My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction 4/29/2019
>
Contracts
>
Capital Contract
>
Rodarte Construction 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 10:36:46 AM
Creation date
5/2/2019 10:35:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction
Approval Date
4/29/2019
Council Approval Date
4/10/2019
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Alverson Stormwater Separation
Public Works WO Number
UP3660
Tracking Number
0001736
Total Compensation
$1,460,182.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> DIVISION 4 - BASES <br /> 4-04 BALLAST AND CRUSHED SURFACING <br /> 4-04.1 Description <br /> ' Delete the second paragraph of 4-04.1 and substitute the following: <br /> Work shall also consist of placing crushed surfacing stone as driveway maintenance <br /> material and in gravel driveway restoration as shown on the Plans or directed by the <br /> Engineer. The quantity shown in the Proposal is an estimate for the purpose of <br /> establishing a unit price only. Actual quantities will be measured as construction <br /> progresses. The Engineer may require that some or all of the crushed surfacing be <br /> removed because of contamination or to meet final grades. Removal shall be included <br /> with work for "Crushed Surfacing Top Course" or "Crushed Surfacing Base Course." <br /> 4-04.3 Construction Requirements <br /> ' Supplement 4-04.3 by adding the following: <br /> 4-04.3(12) Gravel Driveway Restoration <br /> ' Replace existing gravel driveways removed in order to allow construction of the new <br /> improvements as follows: <br /> Restore gravel driveways by placing a minimum of 3-inches of "Crushed Surfacing <br /> ' Base Course" on subgrade compacted to 95 percent standard density in accordance <br /> with 2-03.3(14)D. <br /> Preparation and compaction of the subgrade shall be included in "Crushed Surfacing <br /> ' Base Course" with no direct compensation made. <br /> 4-04.3(13) Gravel Driveway Maintenance <br /> (******) <br /> Maintain existing driveway access by providing and placing Crushed Surfacing Base <br /> Course as necessary and directed by Engineer to allow continued access until <br /> completion of final gravel drive restoration. <br /> 4-04.4 Measurement <br /> Delete 4-04.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> ' described in Division B - Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 4-04.5 Payment <br /> ' Delete all paragraphs in 4-04.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> ' as described in Division B - Bid item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> Add the following section: <br /> 4-06 ASPHALT TREATED BASE <br /> 4-06.3(0) General <br /> Do NOT construct the asphalt treated base course until all underground utilities are <br /> ' completed and inspected and approved by the Engineer. <br /> ' Alverson Stormwater Separation Division 4-BASES February, 2019 <br /> WO No.-UP3660 SP-143 <br />
The URL can be used to link to this page
Your browser does not support the video tag.