My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2212 PINE ST 2016 Plans 2022-11-29
>
Address Records
>
PINE ST
>
2212
>
Plans
>
2212 PINE ST 2016 Plans 2022-11-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2022 1:14:40 PM
Creation date
5/3/2019 9:51:44 AM
Metadata
Fields
Template:
Address Document
Street Name
PINE ST
Street Number
2212
Permit
C1609-003
Year
2016
Notes
SFR ADDITION AND REMODEL
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demolition General Notes ��� ���������� <br />� - • � � �; ����� <br /> 1 . The intent of the demolition plans is to show the general nature <br /> of the demolition scope. The General Contractor is � <br /> �t�T� 5� '��A��il�Gg�3� <br /> responsible for visiting the job site and verifying the existing � <br /> conditions. The Generat Contractor should notify the Architect <br /> � immediately of any discrepancies. � ��� 3� ��-�a�� <br /> : � � <br /> � � <br /> 2. Working hours and sched. shall be coordinated by the z��,__ � � � �W , :�_.w� <br /> contractor with owner prior to and during construction. � � � � � T � C T � <br /> 3. Coordinate and verify with the owner all items to be salvaged 21620 84th Ave. S. <br /> prior to demolition. Ste. 200 <br /> Kent, WA 98032 <br /> 4. Conduct demolition operations & the removal of debris to �253) 468-7696 <br /> ensure minimum interference with streets, walks, & other �,ihbarchitects.com <br /> adjacent occupied or used facilities. Comply with local <br /> jurisdiction requirements for recycling and treatment of items The araW�ngs ana plans Set fortn on <br /> to be recycled. this set as instrument of service are, <br /> and shall remain,the property of IHB <br /> Architects. Use of this drawing is <br /> 5. Dispose of all demolished or removed materials legally off the ''m'tea to a spe���ea pro;e�t for <br /> persons named hereon. And for a <br /> site. Comply with all local hauling & disposal requirements, construction �f one bu�la�ng. any <br /> use or reuse of said drawings is <br /> strictly probibited without written � <br /> 6. Schedule all service shut-down(s) with the owner. Notify Per""SS'°"°fIHB�°n'te°ts , <br /> � 41'-0" owner a minimum time of one (1) week and additiona[y one (1) � <br /> 0 <br /> � <br /> hour prior to shut-down(s). a <br /> � 21'-0" 20'-0" o <br /> � <br /> 7. remove all abandoned anchor bolts & embedded itmes in --� �- <br /> concrete floors that protrude above the concrete floor surface �.�,,,� <br /> 0 <br /> � Z <br /> 8. Refer to Structural drawings for specific demolition notes � <br /> ^ � � regarding these disciplines. 0 a <br /> I � � <br /> � j 9. All contractors must take particular care when cutting, � <br /> � I removing, and excavating in and around existing structures ��"�/ � <br /> BEDROOM 3 � I and equipment (and utility lines where applicable). Actual field IJ_ F— O <br /> o (EXISTING locations of all the existing utilities are the contractors W N <br /> , NON-PERMITTED N� res onsibilit and must be located either b the re resentative � W � <br /> � ADDITION) N I p y y p � <br /> I of the utility company or by a private underground utility z �. Q <br /> ' � locating company prior to the start of demalition activities. O (n � <br /> , � j 10. Upon completion, clean the entire area of demolition to a tidy, — Z I— <br /> � I uniform condition removing all debris, dust partitions & � p„ � � <br /> � <br /> — � � associated materials used during the demolition. Clean all <br /> � � N � <br /> - � —� -- � � areas impacted by the demolition, including but not limited to, Q N W <br /> � � � a d J a c e n t o c c u p i e d a r e a s a n d a r e a s n o t w i t h i n t h e s c o p e o f N � <br /> � I �--------� wor k. Q W <br /> ��— I <br /> w � � <br /> 1 <br /> � BATH LIVING ROOM � 11 . Patch / Paint / Finishes: <br /> o � _ N � Tape, patch, sand smooth, and paint all existing interior walls = <br /> M BEDROOM 1 (--- � where damaged to upgrade to client-accepted condition. All � <br /> l�, i � � adjacent existing finishes damaged or affected by demolition <br /> `- ---- - - _�) EXST'G � or construction of new areas m scope of work shall be patched z <br /> � � � and repaired to meet client satisfaction. <br /> � PORCH � � <br /> / I <br /> o ' — ( <br /> . �--� <br /> � <br /> N � ; � ----; � � � Reference Notes <br /> E , , � <br /> � , � <br /> � _ _��� � ,�' 1 � • NEW FLOOR PLANS AND ELEVATIONS - REFER TO <br /> N � ARCHITECTURAL SHEETS <br /> � � � I _ � <br /> ' BEDROOM 2 � � KITCHEN � � I _______� • NEW FOUNDATION AND FRAMING PLANS REFER TO � � <br /> � � DINING � � STRUCTURAL SHEETS z Z <br /> -, ----, � <br /> ��� � , _ � Q <br /> ; � � � � � BATH , �� C�� ; — • NEW SITE PLAN (WITH NEW ADDITIONS) REFER TO �-- —1 <br /> � o ��----J N SHEET A1 .0 � � <br /> � � --� � �-------- M � <br /> , � � -, X o <br /> ;������ � � � %� �——— � (�1�-1 <br /> � � � � ---`"� � —�1.a'-/I�_�'� � _� � � W � <br /> , - �=-� I p W <br /> � ' � <br /> � Existing & Demo Legend Q � <br /> I 3'-63�8�� <br /> t: <br /> , <br /> — -_- EXISTING WALLS TO REMAW <br /> � <br /> � <br /> revisions: <br /> ; -------- D E M O � City Review Oct. 12 <br /> � 27'-13�4�� <br /> � Comments 2016 <br /> ,' PROPOSED NEW <br /> c <br /> job No: _ <br /> t <br /> date: September 27, 2017 <br /> drawn by: AP <br /> E X I S T I N G/D E M O P LA N `e�`eWed by: '"B <br /> � SCALE: 1 /2„ _ � �_��� . <br /> A2 . 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.