|
I
<br /> GENERAL NOTES GENERAL SYMBOLS
<br /> ABBREVIATIONS
<br /> . THE WORK SHALL CONFORM TO THE APPLICABLE BUILDING CODE 14. THE CONTRACTOR SHALL PERFORM DAILY CLEANING OF THE JOB 32. MINOR DETAILS NOT SHOWN OR SPECIFIED, BUT NECESSARY FOR
<br /> .� ,�, > ��,:a, �;�-- z,�.s,:.n..
<br /> AND OTHER ORDINANCES, CODES AND REGULATIONS LISTED ON SITE DURING THE CONSTRUCTION PERIOD AND SHALL PROTECT PROPER CONSTRUCTION OF ANY PART OF THE WORK, SHALL BE A G Q
<br /> THE DRAWINGS, AND REQUIRED BY LOCAL BUILDING AUTHORITIES. FINISHED WORK FROM DAMAGE. IMMEDIATELY PRIOR TO TENANT INCLUDED AS IF THEY WERE INDICATED IN THE DRAWINGS, UNLESS SHEET NUMBER BUILDING SECTION TAG A/C AIR CONDITIONING GL GLASS or GLAZING T U
<br /> ' A/C UNIT AIR CONDITIONING UNIT GRD GROUND q Q ARRY TILE
<br /> THE GOVERNING CODES, RULES AND REGULATIONS ARE OCCUPANCY,THE CONTRACTOR SHALL PERFORM FINAL CLEANING OTHERWISE AGREED UPON. WHERE THE CONTRACT, QTY QUANTITY
<br /> COLLECTIVELY REFERRED TO AS "THE CODE,"THE CONTRACTOR OF THE WORK AREA INCLUDING, BUT NOT LIMITED T0, WET WIPING CONSTRUCTION NOTES OR DRAWINGS CALL FOR ANY WORK OF A SECTION A/E ARCHITECT/ENGINEER GWB GYPSUM WALL BOARD
<br /> SHALL REPORT ANY INCONSISTENCIES, CONFLICTS OR OMISSIONS OF FURNITURE, AND CASEWORK, WASHING AND WAXING OF VCT MORE STRINGENT NATURE THAN THAT REQUIRED BY THE BUILDING � DESIGNATION A/V AUDIO VISUAL GYP GYPSUM R
<br /> DISCOVERED TO THE ARCHITECT FOR INTERPRETATION PRIOR TO FLOORING AND THE VACUMING OF CARPET. ALL CLEANING SHALL CODE, OR ANY OTHER ENTITY HAVING JURISDICTION OVER THE A � � 1 1 ACT ACOUSTICAL CEILING TILE
<br /> R or RAD RADIUS Nelco Architecture, Inc.
<br /> RFORMING THE WORK. BE IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. WORK, THE WORK OF THE MORE STRINGENT NATURE CALLED OUT A7'1 A7-1 ADJ ADJACENT H RB RUBBER BASE
<br /> SHALL BE FURNISHED IN ALL CASES. AFF ABOVE FINISH FLOOR H HIGH RBR RUBBER a licensed affiliate of Nelson Worldwide Inco
<br /> 2. THE GENERAL CONTRACTOR SHALL CONTACT BUILDING 15. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATING SHEET NUMBER SHEET NUMBER AHJ AUTHORITY HAVING HB HOSE BIB RCP REFLECTED CEILING PLAN �
<br /> MANAGEMENT TO DETERMINE THE RULES OF THE BUILDING THE WORK OF ALL SUB-CONTRACTORS AND SHALL PERFORM SUCH 33. FOR A�L MATERIALS PURCHASED,THE CONTRACTOR SHALL FURNISH SHEET GROUP JURISDICTION HC HOLLOW CORE RECEPT RECEPTACLE
<br /> RELATIVE TO CONSTRUCTION; WHEN AND HOW DELIVERIES CAN BE MISCELLANEOUS WORK AS MAY BE NECESSARY FOR THEM TO MATERIALS WHICH YIELD THE HIGHEST PERCENT OF PRE- WALL SECTION TAG AHU AIR HANDLING UNIT HDW HARDWARE RECT RECTANGULAR
<br /> MADE, WHAT PHASES AND TYPES OF CONSTRUCTION MAY BE DONE COMPLEfE THEIR WORK. IT IS EXPECTED THAT THE GENERAL CONSUMER(POST-INDUSTRIAL) AND POST-CONSUMER RECYCLED DISCIPLINE CODE ALT ALTERNATE(ING) HEX HEXAGONAL REF REFERENCE
<br /> ON REGULAR OR OVERTIME BASIS,AND IN GENERAL ANY SPECIAL CONTRACTOR SHALL ALSO CLOSELY COORDINATE THE WORK WITH CONTENT. THE CONTRACTOR SHALL FURNISH THESE MATERIALS SECTION ALUM ALUMINUM REINF REINFORCING or
<br /> BUILDING REQUIREMENTS WHICH WILL AFFECT THE COST OF ALL THAT OF ALL OTHER VENDORS RETAINED BY THE CLIENT TO WITHIN THE PARAMETERS OF THE BUDGET AND SHALL NOT DESIGNATION ANOD ANODIZED REINFORCEMENT 1200 Fift
<br /> WORK BORNE BY THE GENERAL CONTRACTOR. ALL WORK SHALL ASSURE THAT ALL SCHEDULES ARE MEf AND THAT WORK PROCEEDS PURCHASE ANY COST-ADDING MATERIAL OR PAY A PREMIUM APPROX APPROXIMATE HM HOLLOW METAL REQ'D REQUIRED h Avenue
<br /> CONFORM TO ALL BASE BUILDING STANDARD SPECIFICATIONS AND WITHOUT DELAY. ' NORTH ARROW GRAPHIC SCALE A7-1 Seattle, WA 98101
<br /> (MORE THAN FAIR MARKET VALUE) WITHOUT PROJECT MANAGER ARCH ARCHITECT HORIZ NORIZONTAL RET RETURN
<br /> BUILDING REGULATIONS, WHICH THE CONTRACTOR SHALL OBTAIN AND OWNER ACKNOWLEDGEMENT AND APPROVAL. NORTH AUTO AUTOMATIC HR HOUR REV REVISE or REVISION Phone: (206)408-8500
<br /> PRIOR TO SUBMISSION OF BID. 16. BIDDERS, BEFORE SUBMITTING PROPOSALS, SHALL VISIT AND PLAN NORTH SHEET NUMBER AVG AVERAGE HT HEIGHT RH RIGHT HAND Fax: (206)223-4990
<br /> CAREFULLY EXAMINE THE AREA AFFECTED BY THE WORK TO 34. FOR ALL MATERIALS PURCHASED,THE CONTRACTOR SHALL FURNISH HTG HEATING RHR RIGHT HAND REVERSE
<br /> 3. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR SUB- FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS AND ANY MATERIALS MANUFACTURED WITHIN A 500 MILE RADIUS OF THE � TRUE NORTH 0 1/2' 1° 2' B HTR HEATER RM ROOM
<br /> CONTRACTORS' RECEIPT OF COMPLETE SETS OF THESE DOCUMENTS, DIFFICULTIES THAT MAY AFFECT EXECUTION OF THE WORK. PROJECT SITE WHERE AVAILABLE, WITHIN BUDGET, WITHIN FAIR DETAIL SECTION TAG B/S BUILDING STANDARD HVAC HEATING VENTILATION & RO ROUGH OPENING
<br /> AS WELL AS ALL FUTURE ADDENDA, BULLETINS, FIELD DIRECTIVES SUBMISSION OF A PROPOSAL WILL BE CONSTRUED AS EVIDENCE MARKET VALUE AND DO NOT PRESENT RISK TO THE PROJECT B�1N BETWEEN AIR COND. ROW RIGHT OF WAY
<br /> AND CHANGE ORDERS. SECTION BEV BEVELED HW HOT WATER RPM REVOLUTIONS PER MINUTE
<br /> THAT SUCH AN EXAMINATION HAS BEEN MADE, AND LATER CLAIMS SCHEDULE. DESIGNATION
<br /> WILL NOT BE RECOGNIZED FOR EXTRA LABOR, EQUIPMENT, OR BLDG BUILDING HWY HIGHWAY RSF RENTABLE SQUARE FEET
<br /> 4. THE CONTRACTOR SHALL COORDINATE WITH BUILDING MATERIALS, REQUIRED BECAUSE OF DIFFICULTIES ENCOUNTERED 35. FOR ALL NEW WOOD PRODUCTS, INCLUDING BUT NOT LIMITED TO COLUMN SYMBOL&GRID LINES INTERIOR ELEVATION TAG 1 BLK BLOCK RT RUBBER TILE
<br /> MANAGEMENT THE STORAGE OF MATERIALS AND SHALL PROVIDE WHICH COULD HAVE BEEN REASONABLY FORESEEN HAD SUCH PARTICLE BOARD, MDF, PLYWOOD, OSB AND WOOD DOORS,THE A� 1 BLKG BLOCKING I RTU ROOF TOP UNIT
<br /> PROTECTION AS NECESSARY TO PREVENT VANDALISM AND LOSS OF EXAMINATION BEEN MADE. THE GENERAL CONTRACTOR SHALL CONTRACTOR SHALL FURNISH MATERIALS THAT CONTAIN NO 1 ELEVATION BSMT BASEMENT IN INCHES RWC RAINWATER CONDUCTOR
<br /> MATERIALS BY THEFT OR DAMAGE SUSTAINED DUE TO EXPOSURE VERIFY ALL CONDITIONS AND DIMENSIONS ON THE JOB SITE AND ADDED UREA-FORMADALHYDE. � DESIGNATION SHEET NUMBER BTM BOTTOM INCAND INCANDESCENT
<br /> TO INAPPROPRIATE ENVIRONMENTAL CONDITIONS AND WILL REPORT ANY AND ALL DISCREPANCIES AND/OR UNUSUAL O BTU BRITISH THERMAL UNIT INCL INCLUDE(ING)or S
<br /> REPAIR AND REPLACE DAMAGE OR LOSSES AT THE CONTRACTOR'S CONDITIONS TO THE ARCHITECT PRIOR TO FINALIZING BIDS OR 36. DETAILS ARE INTENDED TO SHOW THE INTENT OF THE DESIGN. 4 A8-1 2 INCLUSIVE S SOUTH
<br /> EXTERIOR ELEVATION TAG
<br /> EN E WITHOUT CHARGE TO THE OWNER. COMMENCEMENT OF ANY CONSTRUCTION. MINOR MODIFICATIONS MAY BE REQUIRED TO SUITE FIELD SHEET C INFO INFORMATION SAN SANITARY
<br /> 3 NUMBER SECTION CER CERAMIC INSUL INSULATION SB STONE BASE
<br /> CONDITIONS. REQUIRED MODIFICATIONS SHALL BE INCLUDED AS O DESIGNATION CF CUBIC FEET INT INTERIOR SC SOLID CORE
<br /> S. WHERE ADJACENT AREAS BEYOND THE IMMEDIATE CONSTRUCTION 17. THE GENERAL CONTRACTOR SHALL MAKE KNOWN ANY AND ALL PART OF THE WORK. i
<br /> AREA WILL BE OCCUPIED DURING THE CONSTRUCTION PERIOD,THE LIMITATIONS, EXCLUSIONS, OR MODIFICATIONS TO THE PROJECT DATUM POINT 1 � CONTROL JOINT SCHED SCHEDULE
<br /> CONTRACTOR SHALL: DURING THE BID SELECTION PERIOD. ANY AND ALL LIMITATIONS, 37. ALL WORK SHALL BE EXECUTED IN A WORKMANLIKE MANNER BY I A7-1 CL CENTERLINE � SCHEM SCHEMATIC
<br /> EXCLUSIONS, OR MODIFICATIONS NOT ITEMIZED IN THE BID MECHANICS AND TRADES PERSONS SKILLED IN THEIR RESPECTIVE � CLG CEILING JAN CLOS JANITOR'S CLOSET SE SOUTHEAST
<br /> A. CONFORM TO OWNERS AND TENANT REQUIREMENTS FOR PROPOSAL DOCUMENTS ARE PRESUMED "INCLUDED", IN WHICH TRADES AND IN ACCORDANCE WITH THE BEST TRADE PRACTICES. SHEET NUMBER CLOS CLOSET JB JUNCTION BOX SECT SECTION
<br /> HOURS OF CONSTRUCTION OPERATIONS, ACCESS TO CASE NO ADDITIONAL MONIES WILL BE ALLOCATED FOR THIS CLR CLEAR JST JOIST SF SQUARE FOOTAGE
<br /> TENANT SPACES AND ALLOWABLE NOISE LEVEL DURING WORK. CMU CONCRETE MASONRY UNIT �T JOINT SHWR SHOWER
<br /> 38. THE CONTRACTOR SHALL CONFIRM THE AVAILABILITY AND VERTICAL ELEVATION SPOT ELEVATION PARTIAL PLAN &DETAIL TAG COL COLUMN SIM SIMILIAR
<br /> TENANT BUSINESS HOURS DELIVERY TIMES FOR ALL SPECIFIED MATERIALS AND EQUIPMENT
<br /> B. ENSURE THAT CONSTRUCTION OPERATIONS DO NOT BLOCK 18. EXISTING CONSTRUCTION AND DIMENSIONS SHOWN ARE PER REQUIRED TO PERFORM THE WORK UPON RECEIPT OF THE LeV2I NaCTIe CONC CONCRETE K SPEC SPECIFICATION(S)
<br /> HALLWAYS, ACCESSIBLE ROUTES OR MEANS OF EGRESS FOR EXISTING DRAWINGS. ALL EXISTING INFORMATION MUST BE CONTRACT DOCUMENTS. SHOULD THE AVAILABILITY OF SPECIFIED LeVel Naf1l8 CONSTR CONSTRUCTION KD KNOCK DOWN SPKR SPEAKER
<br /> TENANTS OF BUILDING. EI@VatIOCI � � PLAN OR DETAIL CONT CONTINUOUS KIT KITCHEN SQ S UARE
<br /> VERIFIED IN THE FIELD. NEITHER THE OWNER NOR THE ARCHITECT ITEMS POSE A DELAY TO THE ON-TIME COMPLETION OF THE � � Q
<br /> C. ENSURE THAT CONSTRUCTION OPERATIONS DO NOT CAUSE IS RESPONSIBLE FOR ACCURACY OF EXISTING INFORMATION. PROJECT,THE CONTRACTOR SHALL NOTIFY THE ARCHITECT EleVat1011 SIM DESIGNATION CONTR CONTRACTOR SQ FT SQUARE FOOT
<br /> INTERRUPTIONS OF ELECTRICAL SERVICES TO THE TENANTS OF EXISTING CONSTRUCTION CONDITIONS IN AREAS WHERE NEW IMMEDIATELY AND PROPOSE AN EQUIVALENT SUBSTITUTION TO � CORR CORRIDOR � SSTL STAINLESS STEEL
<br /> THE BUILDING WITHOUT PRIOR NOTIFICATION AND WORK IS NOT PLANNED MAY BE NOT COMPLETELY SHOWN. BE REVIEWED BY THE ARCHITECT IF SUCH A DELAY IS NOT CPT CARPET L LOW
<br /> I A6-1 SIMILAR DETAIL ST STREET
<br /> APPROVALS. THE CONTRACTOR SHALL PROPERLY PROTECT ALL CT CERAMIC TILE LAM LAMINATE(D) STD STANDARD
<br /> FLOORS, MAIL CHUTES AND STAIR DOORS IN PUBLIC AREAS 19. WITHIN ONE(1) WEEK(FIVE BUSINESS DAYS), OF THE AWARD OF ACCEPTABLE. MATCH LINE BREAK LINE CTR CENTER LAV LAVATORY
<br /> � � SHEET NUMBER CU FT CUBIC FEET LF LINEAR FEET STL STEEL
<br /> SUBJECT TO CONSTRUCTION TRAFFIC. SHOE WIPING MATS THIS CONTRACT, PRIOR TO MOBILIZATION FOR ANY WORK, THE 39. SUBSTITUTION OF ALL EQUALS SHALL BE ONLY AS APPROVED BY LH LEFf HAND STOR STORRGE
<br /> WILL BE INSTALLED AT ALL OPENINGS BETWEEN CONTRACTOR SHALL FURNISH A CONSTRUCTION SCHEDULE THE ARCHITECT. WHERE THE TERM "OR EQUAL" IS USED THE �Z��-1 ^ D LHR LEFT HAND REVERSE STRUCT STRUCTURE or
<br /> CONSTRUCTION AREAS AND ALL PUBLIC SPACES. ALL ACTIVE SHOWING CHRONOLOGICALLY THE PHASES OF THE WORK, AND ALL ARCHITECT SHALL BE THE SOLE JUDGE OF EQUALITY BASED UPON v- STRUCTURAL
<br /> AREAS SHALL BE KEPT C�EAN AND FREE FROM DEBRIS. RELATED WORK FOR COMPLETION OF THE PROJECT. THIS SCHEDULE THE INFORMATION FURNISHED BY THE CONTRACTOR. � DEPTH LL LIVE LOAD SUSP SUSPENDED
<br /> �� SHEET NUMBER DRAWING TITLE DBL DOUBLE LONG LONGITUDINAL SW SOUTHWEST
<br /> D. ERECT AND MAINTAIN TEMPORARY BRACING, LIGHTS, SHALL INDICATE ALL ORDERING LEAD TIMES, LENGTH OF TIME FOR SUBSTITUTIONS MUST BE ACCEPTED IN WRITING BEFORE THEY MAY ���L NUMBER DEG DEGREES LVL LEVEL
<br /> DUST-PROOF PARTITIONS, BARRICADES, FENCES AND WARNING EACH PHASE, ITS START AND COMPLETION, WITH A PROJECTED BE USED. TITLE SYMB SYMBOL
<br /> SIGNS AS NECESSARY TO PREVENT INJURY, NOISE, DUST AND COMPLETION DATE. DEMO DEMOLITION or DEMOLISH �� LUXURY VINYL TILE SYS SYSTEM
<br /> INCONVENIENCE TO OTHER TENANTS,THE PUBLIC, AND TO DEPT DEPARTMENT Consultant:
<br /> 40, THE CONTRACTOR SHALL PREPARE SUBMITTALS FOR REVIEW BY � View Name DF DRINKING FOUNTAIN M T
<br /> PREVENT DAMAGE TO ADJACENT CONSTRUCTION WHICH IS TO 20. THE GENERAL CONTRACTOR AND SUB-CONTRACTORS SHALL ATTEND THE ARCHITECT, FOR ALL MATERIALS AND EQUIPMENT SPECIFIED. CENTERLINE LEADERS DIAG DIAGONAL M HAL METAL HALIDE
<br /> BE LEFf IN PLACE. JOB MEETINGS REQUIRED BY THIS CONTRACT. IF THE CONTRACTOR, THE OWNER, OR THE OWNER'S Al-1 1�g�� _ 1'-0" T TREAD(S)or TILE Descri
<br /> E. FOLLOW THE RECOMMENDED CONTROL MEASURES OF THE NOTE &KEYNOTE DIAM DIAMETER MAINT MAINTENANCE T8c6 TOP&BOTTOM pt���� No� BY� Date:
<br /> REPRESENTATIVE SUBSTITUTES A MATERIAL, METHOD OF � DISP DISPENSER MAS MASONRY T&G TONGUE&GROOVE REVIEW SET HF 0 /1 /18
<br /> SHEET METAL AND AIR CONDITIONING NATIONAL 21. ALL REQUIRED PERMITS MUST BE OBTAINED FROM THE FIRE ATTACHMENT, REVISES A CONSTRUCTION DETAIL, OR IN ANY WAY � LEADER DN DOWN MATL MATERIAL
<br /> � CONTRACTORS ASSOCIATION (SMACNA) IAQ GUIDELINES FOR DEPARTMENT PRIOR TO START OF CONSTRUCTION. ALTERS THE WORK SUCH THAT IT NO LONGER CONFORMS TO SCALE T'STAT THERMOSTAT PERMIT SET HF 05/22%18
<br /> OCCUPIED BUILDINGS UNDER CONSTRUCTION, 2ND EDITION AREA&E UIPMENT DR DOOR(S) MAX MAXIMUM TB TILE BASE
<br /> THESE DOCUMENTS, WITHOUT THE WRITTEN ACCEPTANCE OF THE Q DETAIL NUMBER DTL DETAIL MECH MECHANICAL TDB TO BE DETERMINED
<br /> � 2007, ANSI/SMACNA 008-2008 (CHAPTER 3). PROTECT STORED 22. ALL COSTS FOR INSPECTIONS AND/OR TESTS SHALL BE THE ARCHITECT, SUCH ACTION WILL RELIEVE THE ARCHITECT OF ANY � TAG LEADER ' DWG
<br /> � o ON-SITE AND INSTALLED ABSORPTIVE MATERIALS FROM RESPONSIBILITY OF THE CONTRACTOR, UNO. SHEET NUMBER DRAWING MED MEDIUM TEL TELEPHONE
<br /> � MOISTURE DAMAGE. RESPONSIBILITY OR LIABILITY INCLUDING, BUT NOT LIMITED T0, DWR DRAWER MEZZ MEZZANINE TEMP TEMPORARY or
<br />� AESTHETIC CONSEQUENCES, SUBSEQUENT FAILURE(S)AND MFR MANUFACTURER TEMPERATURE
<br /> � � F. IF PERMANENTLY INSTALLED AIR HANDLERS ARE USED DURING 23. THE CONTRACTOR SHALL PAY THE EXPENSES FOR ALL PERSONAL OR PROPERTY DAMAGE ATTRIBUTABLE TO THIS CHANGE. ROOM NAME AND NUMBER TAG PARTITION TAG WALL TYPE LE
<br /> CONSTRUCTION, FILTRATION MEDIA WITH A MINIMUM TRANSPORTATION, HOISTING AND ELEVATOR USE CHARGES ON ALL GEND E MIN MINUMUM TERR TERRAZZO
<br /> ' Room Name E EAST MISC MISCELLANEOUS
<br /> o � EFFICIENCY REPORTING VALUE (MERV) OF 8 MUST BE USED AT MATERIALS OR EQUIPMENT TO THE POINT OF USE, AND SHALL BE 41. REVIEW OF A SPECIFIC ITEM SHALL NOT INCLUDE REVIEW OF AN TG TEMPERED GLAZING
<br /> EACH RETURN AIR GRILLE. �p� g A NOT IN CONTRACT(NIC) EA EACH MO MASONRY OPENING THK THICK
<br /> W � RESPONSIBLE FOR ALL UNLOADING, CHECKING AND STORAGE OF ASSEMBLY OF WHICH THE ITEM IS A COMPONENT. EF EXHAUST FAN MTG MOUNTING
<br /> z � THE SAME IN CONNECTION WITH THIS CONTRACT. THRES THRESHOLD
<br /> I a EJ EXPANSION JOIN MTL METAL THRU THROUGH
<br /> 6. CUTTING, CHASING, DRILLING OR DEMOLITION OF WALLS, SLABS, 42. SUBMITTALS THAT CONTAIN EXCESSIVE ERRORS OR ARE EXISTING CONSTRUCTION TO REMAIN ELEC ELECTRIC(CAL)
<br /> � � ETC. REQUIRING THE USE OF]ACKHAMMERS OR OTHER HEAVY 24. OF THE INEVITABLE WASTE THAT IS GENERATED, AS MANY OF THE INCOMPLETE OR INADEQUATE MAY BE RETURNED WITHOUT FURNITURE TAG TOC TOP OF CONCRETE/CURB
<br /> � � HAND OR POWER TOOLS SHALL BE PERFORMED AFTER REGULAR WASTE MATERIALS AS ECONOMICALLY FEASIBLE SHALL BE REUSED, ACTION. COSTS INCURRED FOR THE RESULTANT DELAYS WILL BE ELEV ELEVATION or ELEVATOR N TOS TOP OF STEEL
<br /> li FURNITURE TAG EMERG EMERGENCY N NORTH TOW TOP OF WALL
<br /> a � BUSINESS HOURS ON AN OVERTIME BASIS IF NECESSARY, UNLESS SALVAGED, OR RECYCLED, WASTE DISPOSAL IN LANDFILLS SHALL THE RESPONSIBILITY OF THE CONTRACTOR. ENCL ENCLOSURE N/A NOT APPLICABLE/ NOT TRANSF T
<br /> � � THE BUILDING MANAGEMENT AND ANY AFFECTED TENANTS BE MINIMIZED. CONTRACTOR SHALL COORDINATE WASTE NEW CONSTRUCTION RANSFORMER
<br /> ENGR ENGINEER AVAILABLE TYP TYPICAL
<br /> � m VIDE A WRITTEN WAIVER EXPRESSLY PERMITTING OTHERWISE. MATERIALS HANDLING AND SEPARATION FOR ALL TRADES. 43. REVIEW OF SUBMITTALS SHALL NOT RELIEVE THE CONTRACTOR OF ENTR ENTRANCE NE NORTHEAST
<br /> z
<br /> � °; CONTRACTOR SHALL PROVIDE SEPARATION, HANDLING, OBLIGATIONS OR RESPONSIBILITIES FOR DEVIATIONS FROM THE E UIPMENT TAG ' EQ EQUAL NEC NATIONAL ELECTRIC CODE V
<br /> . � 7. THE GENERAL CONTRACTOR SHALL ASSUME SOLE AND COMPLETE TRANSPORTATION, RECYCLING, SALVAGE, AND LAND-FILLING FOR REQUIREMENTS OF THESE CONTRACT DOCUMENTS, UNLESS THE � �NINDOW TYPE TAG = _ _ = EXISTING CONSTRUCTION TO BE REMOVED EQUIP EQUIPMENT NEG NEGATIVE
<br /> � UC UNDERCUT
<br /> o p RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE ALL DEMOLITION AND WASTE MATERIALS. RECYCLABLE MATERIALS ARCHITECT IS NOTIFIED AND S P E C I F I C A L L Y A P P R O V E S O F,T H E X X 9 9 EQ U I P M E N T TAG lt E W E A C H WAY N I C N O T I N C ONTRACT UL UNDERWRI '
<br /> � O F C O N S T R U C T I O N O F T H I S P R O J E C T, I N C L U D I N G S A F E T Y O F A L L C A N B E C O M M I NGLED IN DUMPSTERS ON-SITE AS LONG AS DEVIATIONS AT THE TIME OF SUBMISSION. O NO NUMBER TER S
<br /> OVERHEAD SOFFIT/UPPER CABINET EWC ELECTRIC WATER COOLER LABORATORY
<br /> ` E � PERSONS AND PROPERTY. THIS REQUIREMENT SHALL APPLY PROVISION IS MADE FOR HAULING TO A TRANSFER STATION WHERE EXH EXHAUST NOM NOMINAL
<br /> � � CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING SEPARATION WILL OCCUR. TRANSFER STATION MUST PROVIDE 44, REVIEW OF SUBMITTALS SHALL NOT RELIEVE THE CONTRACTOR'S EXIST EXISTING NRC NOISE REDUCTION UNO UNLESS NOTED
<br /> � OTHERWISE
<br /> cn � HOURS. THE CONTRACTOR SHALL PROVIDE PUBLIC PROTECTION,AS DOCUMENTATION REPORTING TYPES OF MATERIALS SEPARATED BY OBLIGATION FOR COORDINATION NOR WAIVE RESPONSIBILITY EXP EXPANSION COEFFICIENT
<br /> ��O �� NECESSARY AND REQUIRED BY GOVERNING AGENCIES HAVING LOAD AND PERCENTAGE OF EACH LOAD. FINAL DESTINATION OF FOR ERRORS AND OMISSIONS IN THE SUBMITTALS, INCLUDING KEYNOTE DRAWING REVISIONS �- DEMOUNTABLE PARTITION (BY CONTRACTOR NTS NOT TO SCALE UPS UNINTERRUPTABLE POWER
<br /> � � EXT EXTERNAL or EXTERIOR SUPPLY
<br /> '' Q JURISDICTION, UNTIL CLIENT ACCEPTANCE OF THE PREMISES. SORTED MATERIALS MUST ALSO BE REPORTED. DIVERSION GOALS: "FIELD MEASURE." NW NORTHWEST
<br /> _a UR URINAL
<br /> L a� A MINIMUM 75% OF TOTAL PROJECT WASTE SHALL BE DIVERTED USF USABLE SQUARE FOOTAGE EVEREI-f OFFICE TOWER
<br /> = 8. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR THE FROM LANDFILL. THE FOLLOWING WASTE CATEGORIES, AT A 45. CHANGES IN THE SCOPE OF WORK OR IN CONSTRUCTION DETAILS, 100 REVISION NUMBER DEMOUNTABLE PARTITION BY VENDOR F O
<br /> 1 � ) FC FOOT CANDLES UTIL UTILITY
<br /> � PROVISION AND MAINTENANCE OF ALL BRACING, SHORING, MINIMUM, SHALL BE DIVERTED FROM LANDFILL: WHETHER DUE TO FIELD CONDITIONS OR OMISSIONS BY THE FCO FLOOR CLEAN OUT OC ON CENTER 2722 COLBY A
<br /> � � ENCLOSURES, BARRIERS OR SCAFFOLDING REQUIRED TO PROVIDE A TAG NUMBER REVISION DELTA OCC OCCUPANCY or OCCUPANT VENUE
<br /> CONTRACTOR, ARCHITECT OR OWNER, SHALL BE DOCUMENTED BY FD FLOOR DRAIN V V EVERETT, WA 98201
<br /> N N SAFE WORKING ENVIRONMENT AS DICTATED BY SITE CONDITIONS A. CLEAN DIMENSIONED WOOD, PALLET WOOD THE ARCHITECT AND APPROVED, PRIOR TO EXECUTION. � GLAZING � FE FIRE EXTINGUISHER OFF OFFICE OLT
<br /> Qz OH OVERHEAD or VENT
<br /> Q AND THE PROGRESS OF WORK, B. PLYWOOD, OSB, AND PARTICLE BOARD FEC FIRE EXTINGUISHER VAP R
<br /> OPG OPENING � VAPOR RErARDER
<br /> � C. CONCRETE 46. THE PRESENCE OF A REPRESENTATIVE OF THE ARCHITECT ON THE CABINET VAR VARIES
<br /> M� ii 9. DURING THE ENTIRE CONSTRUCTION PERIOD, ALL EXITS, EXIT D. CARDBOARD, PAPER, PACKAGING JOB SITE DOES NOT IMPLY CONCURRENCE WITH OR THE APPROVAL ALIGNMENT PARTIAL HEIGHT WALL FF FINISH FLOOR �PP OPPOSITE
<br /> = LIGHTING, FIRE PROTECTION DEVICES AND ALARMS SHALL BE E. METALS FHC FIRE HOSE CABINET OZ OUNCE(S) �B VINYL BASE
<br /> � OF ANY WORK. THE CONTRACTOR SHALL CALL TO THE ATTENTION ALIGN VCT VINYL COMPOSITION TILE
<br /> � � CONTINUOUSLY MAINTAINED IN CONFORMANCE WITH LOCAL F. GYPSUM DRYWALL(UNPAINTED) OF THE ARCHITECT, IN WRITING, ALL SPECIFIC ITEMS FOR WHICH NEW CONSTRUCTION TO FIG FIGURE �
<br /> BUILDING CODE AND OTHER GOVERNING ENTITY REQUIREMENTS. G. ACOUSTIC TILE P ENT VENTILITATION Building:
<br /> ' � ARCHITECT'S REVIEW IS RE UIRED. ALIGN OR FLUSH WITH FIN FINISH VERT VERTICAL
<br /> � � ALL EXISTING, SERVICES AND DEVICES SHALL REMAIN ACTIVE, UNO, H. PAINT Q RAISED FLOORING # Ib POUND
<br /> � EXISTING CONSTRUCTION FIXT FIXTURE VEST VESTIBULE
<br /> z �" I. GLASS 47. UPON SUBSTANTIAL COMPLETION OF WORK THE CONTRACTOR FLEX FLEXIBLE % PERCENT VIF VERI
<br /> 0� Q 10. THE CONTRACTOR SHALL PROTECT THE PROPERTY OF THE CLIENT J. PLASTICS �� �� FLOUR FLOURESCENT PART PARTIAL FY IN FIELD RqINIER TITLE OFFICE
<br /> o AND THE BUILDING OWNER. INCLUDING, BUT NOT LIMITED T0, K. CARPET AND PAD SHALL PREPARE A PUNCHLIST OF CORRECTIONS AND PASS PASSAGE VOL VOLUME
<br /> UNSATISFACTORY AND/OR INCOMPLETE WORK FOR REVIEW BY THE FLR FLOOR VTR VENT THROUGH ROOF
<br /> � o WINDOWS, FLOOR AND CEILING FINISHES, PUBLIC TOILETS, L. BEVERAGE CONTAINERS ARCHITECT. FOC FACE OF CONCRETE PED PEDESTAL VWC VINYL WALL COVERING
<br /> � � ELEVATORS, DOORS AND FRAMES, ELECTRICAL AND AIR- OBJECT STATE FIRE EXTINGUISHER FOM FACE OF MASONRY PERF PERFORATED
<br /> � 2722 COLBY AVENUE
<br /> a o CONDITIONING EQUIPMENT. THE CONTRACTOR SHALL PROTECT 25. THE CONTRACTOR SHALL MAKE ALL ARRANGEMENTS, MAINTAIN AND 48. THE CONTRACTOR SHALL MAINTAIN AT THE SITE, ONE RECORD E EXISTING TO REMAIN FEC SURFACE MOUNTED CABINET FOS FACE OF STUD PERP PERPENDICULAR W
<br /> v � ADJOINING PROPERTY. DAMAGE CAUSED BY THE CONTRACTOR'S PAY ALL COSTS FOR TEMPORARY WATER, PLUMBING, POWER, FP FIRE PROTECTIONS P� PLATE or PROPERTY LINE EVERETT, WA 9HZO1
<br /> � COPY OF ALL DRAWINGS, PERMITS, SUBMITTALS AND SAMPLES ON PLAM PLASTIC LAMINATE W WEST or WATT
<br /> � Q, WORK OR WORKMEN MUST BE MADE GOOD, IN A TIMELY FASHION. LIGHTING, HEATING OR VENTILATION REQUIRED TO PROPERLY WHICH TO RECORD ALL CHANGES DURING CONSTRUCTION. ACCESS FPL FABRIC PANEL W/ WITH Project Title &Address:
<br /> � j. PATCHING AND REPLACEMENT OF DAMAGED WORK SHALL BE CONDUCT THE WORK. TO THESE SHALL BE PROVIDED FOR THE USE OF ALL TRADES, N NEW FRTWD FIRE RETARDENT TREATED P� PLASTIC W�p WITHOUT
<br /> ~ � PERFORMED AT THE COST OF THE CONTRACTOR, THE CONTRACTOR WOOD PLYWD PLYWOOD
<br /> L � CLIENT REPRESENTATIVES AND THE ARCHITECT, DURING ALL �_ WB WOOD BASE
<br /> c .� SHALL BE FULLY RESPONSIBLE FOR ALL SUB-CONTRACTORS, IF THE 26. DO NOT SCALE THESE DRAWINGS; WRITTEN DIMENSIONS SHALL PHASES OF CONSTRUCTION. RECESSED CABINET FT FOOT or FEET POS POSITIVE W�
<br /> � � CONTRACTOR FAILS TO COMPLETE THE REPAIRS IN A TIMELY GOVERN. SHOULD ANY DIMENSIONAL DISCREPANCIES BE R RELOCATED FURR FURRING PR PAIR WATER CLOSET(TOILET) GENERAL NOTES, SYMBOLS &
<br /> FWC FABRIC WALLCOVERING PREFAB PREFABRICATED W� WOOD (SOFTWOOD) c
<br /> 00 o FASHION, SAID REPAIRS WILL BE MADE BY A CONTRACTOR ENCOUNTERED, CLARIFICATIONS SHALL BE OBTAINED FROM THE 49. DURING THE COURSE OF CONSTRUCTION,ACTUAL LOCATIONS WF WIDE FLANGE STEEL ABBREVIATION
<br /> ry N SELECTED BY THE OWNER'S REPRESENTATIVE AND BACK CHARGED OFFICE OF THE ARCHITECT. SHALL BE INDICATED TO SCALE IN RED INK ON THE OWNERS PROJ PROJECT or PROJECTED J
<br /> ^ FE G PROP PROPEf2TY or PROPOSAL WH WATER HEATER
<br /> � ^ ACCORDINGLY. RECORD DRAWINGS FOR ALL RUNS OF MECHANICAL AND X EXISTING TO BE REMOVED WALL MOUNTED W/0 CABINET WP WATERPROOF
<br /> � � 27. LARGE SCALE DETAILS SHALL GOVERN OVER SMALLER SCALE PLANS ELECTRICAL WORK INCLUDING CONCEALED WORK WHICH DEVIATES GALV GALVANIZED PSF POUNDS PER SQUARE FOOT WPT WORKING POINT
<br /> � 11. THE CONTRACTOR SHALL INDEMNIFY AND SAVE HARMLESS THE AND ELEVATIONS. GC GENERAL CONTRACTOR PSI POUNDS PER SQUARE INCH � Sheet Title:
<br /> � � WEI
<br /> � � LANDLORD, THE TENANT, AND ARCHITECT AGAINST ANY AND ALL
<br /> FROM THE DRAWINGS, UPON COMPLETION OF THE PROJECT, GEN GENERAL or GENERATOR PT PAINT GHT
<br /> INCLUDING ALL PUNCHLIST ITEMS, THIS INFORMATION SHALL BE DOO� PLUMBING FIXTURES GFI GROUND FAULT PTN PARTITION WWF WELDED WIRE FABRIC
<br /> � � CLAIMS AND DEMANDS FOR THE DAMAGE TO THE PROPERTY OF 28. INSTALL ALL EQUIPMENT AND MATERIALS PER MANUFACTURERS' NEATLY TRANSFERRED BY THE CONTRACTOR TO A SET OF
<br /> °' ANY PERSON FIRM OR INDIVIDUAL OR FOR PERSONAL INJURIES RECOMMENDATIONS. ANY DIFFICULTIES ARE TO BE REPORTED TO DRAWINGS, WHICH SHALL BE MARKED "AS BUILT SET"AND COPIES INTERRUPTER
<br /> TOILET '` MOP-
<br /> w w (INCLUDING DEATH) ARISING OUT OF, OR SUFFERED WHILE THE ARCHITECT IMMEDIATELY. SHALL BE PROVIDED TO BOTH THE OWNER AND THE AR '> J ' '
<br /> CHITECT. UTILITY SINK k.�;4,
<br /> > > ENGAGED IN, OR CAUSED, IN WHOLE OR IN PART, BY THE �,� �{r ,ry�'�����
<br /> WITHIN THREE(3) WEEKS (15 BUSINESS DAYS) OF THE RECEIPT OF EXISTING DOOR TO REMAIN URINAL GENERAL NOTES (CONT.� �4�� rr�di� �
<br /> z z EXECUTION OF THE WORK; THE CONTRACTOR SHALL WELL AND 29. THE CONTRACTOR AND EACH SUB-CONTRACTOR SHALL WARRANTY THE AS BUILT SET. APPROVAL FOR FINAL PAYMENT TO THE �
<br /> � o TRULY DEFEND THE LANDLORD, TENANT AND ARCHITECT AND ALL WORK PERFORMED BY THEM DIRECTLY FOR A MINIMUM PERIOD CONTRACTOR SHALL BE GRANTED, OR REASONABLE CAUSE SHOWN ���
<br /> a a SHALL PAY ALL MONIES AWARDED FOR SUCH DAMAGES OR OF ONE(1) YEAR, OR AS SPECIFIED IN THE CONSTRUCTION SINK- \ x SHOWER 51. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER IN THE EVENT THAT MOLD OR ASBESTOS IS ���-��G����G� • '
<br /> WHY SUCH APPROVAL HAS BEEN DENIED. COUNTER UNCOVERED. THE OWNER SHALL RETAIN A QUALIFIED CONSULTANT WHO SHALL ARRAN �������
<br /> = INJURIES(INCLUDING DEATH), ALL COSTS INCLUDING ATTORNEY'S CONTRACT. ALL DEFECTS OCCURING IN THE GUARANTEED PERIOD GE FOR THE PROMPT `' �'E "� x tYii,��,��_, '' ' .
<br /> = MOUNTED IDENTIFICATION, TESTING TREATMENT
<br /> � �; FEES SUSTAINED, AND SHALL OBTAIN A FULL ACQUAINTANCE AND SHALL BE CORRECTED AT NO ADDITIONAL COST. 50. PRIOR TO THE COMPLETION OF THE WORK, THE CONTRACTOR ~ NEW/ RELOCATED/ MODIFIED DOOR , , REMEDIATION AND STORAGE OF THE MOLD OR ASBESTOS AS
<br /> E � RELEASE IN FAVOR OF THE LANDLORD,TENANT AND ARCHITECT, SHALL ASSEMBLE AND FURNISH THE CLIENT A COMPLETE SET OF ¢ `��'` BI-LEVEL REQUIRED BY LAW AND GOOD CONSTRUCTION PRACTICES. THE ARCHITECT S
<br /> HALL BEAR NO RESPONSIBILITY
<br /> � � UNLESS SUCH LIABILITY RESULTS SOLELY FROM THE NEGLIGENCE 30. THE CLIENT,ARCHITECT, CONSULTANTS AND ALL INSPECTORS FROM MANUFACTURERS'CATALOG, OPERATING INSTRUCTIONS,START-UP SINK- WALL �`" �/ATER COOLER FOR WORK RELATED TO THESE MATERIALS.
<br /> ;� � OF THE LANDLORD,TENANT, ARCHITECT, ITS AGENTS OR PERTINENT AGENCIES SHALL BE PERMITTED ACCESS TO THE JOB CHECK LISTS, MAINTENANCE INSTRUCTIONS AND SIMILAR DATA, AS ,' � MOUNTED Seal:
<br /> � � EMPLOYEES. SITE AT ALL TIMES DURING NORMAL WORKING HOURS. WELL AS ALL GUARANTEE(S) FOR ALL EQUIPMENT AND OPERABLE � u 52. THE CONTRACTOR IS ADVISED THAT THE PREMISE HAS NOT BEEN TESTED FOR LEAD PAINT R
<br /> 0 OTHER Proj. No: 18,01772.00 Designer: EB
<br /> � DEVICES FURNISHED OR INSTALLED BY THE CONTRACTOR UNDER d '� � TOILET POTENTIALLY HAZARDOUS MATERIALS. THE CONTRACTOR SHALL USE ALL APPROPRIATE PRECAUTIONS IN THE
<br /> 11' `•" 12. THE ARCHITECT SHALL NOT BE HELD RESPONSIBLE FOR THE 31. THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS,AND THIS CONTRACT, AND SHALL ORIENT AND INSTRUCT THE EXISTING DOOR TO BE REMOVED PARTITION CARRYING OUT OF ALL CONSTRUCTION OPERATIONS WHICH MIGHT DISTURB SUCH MATERIALS. Drawn By: HF Reviewed By: MDE
<br /> �
<br /> N � PERFORMANCE OF ANY WORK, NOR FOR THE MEANS AND METHODS EQUIPMENT NECESSARY TO EXECUTE ALL WORK, EXCEPT WHERE PERSONNEL DESIGNATED BY THE CLIENT IN THE OPERATION OF ALL Pro'ect Mana r:
<br /> ] ge KF Approved By: MDE
<br /> � oo OF CONSTRUCTION CHOSEN BY THE CONTRACTOR OR ANY SUB- NOTED AS NOT IN CONTRACT N.I.C. . 53. ALL CONTRACTORS SHALL CARRY PROPERTY DAMAGE AND PUBLIC LIABILITY INSURANCE AS RE UIRED BY AN
<br /> � ) SUCH EQUIPMENT. GOVERNING AGENCIES HAVING JURISDICTION AND COMPLYING WITH STATUTORY RE UIREM � Y
<br /> 0 o CONTRACfORS, NOR SHALL THE ARCHITECf GUARANTEE THE Q ENTS FOR
<br /> � � PERFORMANCE OF THEIR CONTRACTS. DISABILITY AND WORKMEN'S COMPENSATION. �
<br /> ~ � AN 2
<br /> ; �
<br /> � �
<br /> � �
<br /> o � �
<br /> � O ALL DIMENSIONS AND CONDITIONS MUST BE CHECKED AND VERIFIED
<br /> PERFORMING THE WORK.THE PROJECT MANAGER SHALL BE NOTIFIED IN
<br /> � a WRITING OF ANYT ISCREPAN ES PRIOR TO ROCE D NG y,���OR TO
<br /> H THE WORK.
<br /> OO NELSON WORLDWIDE,INC.2018 ALL RIGHTS RESERVED
<br />
|