My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction 4/29/2019
>
Contracts
>
Capital Contract
>
Rodarte Construction 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 10:36:46 AM
Creation date
5/2/2019 10:35:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction
Approval Date
4/29/2019
Council Approval Date
4/10/2019
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Alverson Stormwater Separation
Public Works WO Number
UP3660
Tracking Number
0001736
Total Compensation
$1,460,182.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> Working Drawings: Drawings, shop drawings, plans, diagrams, or calculations, <br /> including a schedule of submittal dates for Working Drawings where specified, which <br /> the Contractor must submit to the Engineer. (This definition replaces the definition in <br /> WSDOT 1-01.3 for Working Drawings.) <br /> Supplement Section 1-01.3 by adding the following: <br /> All references in the Standard Specifications to the terms "State", "Department of <br /> Transportation", "Washington State Transportation Commission", "Commission", <br /> ' "Secretary of Transportation", "Secretary", "Headquarters". and "State Treasurer" shall <br /> be revised to read "City." <br /> All references to the terms "State" or "state" shall be revised to read "City" unless the <br /> reference is to an administrative agency of the State of Washington, a State statute or <br /> regulation, or the context reasonably indicates otherwise. <br /> All references to "State Materials Laboratory" shall be revised to read "City designated <br /> ' location." <br /> Additive: A supplemental unit of work or group of bid items, identified separately in <br /> the Proposal, that may, at the discretion of the City, be awarded in addition to the base <br /> ' Bid. <br /> Alternative or Alternate: One of two or more units of Work or groups of bid items. <br /> identified separately in the Proposal, from which the City may make a choice between <br /> different methods or material of construction for performing the same Work. <br /> ' Award Date: The date of the formal action by the Everett City Council to accept the <br /> lowest responsible and responsive Bidder for the Work. <br /> Bid Opening Date: The date the Everett City Clerk publicly opens and reads the Bids. <br /> Business Day: A business day is any day from Monday through Friday except <br /> holidays as listed in 1-08.5. <br /> ' Change Order: Reference to Change Order shall include all rights of the City and <br /> Contractor under 1-04.4 CHANGES. Agreed Change Orders shall be in the form <br /> attached as Appendix C. Unilateral Change Orders shall be in the form attached as <br /> Appendix C. <br /> Contract Claim: Any request by the Contractor for additional time or money resulting <br /> in adjustment of Contract Sum or Contract Time irrespective of the cause or reason for <br /> the request. Contract Claims include, but are not limited to, requests by the Contractor <br /> ' for additional time or money due to Extra Work, inefficiencies, Delays, interferences, <br /> and problems with the design. Contract Claim includes, but is not limited to, claims or <br /> requests by Subcontractors for extensions of Contract Time, adjustment of Contract <br /> ' Sum, additional compensation that the Contractor attempts to pass through or assert <br /> against the City, or claims against the City arising out of a third party's claim against <br /> the Contractor. <br /> Contract Documents: See definition for"Contract." <br /> Contract Execution Date: The date the City of Everett officially binds the Contractor <br /> to the Contract. <br /> ' Contract Sum: The price in dollars stated in the Contract to be paid by the City to the <br /> Contractor for the Work described in the Contract Documents, as modified by Change <br /> Orders. <br /> Delay: Any increase in the duration of the critical path of the Project. <br /> Contract Time: The period of time established by the terms and conditions of the <br /> Contract within which the Work must be physically completed. <br /> ' Alverson Stormwater Separation February, 2019 <br /> WO No—UP3660 Division 1 —GENERAL REQUIREMENTS <br /> SP—39 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.