs. All construction signs, whether used <br /> throughout the construction, during a major phase of construction or removed daily <br /> shall be paid under the item "Maintenance and Protection of Traffic Control." Portable <br /> or temporary mountings may require added weight for stability. If it is necessary to add <br /> weight to the signs, only a bag of sand that will rupture on impact shall be used. The <br /> bag of sand shall have a maximum weight of 40 pounds and shall be suspended no <br /> more than 1-foot from the ground. <br /> The Work to provide the construction signing shall be: <br /> 1. Furnishing all construction signs. <br /> 2. Furnishing, removing, and disposing of the posts or supports for the signs. <br /> 3. Initial installation and subsequent removal of all construction signs. <br /> 4. Furnishing labor and materials for maintaining the signs in a clean and <br /> presentable condition; <br /> 5. All other incidentals necessary for providing the construction signs according <br /> to the approved traffic control plan(s). <br /> Signs, posts. or supports that are lost, stolen, destroyed, or which the Engineer deems <br /> to be unacceptable, while their use is required on the project, shall be replaced by the <br /> Contractor without additional compensation. <br /> 1-10.4 Measurement 111 <br /> Delete 1-10.4 and substitute the following: <br /> 1-10.4 Measurement <br /> 1-10.4(1) General <br /> (******) <br /> When the Bid Proposal does not include an item for any necessary traffic control, all <br /> costs for traffic control shall be included, by the Contractor, in the unit contract price for <br /> the various other items of Work in the Bid Proposal. The Contractor shall estimate <br /> these costs based on the contemplated work procedures. <br /> When traffic control items are included in the Bid Proposal, payment is limited to the <br /> following areas: <br /> The entire project area under the Contract and for a distance to include the initial <br /> warning signs for the beginning of the Project and the end of construction. Warning <br /> signs for side roads on the approved traffic control plan are also included. If the <br /> project consists of two or more sections. the limits will apply to each section <br /> individually. <br /> A detour provided in the Plans or approved by the Engineer for by-passing all or any <br /> portion of the construction, irrespective of whether or not the termini of the detour are <br /> within the limits of the Contract. <br /> Alverson Stormwater Separation February, 2019 <br /> WO No—UP3660 Division 1 —GENERAL REQUIREMENTS <br /> SP-130 <br />