Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-05.16 Water and Power <br /> 1 <br /> The Contractor shall make necessary arrangements, and shall bear the costs for power <br /> and water necessary for the performance of the Work, unless the Contract includes power <br /> and water as a pay item. <br /> Contractor shall pay all power and water costs until Substantial Completion, whether such <br /> power or water is provided by temporary or permanent facilities. City shall not be liable for <br /> any costs or Delays arising out of or caused by the availability or lack of availability of <br /> permanent power or utilities. <br /> 1-05.17 Oral Agreements <br /> 1 <br /> No oral agreement or conversation with any officer, agent, or employee of the City, either <br /> before or after execution of the Contract, shall affect or modify any of the terms or <br /> obligations contained in any of the documents comprising the Contract. Such oral <br /> agreement or conversation shall be considered as unofficial information and in no way <br /> binding upon the City, unless subsequently put in writing and signed by the City. <br /> 1-05.18 Contractor <br /> 1-05.18(1) Contractor's Representative <br /> The Contractor shall notify the Owner in writing of the name of the person who will act , <br /> as the Contractor's representative, will have the authority to act in matter relating to <br /> this Contract, and will be delegated with authority to act as the Contractor's emergency <br /> contact. This person shall have authority to carry out the provisions of the Contract <br /> and to supply materials, Equipment, tools and labor without delay for the performance <br /> of the Work. <br /> Contractor shall employ and keep on site on a full time basis personnel experienced in <br /> the management of construction of projects of this size and type. These shall include, <br /> but not be limited to, a project manager and superintendent. Neither the Contractor's <br /> project manager nor the superintendent shall have supervisory responsibility for other <br /> projects for the Contractor while assigned to this Project. Contractor shall employ and <br /> assign such additional, full time office, support and engineering personnel to support <br /> the project manager and superintendent and allow timely completion of the Project. <br /> The project manager and superintendent shall be approved by the City, and such <br /> approval shall not be unreasonably withheld. Contractor shall submit personnel <br /> qualifications within seven (7) days of Contractor's execution of the Contract. Basis for <br /> disapproval include, but are not limited to, lack of sufficient experience managing the <br /> construction of similar type or size projects or relationships on other projects <br /> unsatisfactory to the City or, if the Project is subject to supplemental bidder <br /> responsibility criteria and such criteria contain personnel qualifications, the personnel <br /> differ from those named by Bidder in its pre-Award supplemental bidder responsibility <br /> criteria submittals. City may require removal and replacement of Contractor's <br /> supervisory staff who are disruptive or who appear to lack sufficient competence to <br /> complete the Project successfully. ' <br /> 1-05.18(2) Construction Procedures <br /> The Contractor shall supervise and direct the Work and determine the means, <br /> methods. techniques, sequences and procedures of construction, except in those <br /> instances where the City, to define the quality of an item of Work, specifies in the <br /> Contract a means, method. technique. sequence or procedure for construction of that <br /> Alverson Stormwater Separation February, 2019 <br /> WO No—UP3660 Division 1 —GENERAL REQUIREMENTS <br /> SP-68 <br />