Laserfiche WebLink
INSPECTION REPORT 7 <br />Dale S-2-6 -C)� Permit: 308 )TC0 / <br />4 <br />Site APress: <br />Contractor: <br />Owner: <br />3-1(_--W P-4 <br />TYPE OF INSPECTION REQUESTED <br />ELECTRICAL <br />BUILDING MECHANICAL PLUMBING <br />❑Temp Service <br />❑LIFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br />❑ Groundwork <br />❑ Footing ❑ Rough In ❑ Rough in <br />❑ SlabiConduil <br />❑ Foundation ❑ Ceiling Grid ❑ Coiling Grid <br />❑ Rough In <br />❑ Structural Slab ❑ OK to insulate ❑ OK to insulate <br />❑ Service <br />❑ Framing ❑ Rooltop Units ❑ Water Service <br />❑ Grounding <br />❑ Insulation ❑ Mechanical Final LI Medical Gas <br />❑ Ceiling Grid <br />❑ Drywall Nailing ❑ Plumbing Final <br />❑ Electrical Final <br />[:]Shear Nailing GAS PIPE <br />SITE WORK <br />❑ Flool Nailing ❑ Rough In/Service Hot Water Tank <br />❑ Footing drains <br />fling Grid ❑ Refrigeration ❑ Rough in <br />❑Roof drains <br />llding Final [1/Gas Pipe Final ❑HWT Final <br />YON.0 <br />OTHER CONSULT. <br />L PPROVAL <br />❑ "ARTIALAPPROVAL FINALAPPROVALTHIS PERMIT <br />Fj OK FOR T.C.O. <br />❑ CORRECTION REQUESTED <br />❑ OK FOR C.O. <br />❑ VIOLATION ❑ <br />LI UNABLE TO PERFORM INSPECTION. <br />[; CALL (425) 257.6881 FOR REINSPECTION - 24 hour notice required <br />// /�Inspector: ! t Date: , <br />