My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2112 RUCKER AVE BELSHAW APTS 2018-01-01 MF Import
>
Address Records
>
RUCKER AVE
>
2112
>
BELSHAW APTS
>
2112 RUCKER AVE BELSHAW APTS 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2019 2:00:58 PM
Creation date
5/7/2019 1:59:17 PM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
2112
Tenant Name
BELSHAW APTS
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
., . c t� <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. Connect side sewer per City Standard#601. <br /> 5. Connect side sewer per City Standard#'s 601, 602, 604. <br /> 6. Connecl all rooftop downspouts to the side sewer. <br /> 7. Connect rooftop down�pouts to the drainage system provided for this lot. <br /> 8. Rooftop runoH must be discharged to a roof downspout infiltration syslem per City of Everett Storm <br /> Manual 3-2.6.2. The approximate size trench is 3.5'wide, 2'deep and 25'long. See attachment for <br /> more details. <br /> 9. The contractor must meel wilh the Public Works Inspector to discuss polential drainage routing prior to <br /> beginning the projecl. <br /> 10. Install erosion conlroi measure:as delermined by the Public Works inspector, such as silt fence, straw <br /> bales, swales,or eros�on blanke�s. <br /> 11. Install erosion conlrol measures per City of Everett Standards for small parcels <br /> 12. Remove erosion control measures upon compietion of the project prior to final approval oi the permit. <br /> 13. All excavated material from toundalion, sidewalk and driveways shali be hauled lo an approved, <br /> permitled sile. No wasling of material is allowed on lhis building lot. <br /> 14. No dirt,mud, rocks or debris to be tracked onto roadway. <br /> 15. No building materials to be stacked on sidewalks and sidewalks to be kepl clean and open for <br /> pedestrian lravel. <br /> 16. Adjust waler meler box 1"above sidewalk grade. <br /> 17. Remove and replace curb, c�ulter and sidewalk as per City of Everett Standard Plan#'s 305A 8 306 on <br /> lhis proposal's frontage as directed by the Public Works Inspector(i.e. all unused driveways and any <br /> broken or damaged area musl be replaced). <br /> 18. Install a Type I concrete driveway per Cily of Everetl Standard#307. <br /> 19. Pave driveway from the front properiy line out to the street paving. <br /> 20. Contact the Wale� District for connecling provisions for this building's water and <br /> sewer services. <br /> 21. A catch basin as per City Standard Plan i7402�vith a gas trap per Standard Plan tt410 is required for the <br /> parking area. <br /> 22. If a sewer pump system is to be installed, the pressure line must discharge into a private manhole,then <br /> gravity ilow across the public riyht-of-way. <br /> 23. A sprinkler system is required for this building in compliance with the requirements of NFDA Standards <br /> 13D. <br /> PWCommenis <br />
The URL can be used to link to this page
Your browser does not support the video tag.