Rodarte Construction 4/29/2019
>
Contracts
>
Capital Contract
>
Rodarte Construction 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 10:36:46 AM
Creation date
5/2/2019 10:35:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction
Approval Date
4/29/2019
Council Approval Date
4/10/2019
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Alverson Stormwater Separation
Public Works WO Number
UP3660
Tracking Number
0001736
Total Compensation
$1,460,182.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> ' CITY OF EVERETT SPECIAL PROVISIONS <br /> on the project site before the Contractor has established and made known procedures <br /> for removal of injured persons to a hospital or a doctor's care. <br /> The Contractor shall have sole responsibility for the safety, efficiency, and adequacy of <br /> the Contractor's plant, appliances, and methods, and for any damage or injury <br /> resulting from their failure, or improper maintenance, use, or operation. The <br /> Contractor shall be solely and completely responsible for the conditions of the project <br /> site, including safety for all persons and property in the performance of the Work. This <br /> requirement shall apply continuously, and not be limited to normal working hours. The <br /> required or implied duty of the Engineer to conduct construction review of the <br /> Contractor's performance does not, and shall not, be intended to include review and <br /> adequacy of the Contractor's safety measures in, on, or near the project site. <br /> Supplement 1-07.1 by adding the following: <br /> 1-07.1(1) Noise <br /> Work within 500 feet of residential properties between the hours of 10:00 p.m. and <br /> 7:00 a.m. during weekdays and between the hours of 6:00 p.m. and 8:00 a.m. on <br /> weekends or holidays are subject to noise control requirements if the work generates <br /> decibel levels of greater than 55 db(A). Apply for a Noise Variance a minimum of 30 <br /> days prior to performing work and pay $100.00 application fee. Use the following link <br /> to obtain the latest information on noise variance requirements <br /> https://www.everettwa.gov/1547/Temporary-Noise-Variance-Requests. Typical <br /> requirements include, and not limited to, broadband backup alarms on all equipment <br /> requiring a backup alarm, anti-tail gate slamming devices, dump truck bed liners, and <br /> sawcutting, vacuum excavation, pavement breaking and loading export haul noise <br /> must be done between the hours of 7:00 a.m. and 10:00 p.m. during weekdays and <br /> between 8:00 a.m and 6:00 p.m. on weekends. Appendix E contains the City of <br /> Everett's Noise Ordinance for Bidder's reference. <br /> Approval to continue Work during these hours may be revoked at any time the <br /> Contractor exceeds the City's noise control regulations or complaints are received from <br /> the public or adjoining property owners regarding the noise from the Contractor's <br /> operation. The Contractor shall have no claim for damages or delays should such <br /> permission be revoked for these reasons. <br /> 1-07.2 State Taxes <br /> Delete 1-07.2 and substitute the following: <br /> 1-07.2 State Sales Tax <br /> The Washington State Department of Revenue has issued special rules on the State <br /> sales tax. Sections 1-07.2(1) through 1-07.2(3) are meant to clarify those rules. The <br /> Contractor should contact the Washington State Department of Revenue for answers <br /> to questions in this area. The City will not adjust its payment if the Contractor bases a <br /> Bid on a misunderstood tax liability. <br /> The Contractor shall include all Contractor-paid taxes in the unit bid prices or other <br /> contract amounts. In some cases, however, state retail sales tax will not be included. <br /> Section 1-07.2(3) describes this exception. <br /> The City will pay the retained percentage only if the Contractor has obtained from the <br /> Washington State Department of Revenue a certificate showing that all Contract- <br /> related taxes have been paid (RCW 60.28.050). The City may deduct from its <br /> payments to the Contractor any amount the Contractor may owe the Washington State <br /> Department of Revenue, whether the amount owed relates to this Contract or not. Any <br /> amount so deducted will be paid into the proper State fund. <br /> Alverson Stormwater Separation February, 2019 <br /> WO No-UP3660 Division 1 -GENERAL REQUIREMENTS <br /> SP-75 <br />
The URL can be used to link to this page
Your browser does not support the video tag.