My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction 4/29/2019
>
Contracts
>
Capital Contract
>
Rodarte Construction 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 10:36:46 AM
Creation date
5/2/2019 10:35:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction
Approval Date
4/29/2019
Council Approval Date
4/10/2019
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Alverson Stormwater Separation
Public Works WO Number
UP3660
Tracking Number
0001736
Total Compensation
$1,460,182.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> their meaning, Bidder may submit to the Engineer a written request for an <br /> interpretation thereof. The Bidder submitting the request will be responsible for its <br /> prompt delivery. Any interpretation of the documents, if made, will be made only <br /> by addendum duly issued and a copy of such addendum will be mailed or <br /> delivered to each Bidder receiving a set of such documents. All requests for <br /> interpretations must be received by the City or Engineer no later than 7 <br /> calendar days prior to the Proposal opening date. All questions regarding the <br /> Contract Documents shall be referred to the City or Engineer at the address <br /> provided in the Contract Documents. <br /> 1-02.4(1)B Prevailing Wages <br /> (******) <br /> Bidder is directed to 1-07.9(1) of these Special Provisions for requirements <br /> regarding applying payment of prevailing wage rates for employment of labor on <br /> within Snohomish County. <br /> 1-02.4(2) Subsurface Information <br /> Delete the first paragraph and substitute the following: <br /> If the City has made subsurface investigation of the site of the proposed Work, the <br /> boring log data and soil sample test data accumulated by the City will be made <br /> available for inspection by the Bidders. The boring logs and soil sample test data <br /> shall NOT be considered as part of the Contract. In addition, the City makes no <br /> representation or warranty expressed or implied that: <br /> 1. The Bidders' interpretations from the boring logs are correct, <br /> 2. Moisture conditions and indicated water tables will not vary from those <br /> found at the time the borings were made, and <br /> 3. The ground at the location of the borings has not been physically <br /> disturbed or altered after the boring was made. <br /> Supplement 1-02.4(2) by adding the following: <br /> The boring log data and soil sample data, if any, can be found in Appendix A. <br /> Bidder may contact City of Everett Project Manager to arrange to view the <br /> geotechnical report. <br /> 1-02.5 Proposal Form <br /> Delete this section and substitute the following: <br /> The Proposal Form identifies the project and its location and describes the work. It also <br /> lists estimated quantities, units of measurement, the items of work, and the materials <br /> to be furnished at the unit bid prices. The Bidder shall complete spaces on the <br /> proposal form that call for, and are not limited to, unit prices; extensions; summations; <br /> the total bid amount; signatures; date; and, where applicable, retail sales taxes and <br /> acknowledgment of addenda; the bidder's name, address, telephone number, and <br /> signature; the bidder's UDBE/DBE/M/WBE commitment, if applicable; a State of <br /> Washington Contractor's Registration Number; and a Business License Number, if <br /> applicable. Bids shall be completed by typing or shall be printed in ink by hand, <br /> preferably in black ink. The required certifications are included as part of the Proposal <br /> Form. <br /> Bidder shall submit Bidder's Proposal on the Proposal Form provided in the Contract , <br /> Documents. <br /> Alverson Stormwater Separation February, 2019 <br /> WO No—UP3660 Division 1 —GENERAL REQUIREMENTS <br /> SP—44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.