My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction 4/29/2019
>
Contracts
>
Capital Contract
>
Rodarte Construction 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 10:36:46 AM
Creation date
5/2/2019 10:35:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction
Approval Date
4/29/2019
Council Approval Date
4/10/2019
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Alverson Stormwater Separation
Public Works WO Number
UP3660
Tracking Number
0001736
Total Compensation
$1,460,182.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> No adjustment in Contract Time or Contract Sum will be allowed because of the Delay <br /> in the performance of the Work attributable to the exercise of the City's rights provided <br /> by this section. <br /> The rights exercised under the provisions of this section shall not diminish the City's <br /> right to pursue any other avenue for additional remedy or damages with respect to the <br /> Contractor's failure to perform the Work as required. <br /> 1-05.10 Guarantees <br /> Supplement 1-05.10 by adding the following: ' <br /> The Contractor further warrants to the City, the Engineer and the City's Representative <br /> that all materials and Equipment furnished under this Contract will be of highest quality <br /> and new unless otherwise specified by the City, free from faults and defects and in <br /> conformance with the Contract Documents. All Work not so conforming to these <br /> standards shall be considered defective. If required by the City's Representative, the <br /> Contractor shall furnish satisfactory evidence as to the kind and quality of materials <br /> and Equipment. <br /> The Work furnished shall be of first quality and the workmanship shall be the best <br /> obtainable in the various trades. The Work shall be of safe, substantial and durable <br /> construction in all respects. For a period of 365 calendar days, commencing on the <br /> date of Final Acceptance, the Contractor shall, upon the receipt of Notice in writing <br /> from the City, promptly make all repairs arising out of defective materials, <br /> workmanship, or Equipment at no cost to the City. The City is hereby authorized to <br /> make such repairs if, 14 calendar days after giving of such Notice to the Contractor, <br /> the Contractor has failed to make or undertake the repairs with due diligence. In case <br /> of an emergency where, in the opinion of the City, delay could cause serious loss or <br /> damage, repairs may be made prior to or concurrent with Notice being sent to the <br /> Contractor. All expenses in connection with such repairs will be charged to the <br /> Contractor. <br /> "Acceptance of the Work" shall not extinguish any covenant or agreement on the part <br /> of the Contractor to be performed or fulfilled under this Contract that has not, in fact, <br /> been performed or fulfilled at the time of such acceptance. All covenants and <br /> agreements shall continue to be binding on the Contractor until they have been <br /> fulfilled. <br /> The City and the Contractor agree that the guarantee on the completed portions of the <br /> Work possessed and used by the City shall commence as to those portions on the <br /> date that the City takes possession of those portions and so notifies the Contractor in <br /> writing. City and Contractor further agree that such taking possession and use shall <br /> not be deemed as acceptance of the Work. Takeover of completed portions of the <br /> Work shall be at the City's option and will not be made until the Work can be put into <br /> routine service on a permanent basis. <br /> The guarantee provided herein shall be in addition to those specific guarantee or <br /> warranty requirements for particular Equipment or Work items, or both. as indicated in <br /> the Specifications and Special Provisions. <br /> 1-05.11 Final Inspection <br /> Delete 1-05.11 and substitute the following: <br /> 1 <br /> Alverson Stormwater Separation February, 2019 <br /> WO No—UP3660 Division 1 —GENERAL REQUIREMENTS <br /> SP—64 <br />
The URL can be used to link to this page
Your browser does not support the video tag.