Laserfiche WebLink
State of Washington Department of Ecology Page 2 of 10 <br /> CITY OF EVERETT <br /> Everett Landfill Tire Fire Project <br /> Agreement No.TCPRA-2015-EverPW-00012 <br /> Amendment No.2 <br /> Funding Type: Grant <br /> Funding Effective Date: 01/01/2015 Funding Expiration Date: 06/30/2021 <br /> Funding Source: <br /> Title: Local Toxics Control Act(LTCA) <br /> Type: State <br /> Funding Source%: 100% <br /> Description: Remedial action grants and loans are provided to local governments in Washington <br /> State to facilitate the cleanup of publicly owned lands contaminated with hazardous <br /> substances.Grants or Loans offered include those for initial investigations,site hazard <br /> assessments,independent cleanups,cleanups conducted under order or consent decree, <br /> safe drinking water actions,areawide groundwater investigations,and integrated <br /> planning activities.The remedial action grant and loan program was created by the <br /> Model Toxics Control Act(MTCA),Chapter 70.105D RCW.MTCA directed Ecology <br /> to adopt rules for grant and loan issuance and performance.Those rules are in Chapter <br /> 173-322A WAC,Remedial Action Grants and Loans. Funds for remedial action grants <br /> and loans come from a tax on hazardous substances.MTCA directs 44%of the tax <br /> revenue into the Local Toxics Control Account(LTCA).Each biennium,the <br /> Legislature appropriates a portion of the funds in LTCA for remedial action grants and <br /> loans. <br /> Approved Indirect Costs Rate: Approved Rate Negotiated Between ECOLOGY and RECIPIENT: 25% <br /> Recipient Match%: 50% <br /> InKind Interlocal Allowed: No <br /> InKind Other Allowed: No <br /> Is this Funding Distribution used to match a federal grant? No <br /> Everett Landfill Tire Fire-Oversight Task Total <br /> OPERATIONS &MAINT OF LANDFILL GAS S 0.00 <br /> SYSTEM J007 <br /> GRANT AND PROJECT ADMINISTRATION J008 $ 4,309.38 <br /> ENGINEERING DESIGN OF ENVIRONMENTAL $ 571,217.65 <br /> CONTROLS J005 <br /> FS-SAMPLING AND ANALYSIS PLAN $ 50,980.97 <br /> REVISIONS J004 <br /> Total: $ 626,508.00 <br /> CHANGES TO SCOPE OF WORK <br /> Task Number: 1 Task Cost: $50,980.97 <br /> Version 10/30/2015 <br />