My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction 4/29/2019
>
Contracts
>
Capital Contract
>
Rodarte Construction 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 10:36:46 AM
Creation date
5/2/2019 10:35:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction
Approval Date
4/29/2019
Council Approval Date
4/10/2019
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Alverson Stormwater Separation
Public Works WO Number
UP3660
Tracking Number
0001736
Total Compensation
$1,460,182.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERE T T SPECIAL PROVISIONS <br /> used in the preparation of the Proposal, requesting relief from the responsibilities of <br /> Award. The affidavit shall describe the specific error(s) and certify that the work sheets <br /> are the originals used in the preparation of the Proposal. The Engineer will review the <br /> certified work sheets to determine the validity of the claimed error and make <br /> recommendation to the City. If the City concurs in the claim of error, the Bidder will be <br /> relieved of responsibility, and the bid deposit of the Bidder will be returned. Thereafter, <br /> at the discretion of the City, all Bids may be rejected or Award made to next lowest and <br /> responsive Bidder. <br /> Supplement 1-03.1 by adding the following: <br /> 1-03.1(2) Preference for Resident Contractors <br /> (******) <br /> ' In accordance with RCW 39.04.380, if a Bid is received from a nonresident contractor <br /> from a state that provides a percentage bidding preference and does not have an <br /> office located in Washington, then a comparable percentage disadvantage will be <br /> ' applied to the Bid of that nonresident contractor. <br /> 1-03.2 Award of Contract <br /> ' Revise 1-03.2 to read as follows: <br /> Within 45 days after the opening of Bids, the City will act either to accept the Bid from <br /> the lowest responsive, responsible Bidder, or to reject all Bids. The City reserves the <br /> right to request extensions of such Bid acceptance period. If the lowest responsible <br /> Bidder and the City cannot agree on an extension by the 45 day deadline, the City <br /> reserves the right to award the Contract to the next lowest responsible Bidder or reject <br /> all Bids. <br /> The acceptance of a Bid will be evidenced by a written Notice of Award of Contract <br /> delivered in person or by certified mail to the Bidder whose Bid is accepted, together <br /> with a request to furnish a Contract Bond and evidence of insurance and to execute <br /> ' the Contract set forth in the Contract Documents. <br /> 1-03.3 Execution of Contract <br /> Revise the first paragraph of 1-03.3 to read as follows: <br /> ' Successful Bidder has 14 calendar days after receiving the Notice of Award to submit <br /> the following documents to the City: <br /> ' • Two executed copies of the Contract. <br /> • Two original payment bonds and two original performance bonds submitted on <br /> forms contained in Contract Documents. <br /> • Certificate of Insurance and additional insured endorsement in accordance with <br /> 1-07.18 "Insurance" of the Special Provisions. <br /> Revise the third paragraph of 1-03.3 to read as follows: <br /> If the Bidder experiences circumstances beyond their control that prevents return of <br /> ' the Contract Documents within 14-calendar days after the Award Date, the City may <br /> grant more time for return of the documents, provided the City deems the <br /> circumstances warrant it. <br /> Supplement 1-03.3 by adding the following: <br /> A Contract shall not be formed until the Contract Documents are signed by the Mayor. <br /> 1-03.4 Contract Bond <br /> Revise 1-03.4 to read as follows: <br /> ' Alverson Stormwater Separation February, 2019 <br /> WO No—UP3660 Division 1 —GENERAL REQUIREMENTS <br /> SP-49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.