My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction 4/29/2019
>
Contracts
>
Capital Contract
>
Rodarte Construction 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 10:36:46 AM
Creation date
5/2/2019 10:35:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction
Approval Date
4/29/2019
Council Approval Date
4/10/2019
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Alverson Stormwater Separation
Public Works WO Number
UP3660
Tracking Number
0001736
Total Compensation
$1,460,182.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> ICITY OF EVERETT SPECIAL PROVISIONS <br /> INON-COLLUSION AFFIDAVIT <br /> ISTATE OF WASHINGTON ) NON-COLLUSION AFFIDAVIT <br /> )ss <br /> COUNTY OF SNOHOMISH ) <br /> \OS-Q (\ \ C (i-f. , being first duly sworn, on <br /> I his oath says that the Bid above submitted is a genuine and not a sham of collusive bid, or made in the <br /> interest or on behalf of any person not therein named; and he further says that the Bidder has not directly or <br /> indirectly induced or solicited any Bidder on the above Work or supplies to put in a sham bid, or any person <br /> or corporation to refrain from bidding; and that said Bidder has not in any manner sought by collusion to <br /> I <br /> secure an advantage over any other Bidder or Bidders. <br /> INOTICE TO ALL BIDDERS <br /> ITo report bid rigging activities call: <br /> 1-800-424-9071 <br /> I <br /> The U.S. Department of Transportation (USDOT) operates the above toll-free "hotline" Monday through <br /> Friday, 8:00 a.m. to 5:00 p.m., Eastern Time. Anyone with knowledge of possible bid rigging, bidder <br /> collusion, or other fraudulent activities should use the"hotline"to report such activities. <br /> I <br /> The"hotline" is part of USDOT's continuing effort to identify and investigate highway construction contract <br /> fraud and abuse and is operated under the direction of the USDOT Inspector General. All information will <br /> be treated confidentially and caller anonymity will be respected. <br /> I <br /> e •yjcu .f.e c oit tch or, i-n(.. <br /> I <br /> Signature CONTRACTOR NAME <br /> Subscribed and sworn to before this \`"1 ' day of \--nO,I(( � , 20 1 C1 . <br /> RO <br /> \‘'.0 <br /> �R 4q �, lI' <br /> .I :3 <br /> •Q. S10N Et�w,9�,- <br /> i— �1 4tJ�-� <br /> irict <br /> , � cle-kLQ <br /> aPublic in and .or the State of Washington <br /> l AUC ARY :z= residing at CA n9� A <br /> .A.,__,,,.. <br /> I1O ` <br /> 1p, W15 ` <br /> / 1 <br /> IAlverson Stormwater Separation Division P—PROPOSAL February 2019 <br /> Work Order No.—UP3660 SP—23 <br /> le 28 Non-Collusion Affidavit <br /> rovided to SuifdefeSichenge of WA, Inc."For usage Conditions Agreemenfsee www.bxwa.com-Always Verify Scale <br />
The URL can be used to link to this page
Your browser does not support the video tag.