My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 10
>
Contracts
>
Capital Contract
>
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2019 9:58:06 AM
Creation date
5/3/2019 9:57:55 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
INTERWEST CONSTRUCTION INC.
Approval Date
3/26/2019
Department
Public Works
Department Project Manager
HEATHER GRIFFIN
Subject / Project Title
GRAND AVENUE PARK BRIDGE
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
10
Tracking Number
0000801
Total Compensation
$135,096.44
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EUH-1 <br /> L_ r208V,5.6KW,208V,3PH <br /> (L09) <br /> 30A <br /> 2A1 36 <br /> J � . <br /> AC-2B (ON ROOF) ���777 #10 <br /> 5/— <br /> 208V,18MCA,208V,1PH \/ 2A1-1,3,5 <br /> AC-1B (ON ROOF) T <br /> 134 <br /> iy <br /> 208V,18MCA,208V,1 PH <br /> • • 7---(2)4"C-COMM. <br /> AC-1A 111111110"-- '41 <br /> �• <br /> 208V,1 FLA,208V,1PH 34 <br /> rdij o(Lo7) (Lo7) <br /> AC-2A t0A 4 <br /> 208V,1 FLA,208V,1PH $ 3\\\ <br /> #10 79 <br /> I 0 18 1 <br /> (2)2-C UP TO BRIDG <br /> 2• —11,13 7 (L07) <br /> %OP 34 <br /> ©©LIGHTING CONTROL/CONTACTOR CABINET ilk 3 <br /> WIREWAY � <br /> TEL. BACKBOARD I ` 2A1-18,34 1 <br /> UTILITY METER 1---- DMX LIGHTING CONTROLLER <br /> 11 PANEL 2Af ABANDON UNDERGROUND CONDUITS <br /> 4"C—(4)#3/O, 1#4 GND I,.- 1 <br /> TO PAD MOUNT XFMR? tdi L__,,,,mg., ",f-~F I-- O7) i 1 <br /> SEE SHEET E1.00 <br /> L <br /> 2A1-36 <br /> 4"C—COMM.—gyp I (L09) <br /> 4"C—COMM. <br /> -t. <br /> TO FRONTIERa.COMM. VAULT TO CITY COMM. VAULTS <br /> SEE SHEET E1.00 SEE SHEET E1.00 <br /> 0 ELECTRICAL PLAN - UTILITY LEVEL <br /> E1.04 SCALE:1 4 = 1—0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.