Laserfiche WebLink
Project: Grand Avenue Park Bridge <br /> Change Order No.: 11 <br /> Change Order Effective Date: 02-21-2019 <br /> CONTRACTOR <br /> By 660tAA,c4.1a.c.- <br /> Officer Date: 2 /2o / /9 <br /> Exhibit A—Description of Changed Work <br /> L02 Fixture DMX Lighting Control Upgrade—The colored lights installed at the utility level that cast <br /> light under the bridge are designed to all be the same color at the same time. They will all be the same <br /> color. This change will allow each of the 14 lights fixtures to be individually controlled to a specific <br /> color. The City will be able to create different color schemes, if they so desire. <br /> Exhibit B—Additional Contract Time: <br /> This change order adds 0 (zero) working days to the contract. <br /> Exhibit C—Existing and New Bid Item(s) <br /> New Bid Items (see attached) <br /> Submittals <br /> Submit shop drawings/cut sheets for lighting system modifications. <br /> Submit RAMS form any additional materials that may be required to incorporate this change. <br /> Measurement and Payment <br /> Measurement and Payment for"L02 DMX Lighting Control Upgrade" shall be by lump sum. Cost <br /> includes all labor, equipment and materials to modify/program the L02 Fixtures as proposed in ICI— <br /> COP-011, dated 8/3/18. <br /> ATTACHMENTS(6 Additional Pages) <br /> • New Bid Items <br /> • ICI COPs-011 <br /> Page 3 of 3 <br />