My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 11
>
Contracts
>
Capital Contract
>
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2019 10:08:43 AM
Creation date
5/3/2019 10:08:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
INTERWEST CONSTRUCTION INC.
Approval Date
3/26/2019
Department
Public Works
Department Project Manager
HEATHER GRIFFIN
Subject / Project Title
GRAND AVENUE PARK BRIDGE
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
11
Tracking Number
0000801
Total Compensation
$6,987.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Grand Avenue Park Bridge <br /> Change Order No.: 11 <br /> Change Order Effective Date: 02-21-2019 <br /> CONTRACTOR <br /> By 660tAA,c4.1a.c.- <br /> Officer Date: 2 /2o / /9 <br /> Exhibit A—Description of Changed Work <br /> L02 Fixture DMX Lighting Control Upgrade—The colored lights installed at the utility level that cast <br /> light under the bridge are designed to all be the same color at the same time. They will all be the same <br /> color. This change will allow each of the 14 lights fixtures to be individually controlled to a specific <br /> color. The City will be able to create different color schemes, if they so desire. <br /> Exhibit B—Additional Contract Time: <br /> This change order adds 0 (zero) working days to the contract. <br /> Exhibit C—Existing and New Bid Item(s) <br /> New Bid Items (see attached) <br /> Submittals <br /> Submit shop drawings/cut sheets for lighting system modifications. <br /> Submit RAMS form any additional materials that may be required to incorporate this change. <br /> Measurement and Payment <br /> Measurement and Payment for"L02 DMX Lighting Control Upgrade" shall be by lump sum. Cost <br /> includes all labor, equipment and materials to modify/program the L02 Fixtures as proposed in ICI— <br /> COP-011, dated 8/3/18. <br /> ATTACHMENTS(6 Additional Pages) <br /> • New Bid Items <br /> • ICI COPs-011 <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.