My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction 4/29/2019
>
Contracts
>
Capital Contract
>
Rodarte Construction 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 10:36:46 AM
Creation date
5/2/2019 10:35:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction
Approval Date
4/29/2019
Council Approval Date
4/10/2019
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Alverson Stormwater Separation
Public Works WO Number
UP3660
Tracking Number
0001736
Total Compensation
$1,460,182.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> TESC Plan to meet the Contractor's schedule and method of construction. <br /> The Contractor shall develop a schedule for implementation of the TESC <br /> work and incorporate it into the Contractor's progress schedule. <br /> At the request of the Engineer updated TESC Plans shall be prepared and <br /> provided to the City. <br /> 8-01.3(1)B Erosion and Sediment Control (ESC) Lead <br /> Revise the second and third paragraphs in 8-01.3(1)B to read as follows: <br /> The ESC Lead shall implement the TESC Plan. Implementation shall include, <br /> but is not limited to: <br /> 1. Installing and maintaining all temporary erosion and sediment <br /> control Best Management Practices (BMPs) included in the TESC <br /> Plan to assure continued performance of their intended function. <br /> Damaged or inadequate TESC BMP's shall be corrected <br /> immediately. <br /> 2. Updating the TESC Plan to reflect current field conditions. <br /> The ESC Lead shall also inspect all areas disturbed by construction activities, <br /> all on-site erosion and sediment control BMP's, and all stormwater discharge <br /> points at least once every calendar week and within 24-hours of runoff events111 <br /> in which stormwater discharges from the site. Inspections of temporarily <br /> stabilized, inactive sites may be reduced to once every calendar month. <br /> Delete ara ra h two of 8-01.3(1)A <br /> p g P <br /> 8-01.3(2) Seeding, Fertilizing, and Mulching <br /> 8-01.3(2)A Preparation For Application <br /> 8-01.3(2)A1 Seeding <br /> Revise the third sentence in the first paragraph in 8-01.3(2)A1 to read as follows: <br /> Cultivate seeding restoration areas no sooner than one week prior to seeding. <br /> Supplement 8-01.3(2)A1 by adding the following: <br /> All areas to be seeded shall be raked or similarly treated so as to provide a <br /> smooth, consistent, friable surface, acceptable for seeding as determined by <br /> the Engineer. <br /> All areas to be seeded shall be free of all visible clods, rocks and debris <br /> measuring one-inch or larger in any dimension. Any exposed tree roots in cut <br /> slopes shall be cut neatly and protected. <br /> 8-01.3(2)B Seeding and Fertilizing <br /> Supplement 8-01.3(2)B by adding the following: <br /> Provide topsoil testing and amendments in accordance with section 9-14.1(4) <br /> of the Special Provisions. I <br /> Use hydroseeding application method where feasible, uniformly apply a slurry <br /> of seed, fertilizer, mulch and water over all disturbed areas unless restoring <br /> with sod, or shown otherwise on the Plans. <br /> Use Seed Mix #1, as specified in 9-14.2 of these Special Provisions in <br /> restoring areas not having established lawns. Use Sod in accordance with 8- <br /> 02.3(16)A, for restoring areas with established lawns. <br /> Apply permanent seed mixture #1 uniformly over the areas being restored at <br /> a rate of 4-pounds per 1,000 square feet. <br /> Alverson Stormwater Separation Division 8—MISC CONSTRUCTION February, 2019 <br /> P Y, <br /> WO No. -UP3660 SP—164 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.