Laserfiche WebLink
., . c t� <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. Connect side sewer per City Standard#601. <br /> 5. Connect side sewer per City Standard#'s 601, 602, 604. <br /> 6. Connecl all rooftop downspouts to the side sewer. <br /> 7. Connect rooftop down�pouts to the drainage system provided for this lot. <br /> 8. Rooftop runoH must be discharged to a roof downspout infiltration syslem per City of Everett Storm <br /> Manual 3-2.6.2. The approximate size trench is 3.5'wide, 2'deep and 25'long. See attachment for <br /> more details. <br /> 9. The contractor must meel wilh the Public Works Inspector to discuss polential drainage routing prior to <br /> beginning the projecl. <br /> 10. Install erosion conlroi measure:as delermined by the Public Works inspector, such as silt fence, straw <br /> bales, swales,or eros�on blanke�s. <br /> 11. Install erosion conlrol measures per City of Everett Standards for small parcels <br /> 12. Remove erosion control measures upon compietion of the project prior to final approval oi the permit. <br /> 13. All excavated material from toundalion, sidewalk and driveways shali be hauled lo an approved, <br /> permitled sile. No wasling of material is allowed on lhis building lot. <br /> 14. No dirt,mud, rocks or debris to be tracked onto roadway. <br /> 15. No building materials to be stacked on sidewalks and sidewalks to be kepl clean and open for <br /> pedestrian lravel. <br /> 16. Adjust waler meler box 1"above sidewalk grade. <br /> 17. Remove and replace curb, c�ulter and sidewalk as per City of Everett Standard Plan#'s 305A 8 306 on <br /> lhis proposal's frontage as directed by the Public Works Inspector(i.e. all unused driveways and any <br /> broken or damaged area musl be replaced). <br /> 18. Install a Type I concrete driveway per Cily of Everetl Standard#307. <br /> 19. Pave driveway from the front properiy line out to the street paving. <br /> 20. Contact the Wale� District for connecling provisions for this building's water and <br /> sewer services. <br /> 21. A catch basin as per City Standard Plan i7402�vith a gas trap per Standard Plan tt410 is required for the <br /> parking area. <br /> 22. If a sewer pump system is to be installed, the pressure line must discharge into a private manhole,then <br /> gravity ilow across the public riyht-of-way. <br /> 23. A sprinkler system is required for this building in compliance with the requirements of NFDA Standards <br /> 13D. <br /> PWCommenis <br />