My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3674-19
>
Ordinances
>
Ordinance 3674-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2019 10:57:10 AM
Creation date
5/21/2019 10:56:29 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3674-19
Date
5/1/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 1 TO ORDINANCE <br /> ATTACHMENT I <br /> SECOND AMENDMENT TO DEVELOPMENT AGREEMENT <br /> EVERETT RIVERFRONT REDEVELOPMENT (LANDFILL) <br /> FEIS MITIGATION REQUIRED <br /> Element of the Environment Action Mitigation is Where found in Resp.Party Implementation <br /> And tied to EIS Documents Time Frame <br /> Mitigation Measure <br /> through compliance <br /> with the Consent <br /> Decree and other <br /> licable laws. <br /> Environmental Health and Hazardous Waste SIL Implement measures spelled Any work where there DEIS 5.7.4.1 Responsible Prior to <br /> out in the soil management plan if suspect material is encountered. is party doing the development <br /> contaminated material. work/project permits <br /> For development of the <br /> Landfill,this mitigation <br /> measure is satisfied <br /> through compliance <br /> with the Consent <br /> Decree and other <br /> applicable laws. <br /> Noise AA: All construction activities must be in compliance with Chapter 20.08 <br /> EMC-Noise Control. Noise Measures A to G shall be implemented as necessary <br /> to ensure compliance with the standards. <br /> Noise A: Minimize construction noise with properly sized and maintained Any Construction DEIS 5.8.2.3 Responsible During <br /> mufflers,engine intake silencers,engine enclosures,and turning off equipment party doing the construction <br /> when not in use work/project <br /> Noise B:Stationary construction equipment should be located away from sensitive Any Construction DEIS 5.8.2.3 Responsible During <br /> receiving properties where possible. Where this is infeasible,or where noise party doing the construction <br /> impacts would still be likely to occur,portable noise barriers should be placed work/project <br /> around equipment with the opening directed away from any sensitive receiving <br /> property. These measures are especially effective for engines used in pumps, <br /> compressors,welding machines,etc.,that operate continuously and contribute to <br /> high, steady background noise levels. <br /> Noise D: Minimize backing during construction(to minimize back-up alarms) Any Construction DEIS 5.8.2.3 Responsible During <br /> party doing the construction <br /> work/project <br /> I-20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.