Laserfiche WebLink
3 o - '. tuber 2017 <br /> Revised date: <br /> Procedures <br /> Turn thermostat control to high. Wait for heater fan to turn on. Check <br /> ttati1� iil it i ell fat e � to ensure that hot air is coming from unit. Turn thermostat to off <br /> da .l il'lgi l,�f position. Wait for heater to turn off. Return thermostat control to <br /> PitagedUTB, approximately 62 degrees.jt <br /> Equipment Name <br /> BUILDING HEATER <br /> Preventive Maintenance Check <br /> CHECK OPERATION <br /> Equipment Location <br /> SWS1 <br /> Number Of Confined Lock Out <br /> Periodicity Personnel Man Hours Space Required <br /> YEARLY 1 .25 NO NO <br /> Parts and Materials Required <br /> NONE <br /> NONE <br /> Tools Required <br /> NONE <br /> Ref Tech Manual <br /> Safety Cautions <br /> NONE <br /> Related Maintenance <br /> YEARLY DE-HUMIDIFIER CHECKS,YEARLY VENTILATION FOR <br /> MAINTENANCE <br /> Coordination Requirements <br /> NONE <br />