My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction 4/29/2019
>
Contracts
>
Capital Contract
>
Rodarte Construction 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 10:36:46 AM
Creation date
5/2/2019 10:35:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction
Approval Date
4/29/2019
Council Approval Date
4/10/2019
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Alverson Stormwater Separation
Public Works WO Number
UP3660
Tracking Number
0001736
Total Compensation
$1,460,182.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 1 <br /> Plug existing connecting pipes that remain in accordance with 2-02.3(5) of <br /> these Special Provisions. Backfill shall be Gravel Borrow as specified in 9- <br /> 03.14(1). Compact backfill to a minimum of 95 percent maximum density in <br /> accordance with 2-03.3(14)D. <br /> ' 2-02.3(3)F Removal of existing pipe <br /> Where shown on the plans, excavate and remove the existing pipe as <br /> needed for installation of new improvements. <br /> Plug connections to structures and existing pipes that remain in accordance <br /> with 7-08.3(4) of these Special Provisions. Backfill shall be Gravel Borrow as <br /> specified in 9-03.14(1). Compact backfill to a minimum of 95 percent <br /> ' maximum density in accordance with 2-03.3(14)D. <br /> 2-02.3(4) Obliteration of Pavement Markings <br /> (******) <br /> ' Remove pavement markings where shown on the Plans or where designated by <br /> the Engineer. Obliterate pavement marking until blemishes caused by the <br /> pavement marking removal conform to the coloration of the adjacent pavement. <br /> If the pavement is materially damaged by pavement marking removal operation, <br /> Contractor shall repair the pavement damage, at the Contractor's expense, to a <br /> condition equal to existing pavement that had no markings obliterated. Remove <br /> ' sand or other material deposited on the pavement as a result of removing stripes <br /> and markings as the Work progresses to avoid hazardous conditions. <br /> Accumulation of sand or other material that might interfere with drainage will not <br /> be permitted. <br /> 2-02.3(5) Abandon Pipe In-place <br /> (******) <br /> Where designated on the plans, pipes to be abandoned shall be plugged in <br /> ' accordance with 7-08.3(4) of these Special Provisions. Where in conflict with new <br /> work, abandoned pipes shall be removed and disposed of as necessary to install <br /> the new work and the existing pipe remains shall be plugged. If designated on <br /> Plans, completely fill abandoned in-place pipe with Controlled Density Fill as <br /> specified in 2-09.3(1)E. <br /> 2-02.3(6) Sawing and Line Drilling <br /> (******) <br /> Saw-cut to full depth mortared decorative or special pavement including, but not <br /> limited to, brick, cobblestone or paver block along a neat line with intent of <br /> ' salvaging as many units as possible. <br /> When line drilling, drill holes at maximum center-to-center spacing of six-inches. <br /> Drill holes perpendicular to the surface and penetrate completely through the <br /> ' pavement. <br /> When the Plans indicate, or the Engineer requires, saw-cutting pavement that is <br /> comprised of a rigid base and asphalt overlay, saw cut the rigid base to the <br /> ' minimum depth as follows: <br /> a. For concrete rigid base, saw cut to a depth of 2/3 the thickness of the rigid <br /> base. <br /> b. For rigid base constructed with mortared decorative or special pavement <br /> including, but not limited to, brick, cobblestone. or paver block, or a <br /> combination of such materials saw cut to full depth of the rigid base along a <br /> neat line with intent to salvage as many special pavement units as possible. <br /> ' Alverson Stormwater Separation Division 2—EARTHWORK February, 2019 <br /> WO No. -UP3660 SP—135 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.