My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction 4/29/2019
>
Contracts
>
Capital Contract
>
Rodarte Construction 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 10:36:46 AM
Creation date
5/2/2019 10:35:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction
Approval Date
4/29/2019
Council Approval Date
4/10/2019
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Alverson Stormwater Separation
Public Works WO Number
UP3660
Tracking Number
0001736
Total Compensation
$1,460,182.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> ISUBCONTRACTORS FORM <br /> 1. For heating, ventilation, air conditioning,plumbing(as defined by RCW Chap. 18.106) and electrical <br /> work(as defined by RCW Chap. 19.28), Bidder MUST either identify itself or Subcontractors in the <br /> I chart below. If Bidder believes suchwork is not part of the scope of Work, Bidder shall write "NO <br /> WORK". <br /> 2. Bidder shall not list more than one Subcontractor for each category of work identified, unless <br /> I Subcontractors vary with bid alternates, in which case the Bidder must indicate which Subcontractor <br /> will be used for which alternate. <br /> 3. Bidder's bid shall be deemed nonresponsive and void if: <br /> I A. For heating, ventilation, air conditioning, plumbing and electrical work, Bidder fails (1) to <br /> submit as part of the Bid the names of such Subcontractors, (2)to name itself to perform such <br /> Work,or(3)to write"No Work"; or <br /> B. Bidder names two or more Subcontractors to perform the same work. <br /> I 4. The requirement to name the Bidder's proposed heating, ventilation and air conditioning, plumbing, <br /> and electrical subcontractors applies only to proposed heating, ventilation and air conditioning, <br /> plumbing, and electrical subcontractors who will contract directly with the general contractor <br /> I <br /> submitting the Bid to the City. <br /> Type/Scope of Work Name and Address of Subcontractor/Or Bidder <br /> HEATING <br /> I Subcontractor, bidder or"no work" MUST be <br /> stated N°'u <br /> I VENTILATION AND AIR CONDITIONING <br /> Subcontractor, bidder or"no work" MUST be Nva <br /> stated <br /> PLUMBING(as described in RCW Chap. 18.106) <br /> I <br /> Subcontractor, bidder or"no work"MUST be ��y <br /> stated <br /> ELECTRICAL (as described in RCW Chap. <br /> I 19.28) p l <br /> Subcontractor, bidder or "no work" MUST be /v <br /> stated <br /> I <br /> I <br /> I <br /> I <br /> I <br /> IAlverson Stormwater Separation Division P-PROPOSAL February 2019 <br /> Work Order No.-UP3660 SP-19 <br /> e 24 Subcontractors Form <br /> '` <br /> rovided.to BuildersExchange of WA, Inc.For usage Conditions Agreement see www.bxwa.com-Always Verify Scale`" <br />
The URL can be used to link to this page
Your browser does not support the video tag.