r <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 7-05.1 Working drawings for Type 2 catch basins, materials and <br /> Standard Plans <br /> 7-05.2 Materials-Catalog Cuts or Standard Plans, <br /> 7-18 Side Sewers <br /> 7-18.2 Materials-Catalog Cuts or Standard Plans ' <br /> DIVISION 8 MISCELLANEOUS CONSTRUCTION <br /> 8-01.3 Erosion Control <br /> 8-01.31(A) TESC Plan <br /> 8-13 Monument Cases <br /> 8-13.2 Materials-Standard Plans <br /> Deviations from Standard Plans will be subject to a Working Drawing submitted by the <br /> Contractor and approved by the Engineer. Where a Working Drawing is required by <br /> the Specifications, related Work performed prior to completion of the Engineer's review <br /> of the pertinent submission will be the sole expense and responsibility of the <br /> Contractor. <br /> Supplement 1-05.3 by adding the following: <br /> 1-05.3(1) Submittals <br /> (******) <br /> Where required by the Contract Documents, the Contractor shall submit information. <br /> such as Working Drawings that will enable the City's Representative to advise the City <br /> whether the Contractor's proposed materials, Equipment or methods of work are in <br /> general conformance to the design concept and in compliance with the Plans and <br /> Specifications. Approval or acceptance of a Submittal does not relieve Contractor from <br /> complying with Contract requirements. The City's approval of a Submittal does not <br /> constitute a waiver of the Contract requirements. The City will not be obligated to <br /> accept or pay for Work performed by the Contractor that may be affected by materials, , <br /> Equipment. or methods of work not submitted in a timely manner so that final review <br /> can be accomplished before the affected Work is complete. The City shall not be <br /> responsible for Delays, inefficiencies, or any additional costs or expenses caused in <br /> whole or in part by Contractor's failure to submit required information in sufficient time <br /> for review, comment, and correction. Contractor's failure to submit required <br /> information in sufficient time for review, comment and correction shall be deemed a <br /> waiver of any and all Contract Claims for adjustment of Contract Sum or Contract Time <br /> arising out of, or related to, such a Submittal. Contractor acknowledges and agrees <br /> that it may not rely upon receiving the City's response to a Submittal in less than 14 <br /> calendar days, unless the City explicitly changes this section by a signed Change <br /> Order. <br /> 1-05.3(2) Requests for Information <br /> Requests for information or clarification from the Contractor to the City shall be treated <br /> as a Submittal pursuant to 1-05.3(1) SUBMITTALS. <br /> 1-05.4 Conformity With and Deviations From Plans and Stakes ' <br /> Delete all of 1-05.4 and substitute the following: <br /> The Contractor shall be responsible for setting and maintaining all alignment stakes, <br /> slope stakes, and grades necessary for the construction of the roadbed. surfacing, <br /> paving, channelization, illumination, signing. bridges, and retaining walls, if such <br /> construction is included in this Project. Except for the survey control data to be <br /> Alverson Stormwater Separation February, 2019 <br /> WO No—UP3660 Division 1 —GENERAL REQUIREMENTS <br /> SP-60 <br />