My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 10
>
Contracts
>
Capital Contract
>
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2019 9:58:06 AM
Creation date
5/3/2019 9:57:55 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
INTERWEST CONSTRUCTION INC.
Approval Date
3/26/2019
Department
Public Works
Department Project Manager
HEATHER GRIFFIN
Subject / Project Title
GRAND AVENUE PARK BRIDGE
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
10
Tracking Number
0000801
Total Compensation
$135,096.44
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Grand Avenue Park Bridge <br /> Change Order No.: 10 <br /> Change Order Effective Date: 02-20-2019 <br /> CONTRACTOR <br /> BY /Caw( <br /> Officer Date: <br /> Exhibit A—Description of Changed Work <br /> L01 Railing Light System Change from Low Voltage Tape Lighting to Line Voltage LED Fixtures– <br /> The original low-voltage strip/tape lighting, identified as LO1 in the contract plans, will be replaced <br /> with a line voltage LED system with continuous baffles. The system will require approx. 8 new circuits <br /> to be run from the utility room to the tower. The change also includes a new Creston panel in the <br /> Utility Room that will house the dimmers for the multiple LED lighting zones. <br /> Exhibit B—Additional Contract Time: <br /> This change order adds 0 (zero) working days to the contract. <br /> Exhibit C—Existing and New Bid Item(s) <br /> New Bid Items (see attached) <br /> Submittals <br /> Submit shop drawings for lighting system to be installed beneath railing. <br /> Submit RAMS form for all materials to be incorporated into the work. <br /> Measurement and Payment <br /> Measurement for"L01 LED Railing Light with Baffles" shall be LS. <br /> Measurement for"Additional LO1 Railing Light in excess of 1350 LF"shall be by linear foot installed <br /> beneath the railing upper channel for the length of LO1 LED Railing Light with Baffles in excess of <br /> 1,3501f. <br /> Payment shall include all labor, equipment and materials to install the LO1 LED Fixtures as proposed <br /> in ICI–COP-015, where shown in the plans and/or where approved in the subsequent approved shop <br /> drawings. <br /> ATTACHMENTS(20 Additional Pages) <br /> • New Bid Items <br /> • ICI COPs-015, dated 2/22/19 <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.