My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snohomish County 4/29/2019
>
Contracts
>
6 Years Then Destroy
>
2023
>
Snohomish County 4/29/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2019 9:56:18 AM
Creation date
5/9/2019 9:56:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snohomish County
Approval Date
4/29/2019
Council Approval Date
4/17/2019
End Date
10/31/2023
Department
Public Works
Department Project Manager
Mark Sadler
Subject / Project Title
Smith Island Pump Station O & M
Tracking Number
0001756
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Interlocal
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Checked Changed or * TTN REPAIR:OR�DER# I SERIAL,NUMBER I <br /> 01< . Svo'd .( Required <br /> 1 r <br /> 5.0 Engine_Exhaust System 1.Check for leaks <br /> 2.Drain exhaust condensation trap(If equipped) <br /> 3.Check rain cap <br /> g iEnglne-Electrical System <br /> 1. Check charging systems--Alternator Charge Rate <br /> —Battery Charger Rate <br /> 2.Check battery connections&terminals <br /> 3.Check battery electrolyte level <br /> 4.CheCk battery specific gravity(Note readings In comments If not acceptable) <br /> 6.Check engine safety controls,alarms&wiring <br /> 8.Check spark plugs,plug wires,point,cond,cap&rotor as necessary(Report comments <br /> If tune up le needed) <br /> 7.0 Engine-Related System <br /> 1.Check for vibration&metal cracks <br /> 2.Check engine mounting hardtware&tighten <br /> 3.Check engine for dirt/debris <br /> 1 <br /> 4.Grease fan pillow block bearing(If equipped) <br /> 8.0 Maln Generator <br /> 1.Check air inlet&outlet restrictions <br /> 2.Perform operation load test with site load(Only when approved by customer) <br /> 3.Check output circuit breaker for loose or unsatisfactory load and line lug connections <br /> 4.AC meter readings,when available Amp3 <br /> Volts Reg Ampi Amp2 <br /> 9.0 Transfer Switch , <br /> 1.Visually.chect alt conneatipns for signs of heat or other problems <br /> 2.Check control power Circuli breakers or fuses <br /> 3.Chedk.autoritatic transfer switch ;.�n <br /> jllllth'lStll.d n 'load;;' ;5ti ,j:9:Wit�ig i1)Illi g;ldad..i <br /> 4.System tested � �=' t 1 gj. <br /> 10.0 After Run Test <br /> 1 1.Check all control switches In"AUTO&circuit breakers closed <br /> 2.Check start switch in"AUTO" <br /> ENTER COMMENTS BELOW <br /> Vehicle# Total Round Trip Mlles Miles <br /> Iif additional notes required, utilize additional page 2 forms <br /> SIGNATURE OF TECHNICAN DATE SIGNATURE OF SITE REPRESENTATIVE DATE <br /> • TECHNICAN(PRINTED) SITE REPRESENTATIVE(PRINTED) <br /> Customer Site Copy Invoice Copy File Copy <br /> White j Pink 1 Yellow <br /> Page 2 <br /> Generator Maintenance Inspection Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.