My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 5/1/2019 Change Order 12
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 5/1/2019 Change Order 12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2019 10:26:38 AM
Creation date
5/13/2019 10:26:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
5/1/2019
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
12
Tracking Number
0000801
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Grand Avenue Park Bridge <br /> Change Order No.: 12 <br /> Change Order Effective Date: 04-03-2019 <br /> CONTRACTOR <br /> r. <br /> l <br /> rt <br /> BY 1 t._.�a i...�, / <br /> Officer Date: i{/ W/ , <br /> Exhibit A—Description of Changed Work <br /> Condition of Award(COA)DBE Subcontractor Change—Industry Erectors no longer wishes to <br /> assemble the bridge structure (see attached letter, dated Jan. 10, 2019). They will still assemble/install <br /> the stairs at the west stair tower. Industry Erectors is a COA DBE subcontractor with an original <br /> commitment of$250,000.00. Their commitment will be reduced to $74,420.00 (a reduction of <br /> $175,580.00). Interwest Construction will increase the commitment from three other DBE <br /> subcontractors. See attached change for Electric West, Puget Sound Steel and Western Industries. <br /> These additions total $175,580.00. Therefore, the COA commitment will remain unchanged at <br /> $2,255,219.00. <br /> Exhibit B—Additional Contract Time: <br /> This change order adds 0 (zero) working days to the contract. <br /> Exhibit C—Existing and New Bid Item(s) <br /> No new bid items or adjustements to existing bid items. <br /> Submittals <br /> No submittals required. <br /> Measurement and Payment <br /> Not applicable. <br /> ATTACHMENTS(6 Additional Pages) <br /> • GAPB Condition of Award Proposed Change (1 page) <br /> • Industry Erectors Letter, dated 1/10/19 (4 pages) <br /> • Interwest Construction Serial Letter #038, dated Feb. 11, 2019 (9 pages) <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.